• Title/Summary/Keyword: 최적비용

Search Result 2,051, Processing Time 0.033 seconds

Cost-based Optimization of Extended Boolean Queries (확장 불리언 질의에 대한 비용 기반 최적화)

  • 박병권
    • Journal of the Korean Society for information Management
    • /
    • v.18 no.3
    • /
    • pp.29-40
    • /
    • 2001
  • In this paper, we suggest a query optimization algorithm to select the optimal processing method of an extended boolean query on inverted files. There can be a lot of methods for processing an extended boolean query according to the processing sequence oh the keywords con tamed in the query, In this sense, the problem of optimizing an extended boolean query it essentially that of optimizing the keyword sequence in the query. In this paper, we show that the problem is basically analogous to the problem of finding the optimal join order in database query optimization, and apply the ideas in the area to the problem solving. We establish the cost model for processing an extended boolean query and develop an algorithm to filled the optimal keyword-processing sequence based on the concept of keyword rank using the keyword selectivity and the access costs of inverted file. We prove that the method selected by the optimization algorithm is really optimum, and show, through experiments, that the optimal method is superior to the others in performance We believe that the suggested optimization algorithm will contribute to the significant enhancement of the information retrieval performance.

  • PDF

Low Impact Development Scenario Designing for Large-scale Urban Development using SWMM-ING Software (SWMM-ING 소프트웨어를 이용한 대규모 도시개발부지에 대한 저영향개발 시나리오 설계)

  • Woo, Won Hee;Lee, Hanyong;Choi, Hyun Seok;Park, Youn Shik
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.304-304
    • /
    • 2021
  • 도시화가 진행됨에 따라 불투수지역이 늘어나는 등 개발전과 다른 지표 및 지표하 유출이 나타나며, 이러한 변화는 생태적, 수문학적으로 대규모 변화가 나타나는 것을 의미한다. 이에 따라 물관리, 물순환 등 물 지속 가능성은 대중의 관심을 받아 법, 제도가 변화하며 도시화에 대한 세심한 접근과 관리에 대한 계획이 대두되고 있는 실정이다. 저영향개발(Low Impact Development)은 이러한 도시화로 인해 발생될 수 있는 문제를 해결하기 위한 방안의 하나로 제안되고 있으며 첨두 및 유출총량을 완화하여 개발 이전 상태의 수문학적 기능을 유지하거나 물리학 및 생물학적 기작을 통해 오염물질의 저감효과도 나타나 대규모 도시개발 및 유역관리 사업에서 저영향개발기법의 적용이 점차 늘어나고 있는 추세이다. 그러나 저영향개발기법 설치에 관한 구체적인 매뉴얼 또는 가이드라인이 부족한 실정이기 때문에 저영향개발기법이 계획단계에서 양적으로 무분별하게 적용되어 비용적 측면에서 시공자에게 부담을 가중시키는 등의 문제가 발생한다. 또한 시설의 위치에 따라 강우유출수 및 비점오염원 저감에 대한 효과가 상이하기 때문에 시설의 적정 위치선정 및 시설용량, 경제성을 고려한 시설효과 검토 등 저영향개발기법 적용시 사업부지 특성에 따른 최적화를 고려하여 계획 및 설계에 적용할 필요성이 있다. 이에 비용적 측면을 고려한 최적설계가 가능한 SWMM-ING(Storm Water Management Model - Low impact development desigN proGram)을 개발된 바 있다. SWMM-ING은 비전문가도 사용이 가능하도록 저영향개발기법 최적화과정이 간단하고 직관적이며 비용을 고려한 최적설계가 가능하도록 개발된 소프트웨어로 기법 적용시 개략적인 비용추정 및 배치선정 등 저영향개발기법의 설계최적화가 가능하다. 또한 각각의 저영향개발기법에 대한 초기설치비용, 유지관리비용, 이자율, 기대수명, 대상지역 내 공간적 위치를 반영하여 강우유출수 및 비점오염저감효과를 시나리오별로 제시가 가능한 장점이 있다. 본 연구에서는 SWMM-ING를 이용하여 대규모 도시개발부지의 저영향개발기법 적용에 따른 유량 및 수질저감효과를 평가하고 유지관리비를 포함한 비용을 추정하여 최적설계 검토를 수행하였다.

  • PDF

임의의 충격이 있는 시스템의 최적 점검주기

  • 김성순;박정훈;최승경;이의용
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2004.07a
    • /
    • pp.211-216
    • /
    • 2004
  • 본 논문에서는 임의의 충격이 있는 시스템 모형에서, 두 가지 시스템 관리정책인 임의점검정책과 주기점검 정책을 채택 한다. 시스템의 상태와 수리에 관련된 비용들을 고려한 후, 각 관리정책 하에서 장시간에 걸친 단위시간당 평균비용을 최소화하는 최적 점검주기를 구하고, 두 관리정책의 비교연구를 수행한다.

  • PDF

그린ICT 융합 S/W 사례: 에너지통합최적 운영시스템 개발

  • Yu, Seong-Min
    • Information and Communications Magazine
    • /
    • v.31 no.7
    • /
    • pp.8-14
    • /
    • 2014
  • 에너지에 대한 수요가 급증하게 되면서 에너지부족문제에 대한 크게 대두되기 시작하였다. 특히 에너지 사용급증은 에너지 부족문제 초래뿐만 아니라 화석사용연료 사용 급증으로 인한 이산화탄소 배출증가 및 에너지 비용증가가 국가적 이슈로 자리잡기 시작하였다. 따라서 이러한 문제를 해결하고자 여러 기관들에서는 에너지관리시스템 개발에 착수하기 시작하였다. 그러나 이러한 시스템은 별도의 관리자 및 운영비용이 들기 때문에 에너지 절감이득에 비하여 비용에 대한 혜택이 없는 중소형 건물 적용에 어려움이 있었다. 따라서 이러한 한계점을 극복하고자 KT 융합기술원에서는 에너지통합운영시스템이 개발하였으며, 중소형 건물에도 적용이 가능하다는 장점이 있다. 본 고에서는 다수의 건물 관리가 가능한 건물통합에너지관리 최적운영시스템 개발에 관하여 다루어 보고자 한다.

화학공정의 실시간 최적화

  • 김정환;한종훈
    • ICROS
    • /
    • v.10 no.3
    • /
    • pp.17-20
    • /
    • 2004
  • 정유 및 석유화학, 철강산업계는 제품수요의 변화, 에너지 및 원료단가 상승, 운전비용 상승 및 환경 규제 강화 등 다양한 주위 상황 변화로 인하여 기존 프로세스의 최적운전을 통한 비용절감이나 친환경적 운전이 매우 중요한 이슈가 되고 있다. 공정 개선을 통해서 이러한 문제를 해결하기 위한 방안으로는 새로운 설비를 도입하거나 기존 설비를 고치거나 기존의 공정 설비 및 장치를 최대한 이용할 수 있도록 조업 조건을 설정해 주는 방법 등이 있다. 그 중 비용 측면에서 유리하며 짧은 시간 내에 공정의 생산성을 향상시킬 수 있는 방법은 환경변화에 맞춰 공정이 유연하게 대처하도록 최적의 조업을 유지하는 것이다.(중략)

The Optimal Algorithm for Assignment Problem (할당 문제의 최적 알고리즘)

  • Lee, Sang-Un
    • Journal of the Korea Society of Computer and Information
    • /
    • v.17 no.9
    • /
    • pp.139-147
    • /
    • 2012
  • This paper suggests simple search algorithm for optimal solution in assignment problem. Generally, the optimal solution of assignment problem can be obtained by Hungarian algorithm. The proposed algorithm reduces the 4 steps of Hungarian algorithm to 1 step, and only selects the minimum cost of row and column then gets the optimal solution simply. For the 27 balanced and 7 unbalanced assignment problems, this algorithm finds the optimal solution but the genetic algorithm fails to find this values. This algorithm improves the time complexity O($n^3$) of Hungarian algorithm to O(n). Therefore, the proposed algorithm can be general algorithm for assignment problem replace Hungarian algorithm.

Optimal Network Design for the Estimation of Areal Rainfall (면적강우량 산정을 위한 관측망 최적설계 연구)

  • Lee, Jae-Hyeong;Yu, Yang-Gyu
    • Journal of Korea Water Resources Association
    • /
    • v.35 no.2
    • /
    • pp.187-194
    • /
    • 2002
  • To improve the accuracy of the areal rainfall estimates over a river basin, the optimal design method of rainfall network was studied using the stochastic characteristics of measured rainfall data. The objective function was constructed with the estimation error of areal rainfall and observation cost of point rainfall and the observation sites with minimum objective function value were selected as the optimal network. As a stochastic variance estimator, kriging model was selected to minimize the error terms. The annual operation cost including the installation cost was considered as the cost terms and an accuracy equivalent parameter was used to combine the error and cost terms. The optimal design method of rainfall network was studied in the Yongdam dam basin whose raingauge numbers need to be enlarged for the optimal rainfall networks of the basin.

Minimization of Pump Running Cost in the Large-scale Water Supply System (광역상수도 계통의 Pump 운전비용 최소화)

  • Lee, Gwang-Man;Kang, Shin-Wook;Kim, Soo-Myung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.276-281
    • /
    • 2009
  • 장거리 용수공급 시스템에서 전력비용은 전체 운영비용의 큰 부분을 차지한다. 본 연구는 시간단위의 펌프와 배수지 시스템의 최적 운영계획을 수립하기 위해 동적계획기법에 기초한 방법론을 제시하고 있다. 해석방법은 가용 가능한 펌프의 효율적 운전과 전력요금체계, 시간대별 용수수요추이 그리고 배수지 특성과 송수관로의 제약조건 등을 고려하였다. 이를 위해 적용 가능한 시스템 운영목적과 제약조건이 제시되었고 개발된 방법은 수도권 광역상수도 양주계통의 2개 가압장과 5개 배수지를 대상으로 적용되었으며, 적용결과는 상당한 수준의 펌프운전비용을 절감할 수 있는 것으로 나타났다. 이와 같은 방법은 생애주기 비용 최소화 측면에서 실제 용수공급 시설 운영과 대규모 용수공급 체계의 설계 등에 적용이 가능하다.

  • PDF

An Optimal Design of Paddy Irrigation Water Distribution System (논관개용 관수로시스템의 최적설계)

  • 안태진;박정응
    • Water for future
    • /
    • v.27 no.4
    • /
    • pp.161-171
    • /
    • 1994
  • The water distribution system problem consists of finding a minimum cost system design subject to hydraulic and operation constraints. The design of new branching network in a paddy irrigation system is presented here. The program based on the linear programming formulation is aimed at finding the optimal economical combination of two main factors: the capital cost of pipe network and the energy cost. Two loading conditions and booster pumps for design of pipe network are considered to obtain the least cost design.

  • PDF

Estimation of Partial Safety Factors and Target Failure Probability Based on Cost Optimization of Rubble Mound Breakwaters (경사식 방파제의 비용 최적화에 기초한 부분안전계수 및 목표파괴확률 산정)

  • Kim, Seung-Woo;Suh, Kyung-Duck;Burcharth, Hans F.
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.22 no.3
    • /
    • pp.191-201
    • /
    • 2010
  • The breakwaters are designed by considering the cost optimization because a human risk is seldom considered. Most breakwaters, however, were constructed without considering the cost optimization. In this study, the optimum return period, target failure probability and the partial safety factors were evaluated by applying the cost optimization to the rubble mound breakwaters in Korea. The applied method was developed by Hans F. Burcharth and John D. Sorensen in relation to the PIANC Working Group 47. The optimum return period was determined as 50 years in many cases and was found as 100 years in the case of high real interest rate. Target failure probability was suggested by using the probabilities of failure corresponding to the optimum return period and those of reliability analysis of existing structures. The final target failure probability is about 60% for the initial limit state of the national design standard and then the overall safety factor is calculated as 1.09. It is required that the nominal diameter and weight of armor are respectively 9% and 30% larger than those of the existing design method. Moreover, partial safety factors considering the cost optimization were compared with those calculated by Level 2 analysis and a fairly good agreement was found between the two methods especially the failure probability less than 40%.