The Development of a Web-based Decision Support System for Construction Claim Management (건설 클레임 관리를 위한 웹기반의 의사결정 지원 시스템 개발)

  • Sung, Nak Won;Kim, Young Suk;Lee, Mi Young;Lee, Jung Sun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.115-123
    • /
    • 2006
  • Recently, construction claims have been increased for protecting the rights of construction participants and effectively adjusting the changes under the contract. Thus, the importance of claim management has been emphasized in the construction industry. In domestic construction industry, some claim issues involved in construction activities are often being developed into disputes and even litigations because of the absence of methods or systems for the dispute resolution, and the lack of judicial precedents which can be provided as the references for resolving a particular dispute. In general, the judicial precedents related to the disputes and litigations occurred among construction participants would be extremely valuable in evaluating and analyzing current claims issues. However, such useful information has not been effectively accumulated and utilized in resolving the similar or sometimes identical types of disputes, thus requiring a large amount of additional costs, time and efforts. The primary objective of this study is to propose a web-based decision support system for construction claim management, which enables contractual participants to easily access and use the information of the judicial precedents related to the current construction claims. The decision support system is composed of 'prevention' and 'settlement' modules for avoiding and systematically resolving the construction claims.

Datamodel for Productivity Management of Construction Project (건설공사 생산성 관리를 위한 데이터모델)

  • Ryu Han-Guk;Yu Jung-Ho;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.442-445
    • /
    • 2002
  • Construction delay claim occurs more often than any other claim. Delay claim impacts adversely the company's existence as well as the project's monetary problem. Because the calculation of the delay is not quantitative, owing not to have enough evidence, it is hard to solve evenly the delay claim. So, it is need to cumulate structurely the construction data or evidence during the construction. This study considers the established study about construction delay claim database and the problems and then presents the relation method between phase schedule and database. Finally, this study established the productivity claim database modeling for construction project through conceptual database modeling and logical database modeling based on information needed to make construction productivity database. So. the purpose of the study is to establish the datamodel for productivity management of construction project for calculating the delay days considering the lost productivity.

  • PDF

A Study on the Suggestion of Construction Contract Practice in the Public Project through the analysis of Construction Claims (건설클레임 사례분석을 통한 입찰 및 계약제도 개선에 대한 연구)

  • Cho Young-Jun;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.78-87
    • /
    • 2001
  • Recently many construction claims related to the ommission and discrepancy of design document are alleged since 1998 and various dispute resolution methods are appeared. But many contractors alleged claims are not satisfied with the result because of not sufficiently reflecting construction practice. The purpose of this study is to analyze the liability of contract privity from the view point of the contract related law and to analyze the claims and claim factor, and to suggest construction contract practice in the public project. The construction claims related to the design document may be minimized, through (1) the accumulation and retrieval of standard forms by owners' type, (2) the usage of specified specification considering project characteristics, (3) the materialization of detail subsurface design and various contract method in heavy engineering construction.

  • PDF

A Reduction of Claims for Efficient Turn-key Project (효율적인 턴키사업 추진을 위한 클레임 저감방안)

  • Oh, Ye-Keun;Sohn, Jeong-Rak;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.122-130
    • /
    • 2012
  • Currently, TK(Turn-key) projects have been implemented, the projects on TK basis still have shown several problems rather than its own merits as a bidding method. Increasing the number of claims being occurred during construction process of the projects is reality because of unclear notice of tender documents and conditions of the contract, design review system, and decision process of the qualified bidder. To establish desirable TK projects in domestic market, not only should resonable alternatives for carrying out design review system and selecting the bid winner be set up, but also proper standards for reforming irrational system of contract, bid, and notice of tender related to TK projects. This study is intended to reduce the number of claims and implement efficient projects of apartment construction on TK basis by identifying potential problems through analysis of claim examples of TK projects which have difficulties of revising contract agreement such as drawings and suggesting improvement methods for contract conditions and notice of tender docuements.

Risk Mitigation Methodology of the General Conditions of Contract (공사계약일반조건의 위험요인 감소방안)

  • Yoon, Chul-Sung;Kwon, Soon-O;Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.177-185
    • /
    • 2005
  • Construction uncertainties are frequently exposed to the claims. In most cases, an interpretation of the claims is based on the construction contract. Therefore, the key points of contract negotiation are how to fairly distribute the contract risks to the client and contractor. For these, a FIDIC that is considered as an international standard contract form would be a good reference to decide reasonable contract risk distribution. In order to find out any unreasonable and unfair contract clauses at the general conditions of contract applying generally to public construction project in Korea, this study surveys, analyses and evaluates the general conditions of contract based on a FIDIC, and then proposes a risk mitigation methodology to response those clauses' risk factors reasonably.

A Study on the Analysis of Change Order - Claim in Design-Build (설계시공 일괄입찰공사에서 설계변경 클레임요인의 분석에 관한 연구)

  • Lee, Sang-Beom;Hwang, Jae-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.301-304
    • /
    • 2006
  • The insistence of rights and interests in contract is being generalized by opening in construction market which is following F.T.A, internationally. Conditions of contract in construction have different specialities compared with other industries. Different conditions of contract should be established because of a specific character that is different from each construction, such as work, environment, circumference conditions. Although the order of Turn-key is being expanded by increasing construction scale and demanding hybrid function, the suitable regulations of contract are not settled. As a result, various factors of claim is occurring in Change Order-Claim, because they just obey a part of guide-line. This study suggests useful solutions in detail concerned with the main factor of Change Order-Claim by each D/B phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

Benchmarking Research Based on Contract Documents for Successful ADR Implementation to Domestic Construction Industry (ADR 활성화를 위한 건설 계약서의 해외 사례 벤치마킹 연구)

  • Choi Jeong-Won;Kim Sang-Bum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.629-633
    • /
    • 2004
  • The number of claims and disputes among project participants has been steadily increasing last a few years and it creates numerous conflicts and problems in the domestic construction industry. One of the root causes of claims and disputes can be explained by the fact that project objectives of participants are offer different and not aligned. This research is considered as a pre-study of developing a strategy to mitigate conflicts such as claims and disputes in the domestic construction industry by utilizing Alternative Dispute Resolution (ADR) techniques. This research focused on improving standard contrast documents to establish a systematic dispute resolution process which emphasize the ADR method. To do so, several well-recognized contract documents developed by FIDIC, AIA, ECC were throughly investigated and analyzed using a benchmarking process. Result of the research propose needs of improving the domestic construction document's some clauses and the details will be further Investigated through surveys and expert's opinions.

  • PDF

Empirical Study on the Validity of Construction Bond-related Litigations (건설보증(建設保證) 분쟁해결(紛爭解決)의 소송(訴訟) 유효성(有效性)에 관(關)한 실증적(實證的) 연구(硏究))

  • Kim, Jong-Seo;Choi, Jong-Soo;Lee, Jae-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.99-111
    • /
    • 2006
  • Of the numerious dispute resolution methods, Alternative Dispute Resolution(ADR) is the most highly recommended approach for the guarantee bond-related dispute. In reality, however, claims were not resolved satisfactorily through ADR because of the lack of reference materials for negotiation, thus those were frequently had to be resolved through litigation. The above fact implies that, it is required to seek an efficient way to resolve the bond-related claims prior to they progress to litigation. This research paper intensively investigated judicial precedents of 232 cases with regard to construction bond-related disputes that observed during the analysis period(2000-2004). According to the summary statistics, it turned out that litigation were time consuming and potential economic loss was tremendous; on average, it takes 1067 days(the longest case was 1965 days) for dispute resolution. It suggests that litigations should be discouraged considering the magnitude of potential loss of stake holders. Research results revealed that there are some significant differences between categories in some variables affecting to the rate of winning; i) the number of lawsuit deputies of a plaintiff (in the 1st trial), ii) dispute locations (in the 1st and 3rd trials), iii) contract price (in the 1st trial), iv) contractors' operating capability (in the 1st and 2nd trials). For the rest of variables, significance level between categories was too low for preparing efficient improvement plan. Despite the important implications drawn from the analysis, this research has limitation due to the several reasons such as data structure, the depth of Information, etc. Therefore, more systematic research should be followed in the future.