• Title/Summary/Keyword: 터널구간

Search Result 622, Processing Time 0.025 seconds

Relationship between V/C and Accident Rate for Freeway Facility Sections (focused on Shingal-Ansan Freeway) (고속도로 시설물 구간의 교통혼잡도와 사고율의 관계 분석 (신갈-안산 고속도로를 중심으로))

  • Oh, Cheol;Chang, Jae-Nam;Chang, Myeong-Sun
    • Journal of Korean Society of Transportation
    • /
    • v.17 no.2
    • /
    • pp.21-27
    • /
    • 1999
  • The objective of this study is to clarify the relationship between accident rate and V/C for freeway facility. The relationship can be used as a basic reference to predict and prevent traffic accident. The traffic volume and the number of accidents from 1992 to 1997 on Shingal-Ansan Freeway were analyzed in this study to clarify the relationship. Hourly accident rate and V/C were calculated for each facility sections : basic freeway section, tunnel section and toll gate section. The accident rate models consisting of an independent variable of V/C were established by repression analysis and compared with each other. The relationship between accident rates and V/C ratios represented U-shaped pattern for all sections. The result of this study indicates that accident rates are highest in the low hourly V/C range, decrease with increasing V/C ratio, and then increase as the V/C ratio increases. The accident rate of toll gate section is in general higher than that of other sections. Although the accident rate of tunnel section is higher than that of basic freeway section when V/C is above 0.67, there is no significant difference of accident rate between basic freeway and tunnel section when V/C is between 0.5 and 0.8. Basic freeway tunnel and toll gate section have the minimum accident rate when V/C is 0.78, 0.75 and 0.57 respectively.

  • PDF

A Study on the Road Capacity Reduction Rate of Freeway Tunnel Section (고속도로 터널부 도로 용량 감소율에 관한 연구)

  • Sunhoon Kim;Dongmin Lee;Sooncheon Hwang
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.23 no.3
    • /
    • pp.17-28
    • /
    • 2024
  • In this study, the capacity of the tunnel and the general section was calculated and compared using the VDS detector data, and the decrease rate in capacity of the tunnel section was analyzed by tunnel type. To compare the capacity of the tunnel and the general section, the Product Limit Method (PLM) was applied to the VDS detector data. As a result of comparing the capacity of the tunnel and general section, the capacity of the tunnel section decreased by about 6.5% compared to the general section. To classify the tunnel type, the tunnel extension and the number of lanes were used as variables, and there was a difference in the decrease rate of capacity by tunnel group classified by each criterion.

도수로터널 굴착에 따른 지하수 유출

  • 이병대;함세영;조병욱;이인호;이춘오;성익환
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2001.09a
    • /
    • pp.67-70
    • /
    • 2001
  • 터널 굴착에 따른 연구지역내 지하수체의 거동 특성을 파악하기 위하여 터널 굴착시 그라우팅 이전의 초기 유출량과 초기 그라우팅 이후의 구간별 유출량을 측정하였고 단열구조와 비교, 분석하였다. 초기 유출량은 120,990 m$^3$/day이며, 초기 유출이 심했던 구간은 크게 6개 구간으로 세분할 수 있다. 초기 그라우팅 후 지하수 유출이 심했던 구간 역시, 그라우팅 이전과 마찬가지로 6개 구간으로 세분할 수 있다. 그라우팅 전, 후의 유출량을 비교해 보면 그라우팅후의 유출량은 42,844m$^3$/day으로, 그라우팅 전에 비해 많이 감소되었다. 터널 굴착시 터널내로 유출되는 지하수의 대부분은 터널과 직교 혹은 사교하여 관통하고 있는 단층 및 단층 파쇄대와 연장성이 양호한 절리면들을 따라서 유동되고 있다. 터널내의 지하수 유출에 영향을 미치는 단열들은 대체로 4조의 불연속면군으로 분류 할 수 있는데, 주 분포방향은 크게 TSet 1 : N60-85$^{\circ}$W, TSet 3 : N40-50$^{\circ}$E, TSet 3 : N10-20$^{\circ}$E, TSet 4 : N70-80$^{\circ}$E이다.

  • PDF

Analysis of Groundwater-Level Variation Caused by Tunnel Construction at a Mountain Area (산악지역의 터널건설에 의한 지하수위 변동분석)

  • 강동환;정상용;심병완;김병우;정상원
    • Proceedings of the KSEG Conference
    • /
    • 2002.04a
    • /
    • pp.137-146
    • /
    • 2002
  • 수락산 터널구간 기반암의 평균투수계수는 $2.64{\times}10^{-6}cm/sec$, 평균RQD는 78%, 평균공극율 은 0.51% 이다. 지하수위와 표고간의 상관성분석을 이용하여 수락산 정상부에서 지하수위를 추정한 결과, 터널구간의 전체 평균수리경사는 0.267로서 산출되었다. 수리분석에 의한 수락산 터널구간에서의 지하수 유출량은 약 $66,378~121,574\textrm{m}^3/yr$, 함양량은 $863,500\textrm{m}^3/yr$로 산정 되었다. 3차원 지하수유동모델링 소프트웨어 MODFLOW를 이용하여 터널건설에 의한 지하수위 변동을 분석한 결과, 1년 후에는 터널 중심부에서의 지하수위 강하가 각각 40~45m로 나타났으며 터널구간의 지하수위는 3년 후에, 그리고 모델 영역 전체 지하수위는 4,5년 후에 완전하게 정류상태로 회복되었다.

  • PDF

Qualitative Factor Analysis on Speed Reduction of Drivers in Expressways Tunnel Section (고속도로 터널구간 도로이용자 속도감소의 정성적 요인분석 연구)

  • Park, Jun-Tae;Lee, Soo-Beom;Kim, Tae-Ho
    • International Journal of Highway Engineering
    • /
    • v.13 no.4
    • /
    • pp.151-158
    • /
    • 2011
  • Tunnel sections on the expressway are different from rest of sections on the expressway in terms of velocity, the number of passing cars, and vehicle density which, in particular, affect drivers' behavior before and after drivers pass through the tunnel. However, literature review reveals that former studies are too focused on quantitative indicator to consider qualitative aspects. Thus, this study tried to find out qualitative factors affecting speed reduction in tunnel sections based on questionnaire surveys and its analysis in tunnel sections selected by taking consideration of diverse conditions. Analysis showed that factors concerning tunnel configuration (lane width, shoulder width, and tunnel length) related to very long tunnels increasingly popular recently had some effects on reduced speed inside of tunnels. It appeared that visual environment such as visibility of tunnel entrance had an impact in speed reduction and vehicle speed tended to change according to lighting illumination level inside of tunnels. It is expected that continual investment would be made in technological development related to expressway tunnel design and service improvement based on this study.

Stability of Tunnel under Shallow Overburden and Poor Rock Conditions Using Numerical Simulations (수치해석적 방법을 통한 저토피 및 암질불량구간의 터널 안정성 검토)

  • Kim, Jungkuk;Kim, Heesu;Ban, Hoki;Kim, Donggyou
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.11
    • /
    • pp.39-47
    • /
    • 2021
  • Tunneling is widely increased in rail-road construction due to the large portion of mountainous regions in Korea as well as the improving running performance of train. Tunneling under poor rock condition, shallow overburden, or existing fault zone has high risk for collapse. Therefore, this study presents the stability of tunnel under unfavorable geological conditions using finite element methods.

Performance Evaluation of Mobile IP Using NHRP for Supporting Mobility over ATM Networks (ATM 망에서 NHRP를 이용한 Mobile IP 이동성 지원 방안의 성능평가)

  • 이성탄;변태영
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2001.10c
    • /
    • pp.811-813
    • /
    • 2001
  • 본 논문에서는 기존의 IP 망에서 호스트의 이동성을 지원하기 위한 Mobile IP 개념을 ATM 망에 적용할 경우, Mobile IP망에서 Home Agent와 Foreign Agent 사이에 존재하는 Mobile-IP 터널링 구간을 기존의 LAN 기반의 IP 터널링 구간과 ATM 망에서의 단거리 터널링(short-cut tunneling) 구간으로 구분하여 관리하는 방안을 제안하였다. Short-cut 터널링을 설정하기 위하여 NHRP를 이용하였으며 Shot-cut 터널링을 이용함으로써 HA 와 FA 사이에 데이터 전달 지연을 기존의 IP 터널링에서의 데이터 전달 지연보다 줄일 수 있음을 시뮬레이션을 통해 확인하였다.

  • PDF

대단면 근접병설터널의 설계 및 안정성 평가기법에 관한 연구

  • 김도형;박준경;김영근;오세준;이두화
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2003.03a
    • /
    • pp.51-66
    • /
    • 2003
  • 최근 용지매입의 제한과 자연환경훼손의 최소화를 도모하는 사회적 환경으로 인해 대단면 근접병설터널 계획이 점차 증가하고 있다. 지금까지는 주로 중앙벽체부의 지지기능을 활용한 2Arch터널의 형태로 도심지 지하철의 정거장이나 고속도로의 일부구간에 계획되고 있으나, 대단면 근접병설터널에 대한 시공실적 및 설계사례가 부족한 국내에서는 이에 대한 역학적 거동과 합리적 시공방안에 대한 연구가 미흡한 실정이다. 따라서, 대단면 근접병설터널에 대한 국내·외의 설계 및 시공사례를 정리·분석하므로서 차후 제한된 구간에서의 터널계획시 합리적인 설계 및 시공이 되고자 하였다. 또한, 최근 도심지 구간에 계획중인 터널의안정성 검토 사례를 중심으로 터널 및 인접구조물, 중앙필러부 및 콘크리트 라이닝에 대한 상세 안정성 검토방법을 고찰함으로써 기존 병설터널의 거동특성과는 구별되는 대단면 근접 병설터널의 안정성 평가기법에 대한 방향을 제안하였다.

  • PDF

Analyzing drivers' visual response variation in very long expressway tunnel ; the Yuksimnyeong tunnel (장대터널에서의 운전자 시각각성변화 분석연구 (육십령터널을 대상으로))

  • Kim, Ju-Yeong;Kim, Hyeon-Jin;Jang, Myeong-Sun
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.1
    • /
    • pp.17-25
    • /
    • 2009
  • This research analyzed the changes of drivers' visual workload with beta wave of bionic signals from brain's occipital lobe from entrance to exit section of the Yuksimnyeong tunnel which is 3.1km long in Daejeon-Tongyeong section of Jungbu expressway. There are 10 subjects who Participate our experiments and the results are as follows. First. the drivers' visual workload is higher about 41% in entrance section of the tunnel than 200m in advance of the section of the tunnel. Second, it is higher than 200m in advance of the section of the tunnel by 34.5% that the value of the drivers' visual workload who is driving in the tunnel. Third, as a result of analyzing the tunnel into 200m unit section, it is statistically different from other sections' at the 1.0km and 2.4km section from the entrance of the tunnel. If drivers sustain average visual workload for safe driving in very long tunnel, it's not desirable environment that drivers' visual workload goes under the average workload. Therefore, it would be the section where drivers who is driving in tunnel could cause a traffic accident.

Study on the Impact Of Tunnel Construction on Geo-environment - Simulation study on the Gyerong tunnel - (터널굴착이 지반환경에 미치는 영향에 관한 연구 - 계룡산 터널의 시뮬레이션 결과를 중심으로 -)

  • Lim, Hyung-Gyu;Chang, Yoon-Young
    • Journal of Soil and Groundwater Environment
    • /
    • v.13 no.5
    • /
    • pp.88-95
    • /
    • 2008
  • In this study, impact of tunnel construction on groundwater level and flow was investigated by simulation modeling, and tried to find optimal assessment method for minimization of geo-environmental problems due to tunnel construction. As a study area, Gyerong mountain area scheduled for tunnel construction was selected and the impact of tunnel construction on geo-environment compared to situation before construction was simulated. Simulation result showed that groundwater level down was observed during tunnel construction and recovered after completion of tunnel construction.