• Title/Summary/Keyword: 최소량

Search Result 2,093, Processing Time 0.039 seconds

Required Sample Size for Estimating Litter Mass in Northern Hardwood Forests, New Hampshire, USA (미국 뉴햄프셔주 낙엽활엽수림에서 낙엽량 측정을 위한 최소 필요 표본수)

  • Bae, Kikang
    • Korean Journal of Environmental Biology
    • /
    • v.32 no.3
    • /
    • pp.211-215
    • /
    • 2014
  • In order to accurately estimate the litter mass, we evaluated the required sample sizes across 13 chronosequence stands for five years (1994~1996, 2003~2004) in northern hardwood forests in New Hampshire, USA. It was found that the number of required litter traps in our stands (0.25~0.5 ha) within ${\pm}10%$ of the sample mean was appeared to be similar or higher than the 15 litter traps installed in this study. Notably, in 1994 and 1995, the number of required litter trap was twice higher than the 15 litter traps. Further, within ${\pm}20%$ of the sample mean, the number of required litter traps was less than 10 across all 13 stands for five years, which indicates that we can reduce the sample size. Precisely, the number of sample size had increased in stands with steep and high elevation, but no relations with stand age across 13 stands were observed. Based on these results, we suggest that it is important to sample litter mass for several years, in order to determine the number of appropriate sample size, and stands with steep and high elevation may need more litter traps.

Method of estimating exploitable groundwater amount considering relationship between precipitation and recharge and the variation of 10-year minimum precipitation (강수량-함양량 관계와 10년 최소강수량 변화를 고려한 지하수 개발가능량 산정 기법)

  • Chung, Il-Moon;Lee, Jeongwoo;Lee, Jeong Eun;Kim, Min Soo
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.6
    • /
    • pp.421-427
    • /
    • 2019
  • The amount of exploitable groundwater amount in Korea has been determined by multiplying the 10-year frequency low precipitation by the recharge rate. In practice, however, the interpretation of the frequency analysis of precipitation is omitted, and the value obtained by multiplying the average recharge rate by the minimum precipitation in the recent 10 years is used as the recharge amount. Therefore, the contradiction arises that the amount of precipitation to be applied is determined according to the period selection rather than the actual low precipitation by the 10-year frequency analysis. In this study, we proposed a method for estimating the exploitable groundwater amount using the recharge amount considering the moving averaged 10-year minimum precipitation and the size of precipitation. This method was applied to the Uiwang, Gwacheon and Seongnam areas and the exploitable groundwater amount was calculated and compared with the results obtained by conventional methods. As a result, it has been confirmed that if the 10-year minimum precipitation is selected in the period including the extreme drought, the problem of underestimating the exploitable groundwater amount can be overcome by using the moving average minimum precipitation.

주가의 장기적 기억, 자기회귀 분수적불 이동평균 과정과 주가형성

  • Lee, Il-Gyun
    • The Korean Journal of Financial Studies
    • /
    • v.9 no.1
    • /
    • pp.95-118
    • /
    • 2003
  • 한 시계열의 자기상관계수의 절대값을 시차를 무한대로 접근시켜 가면서 각 시차에 대하여 구하고 이 절대값을 모두 더한 값이 무한일 때 이 시계열은 장기기억을 가진다. 이로 인하여 장기기억 모수를 추정하는데에는 자기상관을 기본으로 한다. 표본의 자기상관과 이론적 자기상관 사이의 거리를 최소하여 추정통계량을 유도하고 있는 것이 일반적이다. 이 경우에는 정상적 과정에 한하여 적용이 가능하다. 시계열은 어느 시계열이던지 간에 이 시계열에 적합한 모형이 존재할 것이고 이 모형을 시계열에 적용하면 잔차 시계열을 얻을 수 있다. 원래 시계열의 이론적 상관 대신 원래 시계열의 잔차 시계열의 자기상관과 표본의 자기상관 사이의 거리를 최소하여 추정통계량을 얻으면 통계량의 계산이 편하고 이 추정량은 정상적 시계열과 비정상적 시계열에 다같이 적용할 수 있다. 본 논문에서는 잔차의 자기상관을 이용하여 자기회귀 분수적분 이동평균 과정의 모수 추정량을 도출한다. 그리고 이 추정 통계량에 입각하여 주가의 형성과정을 살펴보고 장기기억이 옵션가격과 포트폴리오 구성에 미치는 영향을 밝힌다.

  • PDF

1'st stage Emission Trading Simulation Analysis (발전부문 배출권 모의거래 시행결과 분석 및 고찰)

  • Kim, Yong-Wan;Kwak, Wang-Shin;Ok, Ki-Youl;Cho, Se-Cheol
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.561_562
    • /
    • 2009
  • 발전부문 배출권 모의거래는 배출권 거래제 도입시 발전부부문에 미치는 영향 분석을 통해 발전부문의 대응전략을 수립하기 위한 목적으로 2008년에 전력거래소가 주관하여 발전5사(남동, 중부, 서부, 동서, 남부)가 주요 참여사로 하여 국내최초로 국내실정에 맞는 배출권 모의거래를 시행하였다. 모의거래에서는 2가지의 시나리오를 설정하였다. 시나리오 I은 최소발전량 발전, 시나리오 II는 총발전운영계획량과 발전실적량을 일치토록하는 전제조건을 설정하였다. 그 결과 시나리오 I에서 모든 참여사는 최소 조건을 충족하도록 발전하는 전략적 행위로 인하여 전력공급지장이 발생하였고, 시나리오 II는 온실가스 배출량이 적은 LNG발전소의 발전량은 증가시키고, 온실가스량이 많은 석탄화력은 증가 운전토록하는 전략적 행위를 취함으로써 발전원가의 상승으로 인하여 전력가격이 상승하는 결과를 초래하였다. 따라서 향후 우리나라에 배출권 거래제 도입될 경우에 대비하여 전력시장과 연계한 배출권 거래제의 다양한 시뮬레이션이 필요하다.

  • PDF

Determination of Slant Wet Delay using GPS (GPS를 이용한 시선방향 습윤지연 결정)

  • 하지현;박관동;박종욱
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2004.03a
    • /
    • pp.141-146
    • /
    • 2004
  • 본 연구에서는 Canada Southern Alberta Network의 6곳의 GPS(Global Positioning System) 상시관측소 데이터를 바탕으로 관측소와 각 GPS 위성간의 시선방향 습윤지연량을 결정하였다. 고정밀 GPS 데이터를 이용하여 천정방향 습윤지연량을 결정하고 이를 WVR(Water Vapor Radiometer)에서 측정한 천정방향 습윤지연량과 비교하였다. 그 결과 WVR의 천정방향 습윤지연량과 비교할 때 GPS로 관측한 천정방향 습윤지연량은 최대 1.39cm, 최소 0.99cm의 RMS 오차를 보였다. 또한 GPS로 관측한 시선방향 습윤지연량은 WVR과 비교할 때, PRN 25번 위성의 경우최대 17cm, 최소 0.05cm의 차이가 났다.

  • PDF

Characteristics of Wastewater for Pung-gi Wastewater Treatment Basin in Asan City (아산시 풍기처리분구 하수발생특성)

  • Oh Kyung Seok;Ho Jong-Kwang;Kim Kyung-Won;Hwang Byung-Gi
    • Proceedings of the KAIS Fall Conference
    • /
    • 2004.06a
    • /
    • pp.275-277
    • /
    • 2004
  • 본 연구에서는 아산시의 풍기처리구역을 대상으로 건기시 하수발생량 및 농도의 시간적, 공간적 변화를 조사하였다. 또한 주중과 주말의 하수발생 특성을 알아보기 위해 조사기간내 연속측정된 하수발생량을 요일별로 나누어 각각의 하수발생특성을 조사하였다. 조사 결과 주거지역인 풍기처리구역은 상업지역과는 다르게 직장인의 퇴근 후인 저녁시간대에 하수량이 증가하였다가 점차로 감소하여 새벽녘 4시경에 최소가 되는 것으로 조사되었다. 수질농도는 하수의 피크유량이 발생하였을 때 상대적으로 높았고, 최소유량이 발생하는 새벽시간대에 가장 낮은 농도를 나타내는 것으로 조사되었다. 주중과 주말의 하수발생 특성을 보면, 상업지역의 하수발생량은 주중과 주말의 차이가 뚜렷하게 나타나지 않는 반면 주거지역의 하수발생량은 주말에 직장인들이 가정에 머무르는 시간이 많아지면서 하수량이 증가하는 것으로 조사되었다.

  • PDF

A Method of Estimating the Volume of Exploitable Groundwater Considering Minimum Desirable Streamflow (최소하천유출량을 고려한 지하수 개발가능량 산정방안)

  • Chung, Il-Moon;Lee, Jeongwoo
    • The Journal of Engineering Geology
    • /
    • v.23 no.4
    • /
    • pp.375-380
    • /
    • 2013
  • The concept of safe yield places an emphasis on balancing groundwater withdrawal with groundwater recharge but ignores naturally occurring groundwater discharge. Because streams and their alluvial aquifers are closely linked in terms of water supply and water quality, to be properly understood and managed they must be considered together. Therefore, some districts in Kansas have reevaluated their safe-yield policies to account for natural groundwater discharge and stream-aquifer interactions by amending their safe-yield regulations to include a portion of baseflow as the minimum desirable streamflow (MDS). This study proposes a modified safe-yield policy in which the drought flow is chosen as the MDS. Baseflow separation was conducted from streamflow hydrograph and the results are presented as a flow-duration curve. The exploitable groundwater can be determined by subtracting MDS from the cumulative baseflow. This method was tested in the Musimcheon watershed, which was validated for streamflow using the SWAT-K model. The annually averaged exploitable groundwater in the whole watershed was estimated to be 86 mm. The exploitable groundwater amounts were also estimated for each subwatershed in the Musimcheon watershed.

An Analysis of the down stream impact of dam Characteristics of Dam Using Indicators of Hydrologic Alterations (수문변화지표법을 이용한 댐 특성요소별 하류하천에 미치는 영향분석)

  • Kang, Ki-Ho;Park, Bong-Jin;Jung, Kwan-Sue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.1948-1952
    • /
    • 2008
  • 본 연구에서는 수문변화 지표법을 적용하여 광동댐 등 12개 용수 전용댐의 연 최소 최대유량 크기와 지속기간, 고 저맥파 빈도와 주기, 수문곡선 변화 비율과 빈도, 유량변화정도 등을 분석하여 댐이 하류하천에 미치는 영향을 수치로 제시 하였다. 광동댐 등 12개 댐의 월 유량변화를 산정한 결과, 갈수기에 해당하는 10월부터 다음해 6월까지 8개월간의 댐건설전 월평균 방류량은 $0.64\;m^3/sec{\sim}3.05\;m^3/sec$이었으나, 댐건설후 월평균 방류량은 $0.33\;m^3/sec{\sim}2.99\;m^3/sec$$-69.7%{\sim}167.8%$의 분포를 나타내고 있으며, 12월과 1월을 제외하면 댐건설 이후 오히려 $6.8%{\sim}69.7%$가 감소하였다. 우기철인 7월부터 9월까지 3개월간은 댐건설전 월평균 방류량이 $6.82\;m^3/sec{\sim}7.67\;m^3/sec$이었으나, 댐건설후 월평균 방류량은 $4.12\;m^3/sec{\sim}4.35\;m^3/sec$$51.0%{\sim}55.1%$가 감소하여 저수지 공용량을 이용한 저류효과가 다소 있었던 것으로 분석되었다. 연 최소 최대유량 크기와 지속기간 분석결과 1일, 3일, 7일, 30일, 90일 최소유량은 광동댐 등 10개 댐이 댐건설 전후 모두 $0.0\;m^3/sec$로 증감이 없었으며, 달방댐의 경우 30일 최소유량이 $0.026\;m^3/sec$에서 $0.000\;m^3/sec$로 99.11%가 감소하였다. 영천댐의 경우도 30일 최소유량이 $0.101\;m^3/sec$에서 $0.067\;m^3/sec$로 33.73%가 감소 하였으며, 90일 최소유량의 경우 달방댐은 $0.067\;m^3/sec$에서 $0.031\;m^3/sec$로 53.48%가 영천댐은 $0.219\;m^3/sec$에서 $0.150\;m^3/sec$로 31.29%가 감소하였다. 12개 용수 전용댐중 유지용수공급이 계획되어 있는 영천댐과 달방댐을 제외하고는 댐하류 방류량이 없이 건천화 되었다는 사실을 알 수 있다. 고 저맥파의 빈도와 주기 분석결과 댐건설 이후 수문곡선이 25% 이하로 떨어지는 저맥파는 $72.99%{\sim}98.52%$가 감소하였으며, 저맥파의 기간은 $-80.0%{\sim}4,423.3%$까지 분포하여 상당히 증가하였다. 수문곡선이 75%를 초과하는 고맥파의 발생 횟수는 댐건설 이후 $34.28%{\sim}91.67%$가 감소하였으며, 고맥파의 기간은 $-64.31%{\sim}135.62%$로 증가 또는 감소하였다.

  • PDF

Hydrologic Regime Alteration Analysis in downward river by dam-specific(functions, size) through I.H.A (수문변화 지표법을 적용한 댐 특성 요소별 하류하천에 미치는 유황변화 분석)

  • Kang, Ki-Ho;Yum, Kyung-Taek;Jung, Kwan-Sue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.1422-1426
    • /
    • 2009
  • 본 연구에서는 댐 특성(기능, 규모)별로 하류하천에 미치는 유량변화 문제를를 체계적으로 분석하고자 수문변 화지표법(Indicators of Hydrologic Alteration, Richter et al., 1996)을 적용하여 한국수자원공사에서 관리하는 소양강댐 등 11개 다목적댐과 광동댐 등 12개 용수전용댐의 일단위 유입량과 방류량 자료를 이용, 연최소 최대유량 크기와 지속기간, 유량변화정도 등을 분석하여 댐운영이 하류하천에 미치는 유량변화를 비교분석 하였다. 광동댐 등 12개 용수전용댐의 월 유량변화의 산정 결과, 갈수기에 해당하는 10월부터 다음해의 6월까지 8개월간은 댐건설전 월평균 방유량은 $0.64m^3/sec\sim3.05m^3/sec$이었으나, 댐건설후 월평균 방류량은 $0.33m^3/sec\sim2.99m^3/sec$로 -69.7%$\sim$167.8%의 분포를 나타내고 있으나 12월과 1월을 제외하면 댐 건설 이후 오히려 6.8%$\sim$69.7% 가 감소하였다. 우기철인 7월부터 9월까지 3개월간은 댐건설전 월평균 방류량이 $6.82m^3/sec\sim7.67m^3/sec$이었으나, 댐건설후 월평균 방류량은 $4.12m^3/sec\sim4.35m^3/sec$로 51.0%$\sim$55.1%가 감소하여 저수지 공용량을 이용한 저류효과가 다소 있었음을 알 수 있다. 용수전용댐과 다목적댐의 분석 결과를 비교하여 보면, 용수전용댐은 1일 최소유량의 경우는 평균적으로 76.52%가 증가하였으나 3일부터 90일 최소유량의 54.19%$\sim$67.19%까지 감소하여 갈수기 하류유량 개선효과는 없으나, 다목적댐의 경우는 1일 최소 유량은 743.76%가 증가하였으며 90일 최소 유량도 83.62%가 증가하여 갈수기 하류유량 개선 효과가 큰 것으로 분석되었다. 용수전용댐의 1일 최대유량의 경우는 37.8%가 감소되며 90일 최대유량은 38.5$\sim$51.0%까지 감소하여 홍수기 댐의 저류효과가 점차 증가하였다. 다목적댐의 경우는 1일 최대 유량은 59.4%가 감소하였으며 감소량은 점차 감소하여 90일 최대강우량은 30.1%가 감소하여 홍수기 댐 저류효과로 하류홍수량을 상당히 조절함을 알 수 있다.

  • PDF

Mean Estimation in Two-phase Sampling (이중추출에서 모평균 추정)

  • 김규성;김진석;이선순
    • The Korean Journal of Applied Statistics
    • /
    • v.14 no.1
    • /
    • pp.13-24
    • /
    • 2001
  • In this paper, we investigated mean estimation methods in two-phase sampling. Under the fixed expected cost we reviewed the optimal sample sizes, minimum variances and approximate unbiased variance estimators for usual ratio estimator, stratified sample mean with proportional allocation and Rao's allocation of the second phase sample. Also we proposed combined ratio estimator, which uses both ratio estimation and stratification and derived optimal sample size, minimum variance and unbiased variance estimator. Through a limited simulation study, we compared estimators by design effects and came to know that ratio estimator is more efficient than stratified sample mean in some cases and inefficient in the other cases, but combined ratio estimator is more efficient than others in most cases.

  • PDF