• Title/Summary/Keyword: 택지개발사업

Search Result 104, Processing Time 0.03 seconds

A Study on the Land Development Administration System in the Local Self-Government (지방자치단체의 토지개발사업에 관한 고찰)

  • Hwang, Eui-Jin
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.7 no.2 s.14
    • /
    • pp.111-122
    • /
    • 1999
  • Since 1980 the Korea Land Development Coporation has played a major role in land development by means of a Public Initiated Land Development Scheme. This strategy has attempted to correct the market failure of the generation of large sum of windfall profits. In accordance with reimplementation of the local autonomous ruling system since 1991, the demend for local government initiated land development have increased rapidly as local governments attempt to math the influence of national local development policy. In this regards, it is very useful for urban planners to analyze the merits and dismerits of the local government initiated land development schemes in view of national agency's development. This paper recommends several mitigation measures to improve the settlement of the local government initiated land development scheme.

  • PDF

Development a Spatial Analysis System using the Case-based Reasoning Approach (사례기반 추론방법을 적용한 공간분석 시스템)

  • 오규식;최준영
    • Spatial Information Research
    • /
    • v.9 no.2
    • /
    • pp.171-184
    • /
    • 2001
  • The nature of ill-defined planning problems makes expert systems difficult to acquire and represent knowledge for decision making in urban planning processes. In order to resolve these problems, a case-based reasoning method was applied to develop a spatial analysis system for urban planning. A case study was conducted in a residential land use planning process. The result of the study revealed the effectiveness of reasoning by the spatial analysis system and the possibility of its future application. More accumulation of information on other successful cases should be sought to yield better results

  • PDF

u-city and National Land Information Projects for Housing Development Site (택지개발사업지구에서의 U-city와 국토정보화사업)

  • Kim, Hyeong-Bok
    • 한국공간정보시스템학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.93-98
    • /
    • 2005
  • u-city의 구축에는 정보통신관련 전문가가 주도적으로 참여하고 있으며, u-city는 정보통신 인프라 설치, 도시정보관제센터 건립 및 시스템 구축 운영, 디지털 컨텐츠서비스 제공으로 구성된다. 디지털 컨텐츠의 주요구성요소는 서비스생활환경컨텐츠, 도시관리컨텐츠, 상거래컨텐츠로서 공공포탈서비스를 통해 지역 사회에 제공된다. 본고는 디지털 컨텐츠에 추가될 수 있는 컨텐츠로서 건설교통부와 한국토지공사에서 추진하고 있는 국토정보화사업의 개요와 장점을 소개하고 u-city와 연계하며, 향후 u-city의 구축에서 도시계획가 참여의 필요성을 제시한다.

  • PDF

A Study on the Demand Zone of Housing for New Town: Focused on Seoul Metropolitan Area (택지개발지구의 주택 수요권역 실증 연구: 수도권을 중심으로)

  • Kim, Jong-Lim;Cho, Han-Jin;So, Soon-Woo
    • Land and Housing Review
    • /
    • v.6 no.3
    • /
    • pp.107-115
    • /
    • 2015
  • Recently one of interest concern in domestic housing market is to reduce the difference of supply and demand. Exact demand estimation by accurate demand region is a essential cue to reduce the gap. This empirical study compared the data of housing subscriber's real address with estimated demand area on household movement, which are applied by advanced studies. This empirical case data is related to 3 housing development districts in metropolitan area. As a result, This study found that the real demand area has a more widened coverage compared with those of household movement one. For to establish exact demand area, we found, more complementary considerations should be taken. Especially some factors such as distance between a project site and downtown of Seoul Metropolitan City, locational competitiveness on main demand and behind demand, and development scale are more considerable variables. In additionally, we found the demand areas are influenced by housing rental types, sizes and the real estate business trends. And also, this study found those factors should be considered with housing price and locational competitiveness.

An Empirical Study on the Differential Ratio between Construction Cost for Land Development and Incurred Cost: Case of Housing Business District for Land Development in LH (택지조성원가와 발생원가의 오차에 관한 실증연구 : 택지개발사업지구를 중심으로)

  • Kim, Tae-Gyun;Chang, In-Seok;Lee, Duck-Bok;Kim, Ok-Yon
    • Land and Housing Review
    • /
    • v.3 no.1
    • /
    • pp.59-68
    • /
    • 2012
  • The current land development cost price system is classified as the creating land by construction price and composition changes that occur sporadically in the process of completion at the source of the factors by incurred cost price. Housing for land cost price system is a lack of objectivity which scheme of the such a gap due to the land in accordance construction and incurred cost price system so far. Therefore, in order to increase the objectivity of costing the costing of predictable surprises should be reflected in the process. Under such a background, this study defined the effective differential ratio as the predictable, estimated them for various characteristics of each business district to reflect. For this, set the properties category of five types to attributes and making the complex category and Look-up table. Which result of model validation is showed a high reliability. Therefore, Continuous accumulation of material in the future, when them to reflect the construction cost, will contribute to the bridge the gap the construction cost between incurred them.

The Development of Economical Index for Site Recycling of Waste Concrete - A Case study at Hosing Development District - (폐콘크리트의 현장재활용을 위한 경제성 지표개밭 -택지개발사업지구를 중심으로-)

  • Jung, Jong-Suk;Lee, Jae-Sung;Jo, Whi-Chol;Jun, Myoung-Hoon;Lee, Do-Heun;Bang, Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.146-154
    • /
    • 2007
  • Recently, the construction wastes increase rapidly due to the revitalization of reconstruction and redevelopment, the development of new urbanization of large housing development, the expansion of social infrastructure, and so on. To solve rapid increase of construction waste, the government established "the rule on the promotion of recycling of construction waste" in December, 2003. According to the rule, construction wastes can be recycled by either processing on commission or discharger of construction waste. This study proved the validation of site recycling for construction waste as economic efficiency is analyzed through the case study of site recycling at large housing development district. Using the sensitivity analysis, factors affecting the cost of site recycling was analyzed and the break-even point for the cost of site recycling was estimated according to the factors.

The Process of Urban Development of Chilgok District in Daegu City (대구시 칠곡지구의 도시발달)

  • Jin, Won-Hyung
    • Journal of the Korean association of regional geographers
    • /
    • v.10 no.1
    • /
    • pp.83-95
    • /
    • 2004
  • Chilgok District is a historical area, which has had a certain amount of development. It has its own regional characteristics originating from its isolation from the existing built up area of Daegu City by the Kumho River This study explores the historical development processes and pending development issues of Chilgok District. In 1640 after the Japanese invasion of Korea in 1592, the district upgraded into Chilgok Dohobu due to its importance as a transportation hub of Youngnamdaero(the main road of Youngnam province in Chosun Dynasty). In its early stages, the government office was located in Kasan fortress, later the of office was moved to Eupnae-Dong. The Chilgok district has experienced a developmental lag resulting from the office's removal to Waegwan, located on the Kyungbu railroad since 1914. Later, due to the increasing influence of nearby Daegu City, urbanization continued gradually. Finally in 1981 Chilgok district was officially incorporated into Daegu Metropolitan City. In the later 1980s, the housing land development project was applied into the district centered on the alluvial plain of Palgeo-Cheon(stream) of the Northern part of Taejun-Bridge. Although the old built up zone was excluded from public sector development projects, private sector development has made the zone a modern town. Now, Chilgok district has transformed into a high-density residential new town in which high-rise apartment complexes mingle with numerous houses. As the district has developed, traffic jams have become a hot issue and it is going to get worse than now as the development continues. To solve this problem, Daegu city needs to swiftly construct the fourth belt way and the third subway line.

  • PDF

구조물 및 시설물이 인접한 구릉지 암반굴착 발파설계

  • 류창하;선우춘;신희순;정소걸;최병희
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 1994.03a
    • /
    • pp.81-88
    • /
    • 1994
  • 본 연구는 S시의 택지개발사업지역을 대상으로 암반굴착 작업을 위한 발파설계 기준의 마련과 효율적인 발파공법을 도출하기 위한 목적으로 수행되었다. 대상지역은 구획 정리사업이 본격화됨에 따라 풍화암을 포함한 리핑가능한 부분에 대한 절토작업이 거의 완료되고 리핑방법을 적용하기 어려운 암굴착을 위하여 화약발파를 이용한 암발파 작업이 요구되고 있으나 인접한 지역에 주요 구조물들과 micron/sec 단위의 허용수준을 요구하는 진동에 매우 민감한 시설물들이 있어 발파작업으로 인한 지반진동의 영향문제가 매우 심각한 지역이다. (중략)

  • PDF

Cause of Land-use on the Parking Difficulties in the Planned Residential Area -Case Study of GyoDong 2 Land development District in GangNeung City- (계획개발된 단독주택지구의 주차문제에 대한 토지이용 원인 -강릉 교동2택지개발사업지구를 대상으로-)

  • Lim, Dong-Il
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.6
    • /
    • pp.496-506
    • /
    • 2013
  • This paper aims to suggest the problems of land-use plan which causes the lack of parking space and to study the improvement of the problems. The land-use plan and the parking plan of the Gyo-dong 2 land development project are examined and the land use and the parking conditions are surveyed. The major cause of parking problem is not to have planned land use realistically. Because of the non-realistic land use plan, the parking demands are underestimated and it has resulted in decreasing the supply of parking space. In addition, the land use and parking managements have been negligent since the land development. In order to improve the parking problem, the change of land use should be considered in land use plan. And actual land use and parking plans should be made and land use management which considers the change of parking demands should be practiced.