• Title/Summary/Keyword: 최적기동/정지

Search Result 18, Processing Time 0.024 seconds

Optimization of Unit Commitment Schedule using Parallel Tabu Search (병렬 타부 탐색을 이용한 발전기 기동정지계획의 최적화)

  • Lee, yong-Hwan;Hwang, Jun-ha;Ryu, Kwang-Ryel;Park, Jun-Ho
    • Journal of KIISE:Software and Applications
    • /
    • v.29 no.9
    • /
    • pp.645-653
    • /
    • 2002
  • The unit commitment problem in a power system involves determining the start-up and shut-down schedules of many dynamos for a day or a week while satisfying the power demands and diverse constraints of the individual units in the system. It is very difficult to derive an economically optimal schedule due to its huge search space when the number of dynamos involved is large. Tabu search is a popular solution method used for various optimization problems because it is equipped with effective means of searching beyond local optima and also it can naturally incorporate and exploit domain knowledge specific to the target problem. When given a large-scaled problem with a number of complicated constraints, however, tabu search cannot easily find a good solution within a reasonable time. This paper shows that a large- scaled optimization problem such as the unit commitment problem can be solved efficiently by using a parallel tabu search. The parallel tabu search not only reduces the search time significantly but also finds a solution of better quality.

Unit Commitment of a GENCO in the Electricity Market Considering Ramp Rates (발전기 특성을 고려한 전력시장에서 발전사업자의 기동정지계획)

  • Lee, Jong-Bae;Jung, Jung-Won
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.831-833
    • /
    • 2005
  • 과거 전력산업의 독점체제에서 발전기 기동 정지계획은 1-7일 정도의 예측된 부하를 최소비용으로 공급하기 위해서 발전기의 정보만을 고려하여 수요에 부합되도록 결정되었다. 향후 전개될 전력시장의 형태인 완전경쟁시장에서는 각 발전사업자가 자신의 발전기들을 대상으로 이익을 최대화하기 위한 입찰전략으로서의 기동정지계획을 수립하게 된다. 본 논문에서는 이익극대화로서의 발전사업자 기동정지계획을 수립함에 있어 유전알고리즘을 적용하였다. 또한 발전사업자의 입찰전략에 주요한 요소로 작용하는 입찰량 결정에 있어서 발전기 증감발율을 고려하여 최적의 발전량을 결정하도록 하였다.

  • PDF

Development of Simulation Model Based Optimal Start and Stop Control Daily Strategy (시뮬레이션 모델기반 냉난방 설비 일별 최적 기동/정지 제어기법 개발)

  • Lee, Chanwoo;Koo, Junemo
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.14 no.1
    • /
    • pp.16-21
    • /
    • 2018
  • This work aims to develop a platform to investigate the effect of operation schedules on the building energy consumption and to derive a simulation model based optimal start and stop daily strategy. An open-source building energy simulation tool DOE2 is used for the engine, and the developed simulation model is validated using ASHRAE guideline 14. The effect of late-start/early-stop operation of HVAC system on the daily building energy consumption was analyzed using the developed simulation model. It was found that about 10% of energy consumption cut was possible using the control strategy for an hour of advance of the stop operation, and about 3% per an hour of delay of the start operation.

Parallelization of Metaheuristic Algorithms to Solve the Large-scaled Optimization Problem (대규모 최적화 문제의 해결을 위한 메타휴리스틱 알고리즘의 병렬화)

  • 이용환;류광렬
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2002.05a
    • /
    • pp.435-441
    • /
    • 2002
  • 전력시스템 등, 산업 전반의 많은 분야에 최적화 문제가 산재해 있다. 또한 이러한 최적화 문제를 해결하기 위한 많은 연구가 있었다. 특정 응용에 국한되지 않고 모든 응용에 적용 가능한 메타휴리스틱 알고리즘은 그 중 많은 비중을 차지하고 있으며, 가장 대표적인 방법은 유전알고리즘과 타부 탐색이다. 그러나 최적화 문제에 속하는 많은 문제들이 탐색공간이 방대하고 많은 제약이 존재하는 대규모 최적화 문제로서 기존의 메타휴리스틱 기법들을 그대로 이용해서는 빠른 시간 내에 최적의 해를 찾아내기 힘들다 본 논문에서는 대규모 최적화 문제의 하나인 발전기 기동정지 계획 문제를 해결하기 위하여 유전알고리즘과 타부탐색을 적용하고 그 성능을 분석한다. 그리고 각 방법을 병렬화하여 수행함으로써 병렬화를 통하여 시간상의 이득과 함께 부가 효과로서 집중화와 다각화의 효과를 얻을 수 있음을 보여준다.

  • PDF

Torsional Vibration Control of a Rotating Shaft in Starting and Stopping Process (회전축의 기동.정지시의 비틀림 진동제어)

  • 김중배;이상조;박영필
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.16 no.3
    • /
    • pp.459-467
    • /
    • 1992
  • 본 연구에서는 비틀림 진동계에 있어서의 비틀림 진동현상을 억제하도록 제어 하기 위하여 최적제어 이론에 기초한 모델추종법을 비틀림 진동계에 적용하였다. 디 지탈 컴퓨터에 의한 제어를 위하여 제어 알고리즘은 디지탈 설계로 되어 있다. 제어 는 각속도와 비틀림 진동제어의 양면으로 수행되며, 축의 각속도는 모델의 출력을 추 종하게 되며 이와 동시에 비틀림각도 감소하게 된다.

Definition of Impact Angle and Impact Angle Control Law Against Maneuvering Target (기동표적에 대한 입사각 정의와 입사각 제어 유도법칙)

  • Kim, Hyun-Seung;Park, Sang-Sup;Ryoo, Chang-Kyung
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.43 no.8
    • /
    • pp.669-676
    • /
    • 2015
  • In this paper, a guidance law for intercepting maneuvering target with a desired impact angle is proposed. The proposed guidance law is modified from the optimal impact angle control law for a fixed target and given by a biased PN law with the impact angle control term in addition to the conventional PN law. Three different kinds of desired impact angles in the respect of LOS angle, flight path angle, and relative flight path angle to the target are defined. The performance of the proposed guidance law is investigated via numerical simulations for various air-to-air engagement scenarios.

Weekly Operation Planning of Thermal Generators Considering Energy Constraints (에너지절약을 고려한 화력발전기의 주간운용계획)

  • Song, Kil-Yeong;Lee, Buhm;Kim, Yong-Ha
    • Journal of Energy Engineering
    • /
    • v.4 no.3
    • /
    • pp.344-353
    • /
    • 1995
  • 화력발전기의 주간운용계획을 수립함에 있어 여러 에너지사용에 관련된 제약조건의 지배를 받는 발전기를 효율적으로 고려할 수 있는 새로운 방법을 개발하였다. 우선 이를 위하여 에너지제약을 고려한 운용계획문제를 Lagrangian Relaxation법에 의해 모델링하였다. 또한 에너지제약을 만족하는 최적의 화력발전기의 기동정지계획 및 발전출력을 원문제 내에서 구할 수 있도록 하였으며, 쌍대문제를 효율적으로 풀 수 있는 알고리즘을 개발하여 보다 빠르고 정확한 해를 구할 수 있도록 하였다. 제안한 방법을 시험계통 및 대규모 실계통에 적용하여 유용성을 검증하였다.

  • PDF

Adaptive matched filter based impulse noise cancellation method for PLC (적응형 정합필터링을 통한 전력선통신에서의 임펄스 잡음 제거기법에 관한 연구)

  • Son, J.H.;Shin, M.C.;Park, Y.;Kwon, Sam-Young;Park, Hyun-June;Cha, J.S.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.75-77
    • /
    • 2005
  • 전력선통신 시스템은 일반적인 통신시스템과는 달리 전력선에 연계된 다양한 부하기기들의 동작 및 변동에 따른 잡음이 발생한다. 특히 부하의 기동, 정지 시 발생하는 임펄스 잡음은 통신성능 저하의 주된 요인임으로 통신성능 향상과 신뢰성 높은 데이터 전송을 위하여 임펄스 잡음 제거와 임펄스 잡음 영향을 감쇠하기 위한 방안이 절실히 요구되고 있다. 따라서, 본 논문에서는 전력선 통신시스템에서 전송된 데이터를 오류 없이 복원해 내기 위하여 적응형 정합필터링 기법을 제안하고, 수신 측에서 임펄스잡음에 따른 최적의 탭 계수를 선택해 효과적으로 임펄스잡음을 제거하는 기법을 확립하였다. 또한, 제시한 알고리즘에 다양한 임펄스 잡음의 모델을 반영하여 비트오율에 대한 모의실험을 행하고 결과를 도출함으로써 제안 방식의 유용성과 신뢰성을 확인하였다.

  • PDF

A Study on the Optimal Unit Commitment Algorithm for Electric Power Systems (전력계통의 최적 발전기기동정지계획 산법에 관한 연구)

  • 김준현;유인근
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.34 no.6
    • /
    • pp.220-229
    • /
    • 1985
  • This paper proposes a new optimal unit commitment algorithm for the rational operation of electric power systems. Especially, the algorithm is improved by considering transmission line capacity limits and load forecasting uncertainty with the consideration of the participation factors of each units, so that the method becomes more reliable and flexible one. The transmission losses are considered by using updated penalty factors obtained from the constant matrixes of the fast decoupled load flow method, the system loads are distributed at each buses, and the several necessary operational constraints are also considered for the purpose of presenting a more practicable scheme. Finally, the effectiveness of the proposed algorithm has been demonstrated by applying to the 23-bus model system.

  • PDF

Unit Commitment of a Microgrid Considering Islanded Operation Scenarios (독립운전 시나리오를 고려한 마이크로그리드의 최적 발전기 기동정지 계획)

  • Lee, Si Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.6
    • /
    • pp.708-714
    • /
    • 2018
  • Islanded operation of a microgrid can ensure the reliable operation of the system when a large accident occurs in the main grid. However, because the generation capability of a microgrid is typically limited, a microgrid operator should take islanded operation risk into account in scheduling its generation resources. To address this problem, in this paper we have proposed two unit commitment formulations based on the islanding scenario that reflect the expected and worst-case values of the islanded operation risk. An optimal resource scheduling strategy is obtained for the microgrid operator by solving these optimization problem, and the effectiveness of the proposed method is investigated by numerical simulations.