• Title/Summary/Keyword: 최종침하량

Search Result 73, Processing Time 0.02 seconds

Estimation of Load-Settlement Curves of Embedded Piles Combining Results of End of Initial Driving and Restrike Dynamic Pile Tests (초기항타 및 재항타 동재하시험 결과를 조합한 매입말뚝의 하중-침하량 곡선 산정)

  • Seo, Mi Jeong;Park, Jong-Bae;Park, Min-Chul;Lee, Jong-Sub
    • Journal of the Korean Geotechnical Society
    • /
    • v.36 no.7
    • /
    • pp.15-28
    • /
    • 2020
  • As the skin friction of an embedded pile is produced by the cement paste injected into the borehole, the skin friction cannot be evaluated by the end of initial driving test, which is conducted before the cement paste is cured. In addition, the total resistance of an embedded pile may not be properly evaluated during the restrike test if the base resistance is not fully mobilized because of the insufficient driven energy. The objective of this study is to suggest a new load-settlement curve of embedded piles by combining the results of the end of initial driving and restrike tests. Test piles are installed at fields by using the embedded pile method, and the results of the dynamic pile tests are analyzed using CAse Pile Wave Analysis Program (CAPWAP) after the end of initial driving and restrike tests are conducted. A new load transfer curve, which combines the behaviors of the pile base at the end of initial driving and of the pile shaft at the restrike, is suggested, and a new load-settlement curve is obtained. Subsequently, the resistances of the test piles are evaluated using the combined load-settlement curve, and compared with the results from the end of initial driving and restrike tests. The results showed that the resistances, which are evaluated using the combined load-settlement curve, may overcome the underestimation of the resistance because of the insufficient driven energy. In addition, the resistance resulted from the combined load-settlement curve may be more similar to that from the static load test because the suggested load transfer curve is closer to the behavior of the embedded pile compared to the results of end of initial driving and restrike tests. Therefore, this study demonstrates that the combined load-settlement curve may be effectively used for the evaluation of the bearing capacity of embedded piles.

An Experimental Study for the Empirical Equation to Quantify the Subsidence of Riprap Scour Protection at Downstream of Vertical Drop Structures (연직낙차공 하류부 사석보호공 침하량 산정식에 관한 실험 연구)

  • Kim, Chang-Sung;Kang, Joon-Gu;Yeo, Hong-Koo;Yeo, Woon-Kwang
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.5
    • /
    • pp.433-443
    • /
    • 2010
  • Drop structures that span the entire width of channels are installed to alleviate channel grades and have been constructed widely in Korean rivers. Aprons are normally installed and integrated with drop structures and bed protections are added on the downstream part of aprons to protect both drop structures and aprons. Scour occurring on aprons is reported to provide various habitats such as ripples and pools in natural rivers. This study focuses on the scour characteristics on an apron integrated with a drop structure and the subsidence of a riprap protection. The scour depth on the downstream part of the drop structure is found to increase with the increase of unit discharge; however, to decrease as the tail water depth gets deeper. Based on the experimental measurements, the subsidence of the riprap scour protection is calculated with respect to the thickness of riprap. Finally, the dimensionless empirical equation to quantify the subsidence of the riprap scour protection without filters at downstream of the vertical drop is suggested.

Prediction of Final Settlement on Soft Ground (연약지반에서 최종침하량의 예측방법)

  • 임성훈;강예묵;이달원;김지훈
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1998.10a
    • /
    • pp.449-454
    • /
    • 1998
  • This study was performed of the research for accurate prediction of consolidation settlement at initial consolidation time. In order to analysis the program is developed which is able to analysis behavior of settlement caused by gradual load increment, and simulated consolidation using whole measured settlement data and that from beginning of embankment to end of it. The former result agrees with measured data and the latter it overestimated 13% larger than measured data. It was found the time which takes to be eliminated effect of gradual step load. This method is compared with the results from Asaoka, Hyperbolic and Tan's hyperbolic method respectively Asaoka and Tan's hyperbolic methods we in good agreement with this method. But classical hyperbolic method overestimated about 32%.

  • PDF

Dewaterability Improvement and Volume Reduction of Bio-Solid using Ultrasonic Treatment (Bio-Solid의 탈수성 개선 및 감량화를 위한 초음파 적용)

  • Park, Cheol;Ha, Jun Soo;Kim, Young Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.6
    • /
    • pp.4019-4023
    • /
    • 2014
  • This study examined the effectiveness of ultrasound on enhancing the dewaterability and volume reduction of bio solids from a waste treatment plant. The test specimen was obtained from a storage tank immediately before the dewatering process at a local treatment plant. The test conditions included the energy levels of ultrasonic waves and treatment time. The tests were undertaken using three types of different treatment processors (7 liter, 1 ton, 7 ton container). The capillary suction time (CST) and the viscosity of sludge, which is one of the influencing factors for dewaterbility, were obtained under various test conditions. The results showed that ultrasound increases the CST of the raw specimens, whereas a significant reduction (20 % of the maximum value) of CST occurred in the sample with ultrasound and flocculent. The decrease in viscosity reached 40 % of the maximum value. A centrifugal test was performed to examine the characteristics of the sludge settlement. The settling rate and time required to reach the final values were both enhanced by the ultrasonic energy. An ultrasonic treatment is potentially useful tool for reducing the amount of released sludge. To examine the possible use of field application, the real scale sonic processor was designed and operated. The results were similar (50 % of the maximum value) to those of laboratory experiments.

A Study on the Characteristics of Stress History of Kwang-Yang Port Clayey Soil Based on the Long-term Consolidation Test (장기압밀시험에 의한 광양항 점성토의 응력이력 특성 연구)

  • Kim, Jin-Young;Ryu, Seung-Seok;Baek, Won-Jin;Shim, Jae-Rok;Oh, Jong-Shin;Kim, Seong-Gon
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.6
    • /
    • pp.31-38
    • /
    • 2012
  • In this present study, the long-term consolidation tests were performed using the remolded Kwang-Yang port clayey soil to clarify the effect of stress history and over-consolidation ratio (OCR) on the long-term consolidation characteristics of the soft clayey soil. For the over-consolidated state clayey soils, in case OCR exceeds 1.5, there are no great differences of secondary consolidation settlement and final settlement even if OCR increases from 2.0 to 3.0. Therefore, it has been understood that the value of OCR applied on the field site to reduce the secondary consolidation settlement and the final settlement is about 1.5. In addition, in order to investigate the relationship between the pre-loading period and the characteristics of long-term consolidation behavior obtained from the test results using the remolded Kwang-Yang port clayey soils, the influence on long-term consolidation behavior was not large though the pre-load was unloaded with the consolidation degree 70~80% exceeded.

Effect of Pretreatment of Mine Tailings on the Performance of Controlled Low Strength Materials (저강도 고유동 충전재의 성능에 미치는 광미 전처리의 영향)

  • Tafesse, Million;Kim, Hyeong-Ki
    • Resources Recycling
    • /
    • v.26 no.3
    • /
    • pp.32-38
    • /
    • 2017
  • For the massive recycling of mine tailings, which are an inorganic by-product of mining process, in the field of civil engineering, pretreatments to extract heavy metals are required. This study focuses on the use of pre-treated tailings as substitute fillers for controlled low-strength material (CLSM). As a comparative study, untreated tailing, microwave-treated tailing and magnetic separated with microwaved tailing were used in this study. Cement contents amounting to 10%, 20% and 30% by the weight of the tailings were designed. Both compressive strength and flowability for all types of mixture were satisfied with the requirements of the American Concrete Institute (ACI) Committee 229, i.e., 0.3-8.3 MPa of compressive strength and longer than 200 mm flowability. Furthermore, all mixtures showed settlements less than 1% by volume of the mix.

Consolidation Behaviour of Dredged Clay Ground Improved by Horizontal Drain Method (수평배수공법에 의해 개량된 준설점토지반의 압밀거동에 관한 연구)

  • 김형주;원명수
    • Geotechnical Engineering
    • /
    • v.13 no.1
    • /
    • pp.137-146
    • /
    • 1997
  • In this study, a large consolidation test was carried out to estimate the consolidation behaviour of dredged clay ground improved by horizontal drain using plastic board drain with a vacuum pressure. The test results were analyzed by a numerical simulation using potential consolidation theory applied to a hollow cylinder. The rapid decreases in pore pressure and the drain speed in the plastic board indicate that the consolidation occurred quickly after the vacuum state was applied to the test soil. According to the numerical analysis obtained by applying the linear potential consolidation theory to a clay hollow cylinder with external radial drainage, the pore pressure is affected by the strain and the permeability of the soil rather than by the diffusion types. Therefore, measured surface settlement agreed with the numerical solution at the point where consolidation pressure increasing rate u: -0.5. Also the behaviour of the clay layer settlement in the place where the drain was installed was similar to that shown in Barron's consolidation theory. Finally, the design and construction procedure including the selection of the appropriate arrangement of horizontal drains were discussed based on the results of the laboratory tutsts. It is also shown that the potential consolidation theory make it possible to predict consolidation behaviour in the field using horizontal drains exactly.

  • PDF

Consolidation Behavior of Agricultural Reservoir under Embankment on Soft Ground (연약지반상(軟弱地盤上)에 축조(築造)된 농업용저수지(農業用貯水池) 제체의 압밀거동(壓密擧動))

  • Oh, Beom-Hwan;Lee, Dal-Won;Eam, Sung-Hoon
    • Korean Journal of Agricultural Science
    • /
    • v.29 no.2
    • /
    • pp.53-66
    • /
    • 2002
  • This study was performed to evaluation the consolidation behavior of agricultural reservoir in the very soft ground. The final settlement prediction methods by Terzaghi, Hyperbolic and Asaoka methods were used to compare with the degree of consolidation estimated by exess pore water pressure. The dissipated excess pore water pressure during embankment construction and peak excess pore water pressure on the completed embankment were suggested for the estimation of the degree of consolidation. It was concluded that the degree of consolidation estimated from dissipated excess pore water pressure was more reliable than that from the peak excess pore water pressure. The stability methods for agricultural reservoir was used to compare and analyze with various condition by limit equilibrium method.

  • PDF

Analysis of Resistance Performance of a Ship having a Large Attitude based on CFD (CFD에 의한 자세변화가 큰 선박의 저항성능 해석)

  • Kim, Hyun-Soo;Park, Dong-Woo;Yang, Young-Jun
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.25 no.7
    • /
    • pp.961-967
    • /
    • 2019
  • This research presents an efficient method based on computational fluid dynamics (CFD) for estimating the resistance performance of a ship with a large settlement amount and a dynamic trim. The settlement of the inviscid flow analysis and the results of dynamic trim were used to set a large attitude for the ship prior to performing a viscous flow analysis; a viscous flow analysis was subsequently performed by Dynamic Fluid Body Interaction (DFBI). This method is termed as method I, in which a simple grating system can be used without employing the overset mesh technique by setting many attitudes before interpretation. Thus, method I is advantageous in reducing calculation time and improving calculation accuracy. The viscous flow analysis was performed using a commercial CFD code STAR-CCM+. Compared with the final convergence result, the first viscous flow analysis result of method I exhibited a variation of less than 1 % of resistance. The result was obtained by changing the gratings each time an attitude is changed at each calculation stage, based on the DFBI method provided to STAR-CCM+ using a simple grating system, which is not a superposed grating. This method is termed as method II. Compared with method II of resistance, method I exhibited a dif erence of 0.03-0.6 % for linear velocity. The results of method I were confirmed to be qualitatively and quantitatively appropriate through comparison with several trillion simulations.

A study on hydraulic back analysis for an urban tunnel site and stability analysis based on hydro-mechanical coupling analysis (도심지 터널 용출수 발생구간에서의 수리 역해석 및 수리-역학 연계해석을 통한 안정성 해석 연구)

  • Park, Inn-Joon;Song, Myung-Gyu;Shin, Uyu-Soung;Park, Yong-Su
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.4
    • /
    • pp.397-404
    • /
    • 2008
  • Excessive amount of groundwater flowed into tunnel, while constructing Incheon international airport railway. Tunnel passes under subway line no. 2 with only 1.76 m below. To protect the existing structure, TRcM excavation method was applied. As station and construction shaft are already constructed, which are located back and forth of TRcM section, 86.4 ton per day of groundwater inflow is against expectation. To identify mechanism of excessive water inflow, hydraulic back analyses were performed. Then, hydro-mechanical coupled analysis were also performed with the hydrogeologic parameters identified, whose results are investigated for checking the stability of adjacent structures to the tunnel under construction. And a number of mechanical analyses were also performed to check the hydro-mechanical coupling effect. The result from the mechanical analysis shows that subsidence and tunnel ceiling displacement will be 0.85 mm and 1.32 mm. The result of hydro-mechanical couple analysis shows that subsidence and maximum tunnel ceiling displacement will be 1.2 mm and 1.72 mm. Additional displacements caused by groundwater draw down were identified, however, displacement is minute.

  • PDF