• 제목/요약/키워드: 타임스케줄

Search Result 70, Processing Time 0.031 seconds

The Intermediate Channel Assignment based on Channel Status in High-rate WPAN (HR-WPAN에서 채널 상태에 따른 우회 채널 할당)

  • Lee Jung-Yun;Kim Sung-Su;Kim Jang-Hyung;Song Wang-Cheol
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.10 no.5
    • /
    • pp.832-842
    • /
    • 2006
  • Wireless Personal Area Networks(WAPANs) are designed for short-range ad hoc connectivity among portable devices. They have gained much attention in the industry recently. One of them, High-rate WPAN, is designed to support multimedia traffic that requires high data rates. But, High-rate WPAN standards don't specify the time slot assignment scheduling method of CAT(Channel Time Allocation). So, there has been many studies regarding time slot assignment scheduling of CAT. However, present studies involve demerits about not applying various types of errors in air interlace or having a starvation of a specific DEV(data device). In this paper, we propose algorithms about supplying the intermediate channel assignment in order to avoid these demerits. This method will help other methods that use time slot assignment scheduling of CTA.

AUTOSAR : Deadline-Compliant Scheduling Method Applicable to Timing Protection Mechanisms (AUTOSAR:타이밍 보호 메커니즘 적용 가능한 마감시간 준수 스케줄링 방법)

  • Kim, Joo-Man;Kim, Seon-Jong;Kim, Byoung-Chul;Kwon, Hyeog-Soong
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.19 no.1
    • /
    • pp.103-109
    • /
    • 2019
  • The automotive electronic system should provide a method that can be safely performed by loading a number of application programs having time constraints in several electronic control devices. In this paper, we propose a timing protection mechanism for AUTOSAR, which is a real - time operating system specification for automotive field, in order to observe the deadline of each task when scheduling real - time tasks. We propose a dynamic non-preemption algorithm to guarantee a flexible deadline for fixed priority or dynamic priority tasks, and a location where execution time can be monitored for errors, and suggest ways to implement the AUTOSAR time protection mechanism.

A SCHEDULING ANALYSIS OF FMS USING TPN UNFOLDING (타임패트리 네트 UNFOLDING을 이용한 FMS의 스케줄링 분석)

  • 이종근
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.205-205
    • /
    • 2000
  • In this paper, we are proposed an analysis method of the operation schedule in FMS using Time Petri Nets(TPN) unfolding. TPN's unfolding is one of the analysis methods after changed non-cyclic net from the concurrent net without to expand the state explosion. We are illustrated this proposed to analyze a schedule problem in Ratio-driven FMS modeling.

  • PDF

Time Slot Scheduling Algorithm for SS/TDMA Networks with Intersatellite Links (위성간 링크를 가진 SS/TDMA 망에 대한 타임슬롯 스케줄링 알고리즘)

  • Chang, Kun-Nyeong
    • IE interfaces
    • /
    • v.12 no.1
    • /
    • pp.19-25
    • /
    • 1999
  • The time slot scheduling problem for a satellite cluster with an arbitrary number of satellite is considered, which is one of the most interesting problems in the satellite communication scheduling area. This problem is known to be NP-complete, and several heuristic algorithms have been proposed. In this paper, a new efficient algorithm is suggested, which has lower computational complexity and provides much better solution than other existing algorithms.

  • PDF

시뮬레이션을 이용한 반도체 주문제품의 납기달성도 성능평가

  • 박종관;이영훈
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2000.11a
    • /
    • pp.56-60
    • /
    • 2000
  • 최근 반도체 산업은 주문형 제품의 생산이 증가하고 이에 대한 납기달성도에 대한 관리가 점차 중요해지고 있다. 본 논문은 납기달성도의 제고를 위한 생산 스케줄링 규칙을 제시하고 이에 대한 성능평가를 위해 반도체 Fabrication 라인을 모델로 한 시뮬레이션 모형을 개발하였다. 제시된 규칙이 라인의 밸런스는 물론 납기만족과 사이클 타임을 줄이는 데 좋은 성능을 나타내는 것을 보였다. 또한 제시된 규칙이 주문변화와 웨이퍼 투입규칙에 민감하지 않은 강건한 규칙임을 보이고 있다.

  • PDF

Improvement of Linux Schedulability Analysis for Simultaneous Support of Real-Time Task Groups and Deadline Task (실시간 태스크 그룹과 데드라인 태스크의 동시 지원을 위한 리눅스 스케줄링 가능성 분석 개선)

  • Yim, Yin-Goo;Jin, Hyun-Wook;Lee, Sang-Hun
    • KIISE Transactions on Computing Practices
    • /
    • v.23 no.7
    • /
    • pp.452-457
    • /
    • 2017
  • Linux is a general-purpose operating system that supports several schedulers, allowing different schedulers to coexist. In addition, Linux uses the Control Group (cgroup) to reserve CPU resources for task groups that follow the real-time (SCHED_FIFO, SCHED_RR) and non-real-time (SCHED_NORMAL) scheduler policies, except for the deadline scheduler (SCHED_DEADLINE). The cgroup performs the schedulability analysis to guarantee the reserved CPU resource as much as possible. However, current implementation of the schedulability analysis does not distinguish between deadline tasks and real-time tasks. Therefore, if these deadline tasks and real-time task groups coexist, there is a case where the resource reservation for the real-time task group is rejected. In this paper, we analyze the problems in the schedulability analysis for real-time task groups of Linux cgroups and propose patches to solve these problems.

A Hierarchical Round-Robin Algorithm for Rate-Dependent Low Latency Bounds in Fixed-Sized Packet Networks (고정크기 패킷 네트워크 환경에서 할당율에 비례한 저지연 한계를 제공하는 계층적 라운드-로빈 알고리즘)

  • Pyun Kihyun
    • Journal of KIISE:Information Networking
    • /
    • v.32 no.2
    • /
    • pp.254-260
    • /
    • 2005
  • In the guaranteed service, a real-time scheduling algorithm must achieve both high level of network utilization and scalable implementation. Here, network utilization indicates the number of admitted real-time sessions. Unfortunately, existing scheduling algorithms either are lack of scalable implementation or can achieve low network utilization. For example, scheduling algorithms based on time-stamps have the problem of O(log N) scheduling complexity where N is the number of sessions. On the contrary, round-robin algorithms require O(1) complexity. but can achieve just a low level of network utilization. In this paper, we propose a scheduling algorithm that can achieve high network utilization without losing scalability. The proposed algorithm is a Hierarchical Round-Robin (H-RR) algorithm that utilizes multiple rounds with different interval sizes. It provides latency bounds similar to those by Packet-by-Packet Generalized Processor Sharing (PGPS) algorithm using a sorted-Priority queue. However, H-RR requires a constant time for implementation.

Availability based Scheduling Scheme for Fair Data Collection with Mobile Sink in Wireless Sensor Networks (무선 센서 네트워크에서 모바일 싱크를 통한 데이터 수집의 균등성 보장을 위한 가용성 기반 스케줄링 기법)

  • Lee, Joa-Hyoung;Jo, Young-Tae;Jung, In-Bum
    • The KIPS Transactions:PartA
    • /
    • v.16A no.3
    • /
    • pp.169-180
    • /
    • 2009
  • With fixed sinks, the network stability could be improved while the network life time could be decreased by the rapid energy dissipation around the fixed sink because of the concentrated network traffic from sensor nodes to the fixed sink in wireless sensor network. To address this problem, mobile sinks, which decentralize the network traffic, has received a lot of attention from many researchers recently. Since a mobile sink has a limited period to communicate with each sensor nodes, it is necessary for a scheduling algorithm to provide the fairness of data collection from each sensor nodes. In the paper, we propose the new scheduling algorithm, ASF(Availability based Scheduling scheme for Fair data collection), for the fair data collection by a mobile in the sensor networks. The ASF takes account of the distance between each sensor nodes and the mobile sink as scheduling metric, as well as the amount of collected data from each sensor nodes. Experiment results shows that the ASF improves the fairness of data collection among the sensor nodes, comparing to existing algorithm.

Performance Comparison of Timestamp based Fair Packet Schedulers inServer Resource Utilization (서버자원 이용도 측면에서 타임스탬프 기반 공평 패킷 스케줄러의 성능 비교 분석)

  • Kim Tae-Joon;Ahn Hyo-Beom
    • The KIPS Transactions:PartC
    • /
    • v.13C no.2 s.105
    • /
    • pp.203-210
    • /
    • 2006
  • Fair packet scheduling algorithms supporting quality-of-services of real-time multimedia applications can be classified into the following two design schemes in terms of the reference time used in calculating the timestamp of arriving packet: Finish-time Design (FD) and Start-time Design (SD) schemes. Since the former can adjust the latency of a flow with raising the flow's reserved rate, it has been applied to a router for the guaranteed service of the IETF (Internet Engineering Task Force) IntServ model. However, the FD scheme may incur severe bandwidth loss for traffic flows requiring low-rate but strong delay bound such as internet phone. In order to verify the usefulness of the SD scheme based router for the IETF guaranteed service, this paper analyzes and compares two design schemes in terms of bandwidth and payload utilizations. It is analytically proved that the SD scheme is better bandwidth utilization than the FD one, and the simulation result shows that the SD scheme gives better payload utilization by up to 20%.

Development of an Effective Manufacturing Scheduling System for PCB Manufacturing Line Using Dual DBR Method (복수 DBR 기법을 이용한 PCB 생산라인의 효율적인 생산계획 시스템 개발)

  • Yoshida, Atsunori;Park, Jeong-Hyeon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2935-2944
    • /
    • 2009
  • This paper proposes Dual DBR(Drum-Buffer-Rope) system for a small-to-medium-sized PCB(Printed Circuit Board) manufacturing line. DBR method of TOC(Theory of Constraints) is an effective system for a small-to-medium-sized company to build production scheduling system. But to apply it to PCB line, it needs more technical consideration because of multiple constraints, looping process line and complex buffer management. This paper proposes an answer of these problems using Dual DBR to build production scheduling system more successfully. And it was confirmed that lead time was reduced more than 20% applying Dual DBR system to a domestic PCB manufacturing line actually.