• Title/Summary/Keyword: 콘크리트 사장교

Search Result 60, Processing Time 0.029 seconds

Analysis of Construction Cost of the Second-Dolsan Bridge and the Sepung Bridge (제2돌산대교와 세풍대교의 공사비 분석)

  • Seo, Young-Jae;Lee, Kyoung-Jae;Kim, Jae-Hong
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.21-22
    • /
    • 2010
  • Recently, many concrete cable-stayed bridges are under construction for economic benefits. This study deals with analyzing construction cost of the Second-Dolsan Bridge and the Sepung Bridge as examples of concrete cable-stayed bridges.

  • PDF

Nonlinear Analysis of Incheon Bridge Considering Time-Dependent Behavior of Concrete Pylon (콘크리트 주탑의 시간 의존적 거동을 고려한 인천대교의 비선형 해석)

  • Ha, Su-Bok;Kim, Jin-Il;Hwang, Chang-Hee;Shin, Hyun-Mock;Kim, Moon-Young
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.25 no.2
    • /
    • pp.155-162
    • /
    • 2012
  • Recently, building of long span bridge is increasing and cable stayed bridges have large portion in civil projects. As the spans of bridges become longer, steel cable-stayed bridges have been constructed mainly for slim structure. But in many case, pylons are constructed by concrete for the stability of structures and the economy. Concrete is greatly influenced by the long-term behavior like creep and drying shrinkage, so analysis of stress redistribution and structural change in construction is required. In this study, as a cable stayed bridge with concrete pylon, Incheon Bridge is analyzed by nonlinear FEM analysis program RCAHEST. Through this analysis, time dependent effect of concrete pylon to whole cable stayed bridge system is studied.

Regularization Length in Single Plane Cable-stayed Concrete Bridge (1면 케이블 콘크리트 사장교의 응력 불균일 영역길이)

  • Kang, Ho-Jun;Jang, Jae-Youp;Kim, Gwang-Soo;Lee, Hwan-Woo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.10-13
    • /
    • 2010
  • 세그먼트 자중 등에 의한 휨모멘트와 케이블 수직압축력에 의한 합성응력이 발생되고 바닥판 경간비가 변하는 사장교의 시공단계에서는 전단지연의 영향범위가 다를 수 있다. 이 연구에서는 1면 케이블 콘크리트 박스 사장교를 대상으로 시공단계시 보강형에 고려되어야 할 합성응력에 의한 유효플랜지폭을 분석하였다. 그 결과 바닥판 경간비가 0.38 이하의 범위에서 보강형의 전폭을 유효플랜지폭으로 적용할 수 있는 것으로 해석되었다. 따라서 시공단계시 변화되는 바닥판 경간비의 크기에 관계없이 전폭을 유효플랜지폭으로 반영하는 실무관행은 안전측 설계가 되지 못할 수 가 있다. 바닥판 경간비가 작아짐에 따라서는 전폭과 캔틸레버 구조계로 유효플랜지폭을 결정하는 것이 타당하다. 이 연구에서는 수직력에 대한 도로교설계기준의 유효플랜지폭 규정에 대한 평가도 수행하였다.

  • PDF

Estimation of error factors in concrete cable-stayed bridge considering creep (크리프를 고려한 콘크리트 사장교의 오차 요인 추정)

  • Park, Jong-Bum;Cho, Jae-Yeol;Park, Jung-Il;Chang, Sung-Pil
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.387-388
    • /
    • 2009
  • In concrete cable-stayed bridge, the time-dependent effects of concrete should be taken into account for the optimum cable force adjustment. The method for estimating the creep coefficient with using the deflections and the cable forces in concrete cable-stayed bridge is presented and the effects of the creep coefficient error are analyzed.

  • PDF

Buffeting Responses of Concrete Cable-stayed Bridge Considering Turbulent Characteristics of Bridge Site (현장 풍속 특성을 반영한 콘크리트 사장교의 버페팅 응답)

  • Kim, Sung-Ho;Yhim, Sung Soon;Kwon, Soon-Duck
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.2A
    • /
    • pp.97-104
    • /
    • 2011
  • This study presents the aerodynamic admittance function of bridge girder under turbulent flow generated from wind velocity spectrum measured at bridge site. Three dimensional buffeting analysis of concrete cable-stayed bridge were performed considering aerodynamic admittance functions obtained from four different methods. It is revealed from the analysis that vertical buffeting responses considering proper aerodynamic admittance functions were just half of that neglecting aerodynamic admittance function. Grid turbulence was found to relatively lower the aerodynamic admittance function at low frequency range, and to underestimate the buffeting wind forces. It is recommended to use the aerodynamic admittance function evaluated from flutter derivatives or measured at active turbulence in order to properly predict the buffeting responses of bridges.

Design of Vam Cong Cable Stayed Bridge in Vietnam (베트남 밤콩 사장교의 설계)

  • Lee, Yong-Jin;Kang, Jeong-Woon;Bae, Sang-Woon;Yun, Yeon-Suk;Lho, Byeong-Cheol
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.1 no.2
    • /
    • pp.120-127
    • /
    • 2013
  • Vam Cong Cable Stayed Bridge which has 450m main span length is one of the Central Mekong Delta Region Connectivity Project and is located in Cuu Long Delta Region. It has steel-concrete composite girder with 4 lane and the type of cable is multi strand cable. The improved H-shape pylon and cast-in-place bored piles were applied. High strength concrete is applied for pylon, precast concrete slab and Cast-in-Situ concrete pile to ensure the structural safety. The present paper describe the design specifications and main features of Vam Cong Cable Stayed Bridge design.