• Title/Summary/Keyword: 터널간격

Search Result 211, Processing Time 0.031 seconds

Relation between Groundwater Inflow into the Waterway Tunnel and Hydrogeological Characteristics in Hyeonseo-myeon, Cheongsong-gun, Korea (청송군 현서면 일대 도수로터널내 지하수 유입량과 수리지질 특성의 관련성)

  • 박재현;함세영;성익환;이병대;정재열
    • The Journal of Engineering Geology
    • /
    • v.11 no.2
    • /
    • pp.141-152
    • /
    • 2001
  • The waterway tunnel zone (length 1,484m) in the Hyeonseo-myeon area that is a part of Yeongcheon dam waterway tunnel has been studied to characterize the relationship between groundwater inflow into the waterway tunnel and hydrogeologic characteristics. The effects of sandstone thickness in the tunnel section. fracture density, fracture aperture and spacing, fault zone width and hydraulic conductivity on the early inflow (inflow prior to the lining and grouting) are investigated. The relationship between fracture density and hydraulic conductivity is also considered. The result of the study suggests that fault zone width has the greatest effect on groundwater inflow into the tunnel, and sandstone thickness, hydraulic conductivity and fracture density in order shows an influence on the inflow.

  • PDF

The CO Gas Concentration Characteristics in a Sound Proof Road Tunnel According to the Upper Opening Installation Distance Interval (방음터널 내부의 상부배출구 간격에 따른 CO 농도분포 특성)

  • Park, Myung Sig
    • Journal of ILASS-Korea
    • /
    • v.21 no.3
    • /
    • pp.162-169
    • /
    • 2016
  • When we construct a road near an apartment complex, we consider a soundproof wall. To make residential places quieter, we may consider a soundproof road tunnel. Such a tunnel, however, would become highly concentrated with soot from vehicles whenever a traffic jam might occur. To create an optimum design, this study utilizes the PHOENICS-VR software. The work considers three cases: (1) no openings (2) openings at 30m intervals, and (3) openings at 60m intervals on the upper side of the tunnel. The study finds that in the second case shows CO concentration distributions were 15% less than those without openings. And the CO concentration distributions of the second and third cases are almost the same. The findings suggest that we should make the soundproof tunnel to reduce construction fees.

Engineering Rock Properties in Seoul Granite (서울화강암의 암반 공학적 특성)

  • 정상원;정상용
    • Proceedings of the KSEG Conference
    • /
    • 2002.04a
    • /
    • pp.201-210
    • /
    • 2002
  • 서울시 북동부의 서울화강암에 대한 암반 공학적 특성 중 터널과 도로 건설시 중요하게 취급되는 절리의 방향성, 절리간격, 절리밀도, 암석의 일축압축강도, 그리고 RQD 값을 수락산과 불암산지역으로 구분하여 비교, 분석하였다. 이 중 절리의 방향성, 절리간격과 절리밀도는 선조사법, 원형조사법, 그리고 면적조사법을 이용하여 야외에서 직접 측정하였다. 암석의 일축압축강도와 RQD의 측정은 시추코아의 표본이 필요하지만 이번 연구에서는 간단히 응용할 수 있는 대비공식을 이용하여 계산하였다. 측정된 대표적인 절리의 방향성은 두 지역에서 모두 3조의 방향성이 나타났으며 즉 2조의 수직정방절리와 저각으로 경사하는 1조의 판상절리로 판명되었으며 두 지역에서 서로 유사한 방향성을 갖는다. 측정된 절리밀도는 0.039-0.066/cm이었으며, 평균절리길이는 1.30-4.52m, 그리고 평균절리간격은 10.3cm에서 최대 59.6cm로 측정된 절리의 방향에 따라 변화가 심하다 또한 슈미트 해머 타격값에 근거한 절리면의 일축압축강도는 217 MPa에서 335 MPa로 매우 강한 암체였으며, 평균절리간격에 기초하여 계산된 이론적 RQD 값은 73.1-98.7%의 값을 갖는 것으로 나타났다.

  • PDF

Thermal Analysis of a Horizontal Disposal System for High-level Radioactive Waste (수평 터널방식 고준위폐기물 처분시스템 주변 열 해석)

  • Choi, Heui-Joo;Kim, In-Young;Lee, Jong Youl;Kim, Hyun Ah
    • Tunnel and Underground Space
    • /
    • v.23 no.2
    • /
    • pp.141-149
    • /
    • 2013
  • The thermal analysis is carried out for a geological disposal system developed for the final disposal of a ceramic high-level waste from pyroprocessing of PWR spent fuel. The horizontal disposal tunnel type is considered with the distance of 2 m between the disposal canisters and the tunnel spacing of 25 m. The temperature distributions around the disposal canisters are calculated for the horizontal tunnel based on the conceptual design. The thermal performance analysis is carried out using a FEM program, ABAQUS. The performance analysis shows that the peak temperature in a disposal system outside the disposal canister is lower than $100^{\circ}$, which meets the thermal criterion of the disposal system. According the analysis, the peak temperature for the disposal canister located boundary of the disposal system is lower by $3^{\circ}$ than that for the canister at the central area. This implies the disposal density can be improved by locating more disposal canisters along the boundary.

Study of the Characteristics of Smoke Spread by an Installing Smoke Barrier in Medium Length Road Tunnel (중규모 도로터널의 제연경계벽 설치에 따른 연기확산특성)

  • Baek, Doo-San;Lee, Seung-Chul
    • Fire Science and Engineering
    • /
    • v.30 no.5
    • /
    • pp.9-17
    • /
    • 2016
  • In the case of a medium length road tunnel, the installation of a smoke control facility is not mandatory so users can suffer considerable injuries if a fire breaks out. Therefore, this study analyzed the high-temperature air and toxic gas generated by fire proliferating with time when a smoke barrier is not installed and when the installation interval is 100, 150, 200, and 250 m through 3-dimensional numerical analysis, evacuation simulation, and Quantitative Risk Assessment Methodology targeting the medium length road tunnel. As a result, the diffusion of the high-temperature air and toxic gas occurring from the a fire was delayed when the smoke barrier was installed in a medium length road tunnel compared to that when it was not installed. In addition, when the installation interval of a smoke barrier was 100m and the numerical analysis target was 100m, the diffusion of high-temperature air and toxic gas generated by the fire was delayed more than in the other cases, which was most suitable for tunnel users to evacuate.

Effects of evacuation delay time and fire growth curve on quantitative risk for railway tunnel fire (철도터널 화재 시 피난개시시간지연 및 화재성장곡선이 정량적 위험도에 미치는 영향)

  • Ryu, Ji-Oh;Kim, Hyo-Gyu;Lee, Hoo-Young
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.5
    • /
    • pp.809-822
    • /
    • 2018
  • A quantitative risk assessment has been introduced to quantitatively evaluate fire risk as a means of performance based fire protection design in the design of railway tunnel disaster prevention facilities. However, there are insufficient studies to examine the effect of various risk factors on the risk. Therefore, in this study, the risk assessment was conducted on the model tunnel in order to examine the effects of the evacuation start time delay and the fire growth curve on the quantitative risk assessment. As a result of the analysis of the scenario, the fatalities occurred mainly when escapes in the same direction as the direction of the fire smoke movement. In addition, after the FED exceeded 0.3, the maximum fatalities occurred within 10 minutes. In the range of relatively low risk, distance between cross passages, evacuation delay time and fire growth curve were found to affect the risk, but they were found to have little effect on the condition that the risk reached the limit. Especially, in this study, it was evaluated that the evacuation delay time reduction, fire intensity and duration reduction effect were not observed when the distance between cross passages was more than 1500 m.

A study on the smoke control performance of the damper exhaust system at FCEV fire in tunnel for small vehicles (소형차 전용터널 내 수소연료전지차 화재시 집중배기방식의 제연성능에 관한 연구)

  • Hong, Seo-Hee;Baek, Doo-San
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.745-756
    • /
    • 2022
  • The road tunnel is a semi-closed space that is blocked on all sides except the entrance and exit, and in the event of a fire, the smoke of the fire spreads longitudinally due to heat buoyancy caused by the fire and air currents that always exist in the tunnel. To solve this problem, smoke removal facilities are installed in road tunnels to secure a safe evacuation environment by controlling the direction of movement of smoke or directly smoking at fire points. In urban areas, the service level of urban roads decreases due to the increase in traffic due to the increase in population, and as a solution, the construction of underground roads in urban areas is increasing. When a fire occurs during hydrogen leakage through TPRD of a hydrogen fuel cell vehicle (FCEV), the fire intensity depends on the amount of leakage, and the maximum fire intensity depends on the orifice diameter of the TPRD. Considering the TPRD orifice diameter of 1.8 mm, this study analyzed the diffusion distance of fire smoke according to the wind speed of the roadway and the opening interval of the large exhaust port when the maximum fire intensity was 15 MW. As a result, it was analyzed that air flow in the tunnel could be controlled if the wind speed of the road in the tunnel was less than 1.25 m/s, and smoke could be controlled within 200 m from the fire if the damper interval was 50 m and 100 m.

Tunnel Reverse Engineering Using Terrestrial LiDAR (지상LiDAR를 이용한 터널의 Reverse Engineering)

  • Cho, Hyung Sig;Sohn, Hong Gyoo;Kim, Jong Suk;Lee, Suk Kun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.931-936
    • /
    • 2008
  • Surveying by using terrestrial LiDAR(Light Detection And Ranging) is more rapid than by using total station which enables tunnel section profile surveying to be done in suitable time and minimize centerline error, occurrence of overcut and undercut. Therefore, utilization of terrestrial LiDAR has increased more and more in section profile survey and measurement field Moreover, studies of terrestrial LiDAR for accurate and efficient utilization is now ongoing vigorously. Average end area formula, which was generally used to calculate overcut and undercut, was compared with existing methods such as total station survey and photogrammetry. However, there are no criteria of spacing distance for calculating overcut and undercut through terrestrial LiDAR surveying which can acquire 3D information of whole tunnel. This research performed reverse engineering to decide optimal spacing distance when surveying tunnel section profile by comparing whole tunnel volume and tunnel volume in difference spacing distance. This result was utilized to produce CAD drawing for the test tunnel site where there is no design drawings. In addition to this, efficiency of LiDAR and accuracy of CAD drawing was compared with targetless total station surveying of tunnel section profile. Finally, error analysis of target coordinate's accuracy and incidence angle was done in order to verify the accuracy of terrestrial LiDAR technology.

Reinforcing Effect of Pre-Tensioned Rock Bolts in the Jointed Rocks Condition (록볼트 긴장에 의한 수평절리암반의 보강효과)

  • An, Joung-Hwan;Lee, Sang-Duk
    • Tunnel and Underground Space
    • /
    • v.19 no.5
    • /
    • pp.388-396
    • /
    • 2009
  • Rock bolt is one of the most important supports for tunnelling to prevent excessive ground relaxation at the primary tunnel excavation stage. It forms a ground arch band by confining the ground around a tunnel. Rock bolt has various effects, such as support or hanging effect, internal pressure effect, arching effect, ground improvement effect etc. Most studies on rock bolt focused on the concept of support, but only a few researches on the ground reinforcing effect by pre-tensioning a rock bolts. In this study, large scale model tests are performed to investigate the ground reinforcing effect of rock bolts for regularly jointed rocks. Simple beam model was built to find out the reinforcing effect of jointed rocks, which was reinforced by pre-tensioned rock bolts. Settlement of model beam was analyzed through measuring its sagging for various installation intervals.

Prediction of ling concrete thickness for cable tunnel by GPR and impact-echo method (지중레이다와 충격반향기법에 의한 지하 통신구 터널의 라이닝 두께 추정)

  • Kim Hyung-Woo;Han Jin-Woo;Choi Kwang-Chul;Kang Ho-Kyung;Park Jong-Ho
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2003.08a
    • /
    • pp.382-384
    • /
    • 2003
  • 지하 30m 암반에 건설된 통신구 터널의 안전성을 검토하기 위하여 콘크리트 라이닝 두께를 지중레이다(Ground Penetrating Radar)와 충격반향기법(Impact-Echo Method)으로 추정하였다. 지중레이다에 의한 콘크리트 라이닝 단면의 연속적인 화상으로부터 라이닝 두께의 상대적인 변화를 파악하였으며, 라이닝 두께가 얇은 구간은 충격반향 기법에 의해 일정 간격으로 두께를 추정하였다. 터널 천장의 라이닝 두께는 31.85cm, 좌측 및 우측 측벽부의 라이닝 두께는 각각 32.45cm. 32.97cm로서 설계 값인 30cm와 비교적 잘 일치하는 것으로 파악되었다. 지중레이다와 충격반향기법을 조합한 본 방법은 터널 라이닝 콘크리트 두께를 추정하는데 있어서 매우 효율적이고 신뢰성 있는 방법으로 분석되었다.

  • PDF