• Title/Summary/Keyword: 최적교체

Search Result 201, Processing Time 0.029 seconds

A Numerical Study on the Thermal Stimulation of Continuous Moxibustion (연속 뜸의 열 자극에 대한 수치해석)

  • Yang, So-Ra;Kang, Ho-Young;Jeon, Byoung-Jin;Choi, Hyoung-Gwon
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.35 no.9
    • /
    • pp.915-922
    • /
    • 2011
  • In this paper, the unsteady incompressible Navier-Stokes equation coupled with energy equation was solved in order to investigate the thermal stimulation of continuous moxibustion using a commercial code (ANSYS-Fluent). In the simulations, various periods were selected for the continuous moxibustion, which was done by burning multiple disks successively. It has been found that the depth of the effective stimulation zone increases only when the replacing temperature is equal or larger than body temperature whereas the increase rate of the effective stimulation depth decreases as the number of disc increases. Further, it has been shown that the optimal period, for which the duration time of the effective stimulation zone is maximum, exists.

Two stage maintenance policy under non-renewing warranty (비재생보증 하에서의 이단계 보전정책)

  • Jung, Ki Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.27 no.6
    • /
    • pp.1557-1564
    • /
    • 2016
  • Recently, an extended warranty of a system following the expiration of the basic warranty is becoming increasingly popular to the user. In this respect, we suggest a two stage maintenance policy under the non-renewing warranty from the user's point of view in this paper. In the first stage, the user has to decide whether or not to purchase the extended warranty period. And, in the second stage, the optimal replacement period following the expiration of the warranty is determined. Under the extended warranty, the failed system is minimally repaired by the manufacturer at no cost to the user. We utilize the expected cost from the user's perspective to determine the optimal two stage maintenance policy. Finally, a few numerical examples are given for illustrative purpose.

Improving the water network management using the GIS (GIS를 이용한 상수도 배수관망 최적관리 시스템에 관한 연구)

  • 전철민;구자용;고준환;김병화
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2003.10a
    • /
    • pp.275-279
    • /
    • 2003
  • 2002년 현재 서울시는 99.99%에 이르는 높은 상수도 보급율에 비하여 유수율은 선진국의 수준에 이르지 못하고 있는 실정이다. 이는 정수장에서 배수지까지 연결되는 송수관과 배수지에서 각 가정으로 보낼 때 사용되는 배급수관에서의 누수 발생이 주 원인이며, 이는 곧 체계적인 관망 설계 및 운영이 미흡하기 때문인 것으로 지적되고 있다. 상수관로의 누수현상을 해결하고 효과적인 관리를 위한 근본적인 대책으로 노후관로의 교체가 필요하게 된다. 또한 노후관망 교체 등 유사시에 안정적인 상수의 공급을 위해 배수지간을 연결하는 대안 관로를 둘 필요가 있으며, 이러한 관망의 경로를 적절하게 설계해야 하는 것도 주요한 상수 공급 문제 중의 하나이다. 2000년 서울시 수도 정비 기본 계획의 관망 정비계획에 따르면 배수관리를 원활하게 하고 누수를 효율적으로 탐지·방지하기 위한 가장 이상적인 관망구성은 배수지 중심의 블록 시스템으로 보고 있다. 이와 같은 문제점들을 기반으로 하여, 본 연구는 GIS를 이용하여 효과적으로 노후관망을 관리하고, 대안 관망경로를 구축하는 시스템을 제안하였다. 본 연구에서는 배수지를 중심으로 한 블록 단위기반의 관망 노후도를 체계적으로 분석하는 시스템과 함께, 유사시를 대비한 최단/최적의 대안 경로를 산출하는 시스템을 구현하여 이를 서울 일부지역에 적용하여 그 유용성을 점검하였다. 상수도 관망의 설치 계획은 상수도 시설의 규모의 확장과 시설계량에 있어 대규모의 비용과 시간이 요구되는 특성을 가지고 있기 때문에 시설투자에 있어 정확한 예측과 분석을 통해 이루어져야 한다. 본 연구에서는 이러한 예측과 분석의 의사결정을 지원할 수 있는 상수도 배수 블록 노후도 관리 시스템과 최단/최적 연결 경로 산출 시스템을 구현해 봄으로써 다음과 같은 결론을 얻었다. 1. 상수도의 관망 노후도의 분석을 화면상에서 다양한 요소별로 하게 함으로써 넓은 공간에서의 관망의 관리를 효과적으로 할 수 있게 해준다. 2. 또한 이와 함께 대안 관망들을 사용자가 직접 대화식으로 빠르게 설계하고 이들의 경로와 공사비용 등을 산출해 봄으로써, 후보 최적 경로들을 공간적, 정량적으로 비교하는 것이 용이하다.

  • PDF

A Study on Disposal Diagnosis Algorithm of PV Modules Considering Performance Degradation Rate (태양광모듈의 성능저하율을 고려한 폐기진단 알고리즘에 관한 연구)

  • Park, Ji-Hyun;Lee, Hu-Dong;Tae, Dong-Hyun;Ferreira, Marito;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.10
    • /
    • pp.493-502
    • /
    • 2019
  • Recently, the installation of renewable energy including PV systems in distribution systems has increased energetically to cope with climate change and energy shortages according to the government's policy of renewable energy 3020. On the other hand, the electrical performance and lifespan of PV modules installed outdoors can be decreased considerably due to a range of deterioration phenomena depending on the ambient environmental factors. To overcome these problems, replacement of degraded PV modules with new ones is increased before the lifespan guaranteed by the makers of PV modules. Therefore, this paper proposes a disposal diagnosis algorithm to evaluate the time interval of the optimal replacement for PV modules according to performance degradation rate of PV modules. In addition, this study modeled an economic evaluation, which is composed of the cost and benefit of PV systems. From the simulation results based on the proposed modeling and algorithm to consider the performance degradation rate specifically, the replacement approach was found to have the best B/C ratio in 10th year with a 3[%] degradation rate and the disposal diagnosis algorithm of PV modules are useful and practical tools for economic evaluations of the replacement of PV modules.

A Hybrid Search Method of A* and Dijkstra Algorithms to Find Minimal Path Lengths for Navigation Route Planning (내비게이션 경로설정에서 최단거리경로 탐색을 위한 A*와 Dijkstra 알고리즘의 하이브리드 검색법)

  • Lee, Yong-Hu;Kim, Sang-Woon
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.51 no.10
    • /
    • pp.109-117
    • /
    • 2014
  • In navigation route planning systems using A* algorithms, the cardinality of an Open list, which is a list of candidate nodes through which a terminal node can be accessed, increases as the path length increases. In this paper, a method of alternately utilizing the Dijkstra's algorithm and the A* algorithm to reduce the cardinality of the Open list is investigated. In particular, by employing a depth parameter, named Level, the two algorithms are alternately performed depending on the Level's value. Using the hybrid searching approach, the Open list constructed in the Dijkstra's algorithm is transferred into the Open list of the A* algorithm, and consequently, the unconstricted increase of the cardinality of the Open list of the former algorithm can be avoided and controlled appropriately. In addition, an optimal or nearly optimal path similar to the Dijkstra's route, but not available in the A* algorithm, can be found. The experimental results, obtained with synthetic and real-life benchmark data, demonstrate that the computational cost, measured with the number of nodes to be compared, was remarkably reduced compared to the traditional searching algorithms, while maintaining the similar distance to those of the latter algorithms. Here, the values of Level were empirically selected. Thus, a study on finding the optimal Level values, while taking into consideration the actual road conditions remains open.

Development of Performance Evaluation System for The Ex-Core Instrumentation Detector of Nuclear Power Plant (원전 노외 핵계측 검출기 성능진단 시스템 구현)

  • Goo, Choi-Yong;Gyu, Jung-Chang;Ki, Lee-Jae
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1678_1679
    • /
    • 2009
  • 원전에 설치되어 있는 노외 핵계측 검출기는 설계수명과 품질보증 수명의 차이가 크기 때문에 적절한 검출기 교체 프로그램의 수립이 어렵다. 따라서 본 논문에서는 노외 핵계측검출기에 대한 노화 진행정도 판단 및 최적 교체주기 수립을 위한 원전 노외 핵계측 검출기 성능진단 시스템 및 분석기술에 대해 고찰하였다.

  • PDF

Optimal replacement policy following the expiration of payable RRNMW (유료 재생교체-비재생수리보증이 종료된 이후의 최적의 교체정책)

  • Jung, Ki-Mun
    • Journal of Applied Reliability
    • /
    • v.11 no.4
    • /
    • pp.409-417
    • /
    • 2011
  • In this paper, we consider a replacement model following the expiration of warranty. In other words, this paper proposes the optimal replacement policy for a repairable system following the expiration of payable renewing replacement-non-renewing minimal repair warranty. The expected cost rate per unit time from the user's perspective is used to determine the optimality of the replacement policy. Thus, we derive the expressions for the expected cycle length and the expected total cost to obtain the expected cost rate per unit time. Finally, the numerical examples are presented for illustrative purpose.

Optimal Rehabilitation Model for Water Distribution Systems (상수도 관망개선의 최적설계)

  • 김중훈
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 1993.07a
    • /
    • pp.535-543
    • /
    • 1993
  • 이 논문의 목적은 기존의 상수도 관망을 개선하는데 있어 어느 관을 교체 또는 재생할 것인가와 펌프용량을 얼마나 늘릴 것인가를 결정함으로써 관망내 각 급수지점에서의 요구유량및 수압을 만족시킴은 물론 그에 드는 비용을 최소화시키는 모델을 개발하는데 있다. 이 논문은 관교체 비용, 세관 및 재생 비용, 관보수 비용, 펌핑 비용, 펌프시설 확충비용 등의 다섯가지 비용들을 비교 검토함으로써 의사결정을 하게 된다. 제약조건식으로는 급수 조건식, 에너지 방정식, 수리학적 방정식, 결정 조건식, 한계 조건식, 정수 조건식 등이 있다. 이 모델을 수식화하면 정수혼합 비선형계획법 (mixed-integer nonlinear programming, MINLP) 문제가 된다. 이 문제를 풀기 위해 비선형해법의 GRG (generalized reduced gradient) 방법과 분기와 한계 (banch and bound) 기법을 통한 implicit enumeration 기법을 접목시키는 방법을 제안하였다.

  • PDF

Cache Replacement Policy Based on Dynamic Counter for High Performance Processor (고성능 프로세서를 위한 카운터 기반의 캐시 교체 알고리즘)

  • Jung, Do Young;Lee, Yong Surk
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.50 no.4
    • /
    • pp.52-58
    • /
    • 2013
  • Replacement policy is one of the key factors determining the effectiveness of a cache. The LRU replacement policy has remained the standard for caches for many years. However, the traditional LRU has ineffective performance in zero-reuse line intensive workloads, although it performs well in high temporal locality workloads. To address this problem, We propose a new replacement policy; DCR(Dynamic Counter based Replacement) policy. A temporal locality of workload dynamically changes across time and DCR policy is based on the detection of these changing. DCR policy improves cache miss rate over a traditional LRU policy, by as much as 2.7% at maximum and 0.47% at average.

Performance comparison of machine learning classification methods for decision of disc cutter replacement of shield TBM (쉴드 TBM 디스크 커터 교체 유무 판단을 위한 머신러닝 분류기법 성능 비교)

  • Kim, Yunhee;Hong, Jiyeon;Kim, Bumjoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.5
    • /
    • pp.575-589
    • /
    • 2020
  • In recent years, Shield TBM construction has been continuously increasing in domestic tunnels. The main excavation tool in the shield TBM construction is a disc cutter which naturally wears during the excavation process and significantly degrades the excavation efficiency. Therefore, it is important to know the appropriate time of the disc cutter replacement. In this study, it is proposed a predictive model that can determine yes/no of disc cutter replacement using machine learning algorithm. To do this, the shield TBM machine data which is highly correlated to the disc cutter wears and the disc cutter replacement from the shield TBM field which is already constructed are used as the input data in the model. Also, the algorithms used in the study were the support vector machine, k-nearest neighbor algorithm, and decision tree algorithm are all classification methods used in machine learning. In order to construct an optimal predictive model and to evaluate the performance of the model, the classification performance evaluation index was compared and analyzed.