Characteristics of Subsidence above a Shallow Tunnel Excavated in Weathered Rock Mass (풍화암반 저심도 터널 굴착 중 발생한 지표침하의 특성)

  • Kim, Chee-Hwan
    • Tunnel and Underground Space
    • /
    • v.23 no.5
    • /
    • pp.337-346
    • /
    • 2013
  • The characteristics of subsidence above a shallow tunnel excavated in weathered rock mass is analyzed. The tunnel is excavated minimum about 11m beneath some buildings and the width of the tunnel is 11m, too. Subsidence pins are installed at 23 locations on surface along the tunnel, 180m long, adjacent to the buildings. Subsidences are measured for about 2 years and they are optimized to analyze three dimensional deformed ground surface, trough width parameter K and sectional volume loss of unit tunnel length Vs of the surface deformation profile.

Productivity Improvement by Application of Simulation based Tunneling Operation Planning Model - focused on NATM - (시뮬레이션 기반 터널공사계획모델 개발을 통한 생산성 향상 연구 - NATM 공법을 대상으로 -)

  • Lee, Si-Wook;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.127-136
    • /
    • 2008
  • The initial step in the construction process, estimating appropriate construction time and expense is the most important factor that would influence the result of the construction. In order to enhance productivity and efficiency, there is a need to analyze and manage rationally. The purpose of this project is to make a simulation model for all subway tunnel construction based on the NATM method, also give an support equipment that would make available to plan and analyze the construction. The development of simulation model is based on a real case construction analysis process and also on the reference data. It reflects restrictive elements, make it possible to modify the conditions, and not only adapt to our project's construction but other projects as well. The model developed by this project will be able to reasonably predict the construction completion time and support the process of decision making during the planning. Therefore we can expect the productivity and efficiency of the whole construction projects.

Use of the Tunnel Seismic Prediction Method for Construction of Spillways at Juam Dam (터널 내 탄성파탐사(TSP)기법의 주암댐 보조여수로 적용 사례 연구)

  • Bae, Jongsoem;Chang, Chandong
    • The Journal of Engineering Geology
    • /
    • v.23 no.1
    • /
    • pp.67-77
    • /
    • 2013
  • We conducted a Tunnel Seismic Prediction (TSP) survey in a spillway tunnel at Juam Dam to predict the locations of major discontinuities ahead of the tunnel face. We compared the results of the TSP survey with those from pre-construction inspections (including a surface resistivity survey and borehole investigations) as well as with direct tunnel-face mapping during excavation. The TSP method predicted the locations of major fracture zones that were unnoticed in the pre-construction inspections. The reinforcement patterns planned on the basis of pre-construction inspections were changed on the basis of the TSP results. The results demonstrate that TSP surveys are a cost-effective and reliably accurate method of predicting the locations of fracture zones. Although the TSP method has some limitations, these results suggest that the method is generally useful for predicting geological conditions prior to tunnel face construction.

Application of New Type Accelerator for High Quality Shotcrete (고품질 숏크리트 개발을 위한 새로운 급결제 적용)

  • Park, Hae-Geun;Lee, Myeong-Sub;Kim, Jea-Kwon;Jung, Myung-Keun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.1
    • /
    • pp.45-55
    • /
    • 2002
  • From the early 1980's, the New Austrian Tunnelling Method (NATM) has been developed as one of the standard tunnelling methods in Korea. Approximately 10 years ago, wet-mix shotcrete with sodium silicate (waterglass) accelerator was introduced and widely used to tunnel lining and underground support. However, this accelerator had some disadvantages due to the decrease of long-term strength compared to plain concrete (without accelerator) and low quality of the hardened shotcrete. In order to compensate for these disadvantages, recently developed alkali-free accelerator has been successfully demonstrated in numerous projects and applications as a new material to make tunnels more durable and safer. An experimental investigation was carried out in order to verify the strength behavior of wet-mix Steel Fiber Reinforced Shotcrete (SFRS) with alkali-free accelerator. Compressive strength, flexural strength, and flexural toughness were measured by testing specimens extracted from the shotcrete panels. From the results, wet-mix SFRS with alkali-free accelerator exhibited excellent strength improvement compared to the conventional shotcrete accelerator.

  • PDF

Economic Feasibility Analysis of a Tunnel Section Enlargement Method That Does Not Halt Traffic Flow (교통류 보존형 터널단면 확대 시공기술의 경제적 타당성 분석)

  • Lee, Seung Soo;Kim, Dong-Gyou;Seo, Jong Won
    • The Journal of Engineering Geology
    • /
    • v.25 no.4
    • /
    • pp.459-472
    • /
    • 2015
  • A recently developed tunnel section enlargement method can maintain traffic flow during construction by using a protector. By keeping traffic flowing, it can minimize the lost time and costs associated with diversions and also the accompanying environmental pollution. On the other hand, installing the protector can lengthen the construction period and increase the direct cost. This paper presents a method for analyzing the economic feasibility of tunnel section enlargement methods considering the direct construction cost and the indirect social cost. The indirect costs are divided into categories of: vehicle driving cost, travel time delay cost, and environmental pollution cost. The economic efficiency of existing technology is compared with the new method in an case study of Namsan Tunnel 3.

A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul (서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.18-30
    • /
    • 2023
  • Purpose: This study is to contribute to the development of monitoring technology through the increase of confidence in construction monitoring by deriving the analysis of construction monitoring cost and improvement measures of railway tunnel construction in Seoul. Method: It presents the status on design and contract of construction monitoring cost, status on application construction monitoring cost and its analysis, analysis on safety management cost and quality management cost, expansion of application of the price calculation standard for monitoring management services to improve this, and monitoring for direct order of ordering organization. Results: If the monitoring management service that was meanwhile ordered as included in the construction work is performed by the directly selected company of ordering organization through the preliminary screening for bidding qualification, then the improvement of monitoring quality and the accurate monitoring data can be secured. Conclusion: For the price calculation standard for monitoring management service, the application of actual cost addition method under the Engineering Promotion Act and the calculation standard of monitoring management cost for standard estimation for ground survey should be extended through the direct order of ordering organization, not the method to be included in the net construction cost where it is performed by a subcontractor via contractor.

A preliminary study on economical efficiency of a room-and-pillar excavation method in comparison with 2-arch tunnelling method (2아치 터널 굴착 공법과의 비교를 통한 주방식 굴착 공법의 예비 경제성 검토 연구)

  • Lee, Chulho;Chang, Soo-Ho;Ahn, Sung-Youll;Shin, Hyu-Soung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.6
    • /
    • pp.599-612
    • /
    • 2013
  • This study aims to investigate an economical efficiency of two excavation methods with respect to the room-and-pillar method for the underground space and conventional excavation method, i.e. 2-arch tunnelling method. For feasibility study, an excavation cost for both room-and-pillar method and 2-arch tunnelling method was estimated when the same space in operation was required. It was assumed that properties of reinforcements and rock were adopted from literatures. However, an excavation shape of the room-and-pillar method was assumed not to be the rectangular shape which is a general type in the room-and-pillar method but to be an arch shape in order to compare with the conventional excavation method (2-arch tunnelling) and to achieve the maximum bearing capacity of the structure during excavation. Consequently, the wider space in use or required and the better condition of rock we assumed, the more economical advantage we have in the room-and-pillar method than the 2-arch tunnelling method.