A Study of effective installation patterns of face bolts using 3D-FDM analysis (터널 안정화를 위한 페이스볼트의 효율적 배치에 관한 수치해석적 연구)

  • Seo, Kyoung-Won;Bae, Gyu-Jin;Nishimura, Kazuo;Domon, Tsuyoshi
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.2
    • /
    • pp.141-149
    • /
    • 2006
  • For application of NATM, the self-supporting until installation of the supporting system must be satisfied. However, the face of a tunnel are always unsupported and therefore it is fairly vulnerable to tunnel collapses. Face blots are well known and widely used to prevent the deformation of the tunnel face and its circumference, which are installed horizontally toward the tunnel axis generally. To maximize the supporting effect of face bolts, this study has analysed the effective design patterns of face bolts by changing their installation angles. As the conclusion, it has been found that the axial displacement of the face increases slightly by installing the outermost bolts upward from the axis but surface settlement at 2.5D behind the face decreases up to 18%.

  • PDF

Performance Evaluation of Organic and Inorganic Fiber Reinforced Concrete in Tunnel Lining Structure (유·무기 섬유 혼입 터널 라이닝 콘크리트 부재의 성능 평가)

  • Lee, Jong-Eun;Kim, Tae-Won;Kim, Su-Man;Jeon, Joong-Kyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.3 s.55
    • /
    • pp.110-118
    • /
    • 2009
  • The tunnel structure is widely used for transportation in the mountain area. To reduce the duration of construction and thus the expense, a tunnel excavation is often performed simultaneously with a tunnel lining in in-situ. However, cracking of the tunnel lining may occur arising from the vibrating impact in the excavation process. The present study concerns the role of steel fiber and nylon fibers in tunnel lining concrete to reduce the vibrating impact. As a result it was found that both the nylon fiber and steel fiber improved the durability and physical properties of concrete.

Development of Mucking Process Simulation Model for Productivity Improvement in Tunneling Operation (터널 버력처리 공정의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • So, Byoung Gak;Woo, Sung Kwon;Lee, Si Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1D
    • /
    • pp.83-91
    • /
    • 2008
  • This study establishes the model to estimate a work time and a machine equipment combination in a NATM tunnel. Also it includes the increasing rate of haulage distance in the model for to make near to reality model. A simulation model focuses on the mucking process which affects the work effectiveness very highly to plan of machine use in tunneling operation. With the analysis of work effectiveness through tunnel simulation model, it is defined the problem of planning phase. Also it shows the optimal working time and efficiency of machine used through change the number of dump truck and haulage distance.

A Blasting Experience in a Shallow Tunnel Section Overlain by Residential Structures (터널 상부 근접시설물 통과구간의 발파시공사례)

  • Won, Yeon-Ho;Kang, Choo-Won;Kim, Joung-In
    • Explosives and Blasting
    • /
    • v.26 no.2
    • /
    • pp.99-107
    • /
    • 2008
  • This study, to reduce a ground vibration damage of the structures in an area adjacent to housing structures located closely above the tunnel section, is the ground vibration reduction instance of a tunnel blasting selectively applied the ground vibration-controlled blasting method (delay time applied blasting method, large center hole cut method, Line Drilling method, etc) with an originally planned blasting method connected, but with it's workability and economic efficiency is satisfactory, so, the results says the ground vibration-controlled blasting method on a similar condition is very effective, even if the applicability is depend on the blasting method and ground condition of the work area.

Electronic Blasting for Excavating Single Line Railway Tunnel Close to Residential Area (보안물건이 근접한 소단면 철도 단선터널 굴착시 전자발파 시공사례)

  • Lee, Min Su;Kim, Hee Do
    • Explosives and Blasting
    • /
    • v.34 no.3
    • /
    • pp.17-20
    • /
    • 2016
  • This paper introduce a multistage parallel non-vibration electronic tunnel blasting cases which adapts Electronic Blasting System(EBS) and the center-cut blasting method to excavating a single line railway tunnel close to residential area. As a result, it was revealed that the vibration and noise showed a reduction of 23.5% and 75% of compared with the allowable standard. We successfully completed the tunnel excavation with decreasing construction time and construction cost and without civil compliant.

A Numerical Study on the Reduction Effect of Blasting Vibration with Cut Method (심발공법에 따른 발파진동 저감효과에 대한 수치해석적 연구)

  • Son, Ji-Ho;Kim, Byung-Ryeol;Lee, Seung-Joong;Kim, Nam-Soo;Lee, Hyo;Choi, Sung-Oong
    • Explosives and Blasting
    • /
    • v.37 no.1
    • /
    • pp.1-13
    • /
    • 2019
  • The repeated blasting vibration, which is induced commonly in NATM excavation site, can cause a severe damage to the nearby facilities. It is known that the most effective method for reducing blasting vibration includes the use of electronic detonator, deck charge and change of cut method, and so forth. In order to analyze the effect of blasting vibration reduction, in this study, three-dimensional FDM (Finite Difference Method) program FLAC3D has been used for reflecting the blasting hole, delayed time and charging amount. Also the numerical analysis has been performed by applying a dynamic load to each blasting hole. The cut method has been applied with several methods, such as V-cut and Double-drilled parallel cut, which are common in tunnel construction sites. Also, the field test blasting has been carried out in order to compare the measured data with results of numerical analysis. It was shown that the numerical analysis and the field measurement coincide well.

A Case Study of Tunnel Electronic Blasting to Control Vibration in the Proximity of the Gas Pipe (매설 가스관 근접 진동제어를 위한 터널 전자발파 시공사례)

  • Choi, Hyeong-Bin;Kim, Gab-Soo
    • Explosives and Blasting
    • /
    • v.31 no.2
    • /
    • pp.25-31
    • /
    • 2013
  • In this case of "Seongnam~Yeoju double-lanes railroad construction", there were resident houses and gas pipe which were concerned about damages from vibration and noise. Especially, gas pipe which is a diameter of ${\varphi}500mm$ was located under the ground along upside road. The limit of vibration was 1.0cm/sec to protect gas pipe. The electronic blasting systems have been used to control vibration & noise not only gas pipe but also resident houses. The results of tunnelling were successfully conducted with effective vibration control and quick excavation by electronic blasting without any damages to adjacent facilities.

A Study on the Ground Settlement and Reinforcement Measures in the Case of Tunnelling at the Yangsan Fault (양산단층대 터널시공에서 침하량 및 보강대책에 대한 연구)

  • Jung, Hyuksang;Kim, Hyeyang;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.6
    • /
    • pp.35-48
    • /
    • 2009
  • An excessive ground displacement occurs with excavating tunnel in a fault zone because the fault has properties of soft ground in generally. It may have had a bad influence to adjacent structure. So, rapid reduction of ground strength by groundwater inflow should be prevented. It must be established for an impervious and reinforcing effect of ground to ensure a tunnel stability. The ground settlement and reinforcing effects were estimated by numerical analyses on tunnel through 570 m sector in Yangsan fault zone of Keongbu high-speed railway. Settlements evaluated by numerical analysis is similar to those calculated by using equation of Loganathan & Poulo. It was shown that reliable estimate of ground settlement by applying a prediction equation is possible. Applicability of adopted tunnel reinforcement method in fault zone was investigated by results of pilot construction and numerical analysis. Results from this study indicate that the adopted reinforcement method make tunnel displacements and member stresses restrain in design criteria.

  • PDF

Evaluation of low-vibration electronic detonator blasting method to improve constructability in non-vibration excavation section (무진동 굴착구간에서의 시공성 향상을 위한 미진동 전자발파공법 평가)

  • Seung-won Jung;Jin-Hyuk Song;Nam-Sun Hwang;Hyun-Gi Kim;Nam-Soo Kim;Jong-woo Lee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.2
    • /
    • pp.157-173
    • /
    • 2023
  • Although this site is designed with a non-vibration excavation method for a section of 265 m, there are concerns about decline of constructability and economic feasibility. For this reason, the low-vibration electronic detonator blasting method was suggested. To evaluate the applicability of the low-vibration electronic detonator blasting method, the damage range of blasting vibration of low-vibration electronic detonator blasting applied just before the site (suggestion I) and low-vibration electronic detonator blasting constructed close range the subway like this site (suggestion II) was analyzed. As a result of comparing the blasting vibration damage ranges of the two suggestions, the damage range of suggestion II was calculated more conservatively. Considering the specificity of the close range of this site, suggestion II was selected for design change for safer construction. As a result, it is predicted that there will be no damage to the structure even if the 72 m section out of the non-vibration excavation 265 m section is changed to the Low-vibration electronic detonator blasting. And it is evaluated that high economic benefits can be obtained because the total expected excavation period can be reduced by 144 days from 662.5 days.