• Title/Summary/Keyword: 최대 수요 전력

Search Result 1,421, Processing Time 0.032 seconds

Maximum Efficiency Point Tracking Algorithm for improving efficiency of Photovoltaic power generating system (최대효율점 추종 알고리즘을 이용한 태양광발전시스템의 효율 개선)

  • Kwon, Cheol-Soon;Kang, Feel-Soon
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1165-1166
    • /
    • 2011
  • 본 논문에서는 대용량의 계통연계형 태양광발전시스템의 효율 개선을 위한 제어 알고리즘을 제안한다. 제안된 알고리즘은 태양전지로부터 생산되는 전체 전력량을 모니터링 하여 최대 효율 조건에서 동작할 수 있도록 구동시킬 인버터 수와 각 인버터가 담당할 전력량을 결정하고 이에 따른 태양전지의 직병렬 결합 조건이 가능하도록 태양전지의 배열을 릴레이 접점으로 재구성하는 방식이다. 제안된 알고리즘의 타당성 검증을 위해 LabVIEW 기반의 제어시스템을 구성하고 분석한다.

  • PDF

A Field Weakening Control for squirrel-cage induction motor drives in variable DC-Link voltage conditions (농형유도전동기의 DC-Link 전압 가변 조건이 고려된 약계자 제어 알고리즘)

  • Seo, YongJoo;Jung, JunHyung;Park, HyungSuk;Kim, JangMok
    • Proceedings of the KIPE Conference
    • /
    • 2013.07a
    • /
    • pp.110-111
    • /
    • 2013
  • 전원의 변동이 심한 전압원을 사용하는 선박, 전기자동차 등에서는 DC-Link전압이 가변하기 때문에 낮은 영역의 전압에서는 최대출력 운전을 할 수가 없다. 낮은 영역의 전압에서 최대 출력을 하기 위하여 유도전동기 ${\Delta}$결선 운전을 해야 하지만 ${\Delta}$결선 운전시 높은 입력 전류로 인하여 인버터 전력소자의 온도가 상승하게 된다. 따라서 유도전동기 Y결선 운전을 하고 부족한 출력은 유도전동기 약계자 제어를 하여야 한다. 본 논문은 가변 DC-Link 전압에서 최소의 상전류로 전력소자와 유도 전동기의 상태에 따라 최대출력 운전을 하는 약계자 제어 알고리즘을 제안하였다.

  • PDF

Maximum Torque Per Ampere Operation Point Tracking Control for Permanent Magnet Synchronous Motors (영구자석 동기전동기의 단위 전류 당 최대 토크 운전 점 추적 제어)

  • Lee, Kwang-Woon
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.12 no.4
    • /
    • pp.291-299
    • /
    • 2007
  • To operate a permanent magnet synchronous motor (PMSM) at a maximum torque per ampere (MTPA) operation point, the exact values of machine parameters such as inductances and back-EMF constant, which are sensitive to motor phase currents and temperature respectively, should be blown. An adaptive estimation method for on-line estimation of the machine parameters is not suitable for practical applications since it has difficulties in estimating exact values and requires complex mathematical calculations. The purpose of this paper is to present a simple MTPA operation point tracking control strategy for vector controlled PMSM drives with slow dynamic loads. The proposed method searches MTPA operation points by modulating current phase angle and observing the variation in command power. The current angle modulation strategy is designed to sense the effect of load variations in the command power. Therefore, the proposed method can track the MTPA operation points of the PMSM regardless of load variations. Computer simulation and experimental study is also presented to show the effectiveness of the proposed method.

Electricity Demand Forecasting for Daily Peak Load with Seasonality and Temperature Effects (계절성과 온도를 고려한 일별 최대 전력 수요 예측 연구)

  • Jung, Sang-Wook;Kim, Sahm
    • The Korean Journal of Applied Statistics
    • /
    • v.27 no.5
    • /
    • pp.843-853
    • /
    • 2014
  • Accurate electricity demand forecasting for daily peak load is essential for management and planning at electrical facilities. In this paper, we rst, introduce the several time series models that forecast daily peak load and compare the forecasting performance of the models based on Mean Absolute Percentage Error(MAPE). The results show that the Reg-AR-GARCH model outperforms other competing models that consider Cooling Degree Day(CDD) and Heating Degree Day(HDD) as well as seasonal components.

A Study on the BESS(Battery Energy Storage System) as a Telecommunications Power Source (통신용 전원으로서의 전력저장시스팀(BESS) 적용에 관한 연구)

  • Min, Byung-Rok;Cho, Il-Kwon;Park, Gyug-Kue;Park, Byung-Joo;Ahn, Che-Hong
    • Proceedings of the KIEE Conference
    • /
    • 1999.07a
    • /
    • pp.412-414
    • /
    • 1999
  • 통신용전원으로서의 전력저장시스팀(BESS)은 전기요금이 싼 심야시간(또는 필요시간)에 2차전지(축전지)를 이용하여 전력을 저장하고 최대 부하시나 필요한 시기에 전력을 방출하는 시스팀을 말한다. 이 시스팀은 축전지의 충분한 사용과 최대전력제어에 의한 전기요금 절감측면 등에서 상당히 효율적이라 할 수 있다. 본 논문에서는 이러한 전력저장시스팀을 통신용전원으로 활용하기 위한 방법과 실지 적용시 고려사항, 기대효과 및 개략적인 경제성 비교 둥을 통하여 전력저장시스팀의 통신용전원 적용방안을 검토하고자 한다.

  • PDF

A Study on the Low Power Algorithm for a Task (태스크에 따른 저전력 알고리즘에 관한 연구)

  • Kim, Jae-Jin
    • Journal of Digital Contents Society
    • /
    • v.14 no.1
    • /
    • pp.59-64
    • /
    • 2013
  • In this paper, we proposed low power algorithm for a task. The task means the inside of a necessary processor and external resources to work accomplishment of a system. Each task analyzes a life time and a number of called for implement a low power circuit. First of all, reduce power consumption of a task have maximum power consumption for low power circuit implementation. Therefore, first selecting a task had maximum power consumption. The task had a maximum power consumption ranking consider a life time and a number of called for each task. While a life time of task is long, top priority ranking to decrease power consumption to the task that the number of call generates the power consumption how a disguise is large in case of a lot of task becomes. Frequency decision to have minimum power consumption, and decrease power consumption all the circuit by a change of frequency of the task which the minimum task that a wasting past record is the maximum becomes. Also, keep continuously minimum power consumption, with every effort task until last life time in opening life time, and decrease gets total power consumption. Experiments results show reduction in the power consumption by 5.43% comparing with that [7] algorithm.

The development of Power Control System using Linux Controller (리눅스제어기를 이용한 가정용 전력제어시스템의 개발)

  • Woo, Chun-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2001.07e
    • /
    • pp.43-46
    • /
    • 2001
  • 본 연구에서는 인터넷을 이용하여 원격으로 사용전력량을 검침하며, 여름철 첨두 부하시 부족한 전력량을 효율적으로 운영하는 시스템을 개발한다. 특히 세대수가 밀집되어 최대수요전력 제어 효과가 높은 아파트를 우선적으로 제어 대상 지역으로 선정하며, 이에 맞는 구조로 저렴하고 동작이 확실한 시스템을 구성한다. 대개의 아파트는 자체 망이 구성되어 있으므로 인터넷 통신망에 접속하기 쉬우며 또한 신규 설치 시에도 저렴하게 시공할 수 있는 환경을 제공한다. 또한 본 연구에서 POST를 구성하는 산업용 임베디드 리눅스는 기존의 제어기를 구성하던 임베디드 시스템에 실시간 운영체제인 리눅스를 실장시켜 사용한다.

  • PDF

Design and Implementation of 10kW High Efficiency DC/DC Converter (10kW 고효율 DC/DC 컨버터 설계 및 실험)

  • Park, Su-Mi;Cho, Chan-Gi;Song, Seung-Ho;Bae, Jung-Soo;Jang, Sung-Roc;Ryoo, Hong-Je
    • Proceedings of the KIPE Conference
    • /
    • 2017.07a
    • /
    • pp.20-21
    • /
    • 2017
  • 본 논문에서는 LCC 공진형 컨버터 토폴로지를 기반으로 한 10kW 급 고효율 DC/DC 컨버터를 설계, 제작하고 그 실험 결과를 기술한다. 제작된 컨버터는 공진 주파수 이상 연속 도전 모드에서 동작하도록 설계되어 도전 손실과 스위칭 손실을 줄일 수 있으며 다양한 부하조건에 대해 97% 이상의 높은 효율을 보인다. 컨버터는 최대출력 10kW를 발생시킬 수 있는 구조로 최대출력전압 500V, 최대출력전류 25A 조건으로 설계 되었으며, 실험은 경부하 조건에서 정격부하 조건까지의 동작을 확인할 수 있도록 제작된 모의 저항 부하를 사용하였다. 실험 결과 제작된 컨버터는 50% 부하 조건에서 97%, 정격부하 조건에서 98.5%의 효율을 보이는 것으로 확인되었다.

  • PDF

5m-off-long-distance inductive power transfer system using dipole coils (다이폴형 코일을 사용한 5m 거리의 자기유도 무선전력전송 기술)

  • Park, Changbyung
    • Proceedings of the KIPE Conference
    • /
    • 2012.07a
    • /
    • pp.627-628
    • /
    • 2012
  • 기존 자기공진형태에서 사용되는 루프 형태의 코일 대신에 코어를 사용한 다이폴 형태의 코일을 1차 측과 2차 측에 사용해 코일의 부피를 줄이 면서도 먼 거리까지 자기장을 보낼 수 있는 자기유도방식의 무선 전력 시스템을 구성 하였다. 각 코일에 사용된 코어의 형상은 코어 내부에서 자기장이 균일하게 분포 될 수 있도록 최적화 되었으며 5m 거리에서 209W의 전력을 전달하고, 최대 16%의 효율을 달성 하였다.

  • PDF

Superposition Coding Multiplexing for Fading Broadcast Channels with Rate Constraints (전송률 제한을 둔 페이딩 방송채널을 위한 중첩코딩 다중화)

  • Lee, Min;Oh, Seong-Keun;Jeong, Byung-Jang
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.33 no.11A
    • /
    • pp.1072-1078
    • /
    • 2008
  • In this paper, we propose an efficient superposition coding multiplexing(SCM) method based on power allocation in descending order for fading broadcast channels in which per-user minimum and maximum rate constraints are considered in order to maximize the transmission effectiveness. It consists of three steps as follows. In the first step, a user group is selected to maximize the number of users with whom a transmitter can communicate instantaneously. In the second step, per-user power allocation for each user is done in descending order of transmit power by determining a maximum allowable interference power from all subsequent interfering users in order to guarantee its corresponding minimum rate, and then a residual power is calculated. The final step is performed if some power remains even after the second step. In this step, additional power allocation is performed up to the maximum transmit power to provide the maximum rate to the corresponding user, again in ascending order, starting from the last user in descending order. But, this method does not require power reallocation to subsequent users because tentative power allocation in the second step has been performed in descending order to guarantee the minimum rate for each user, taking into account the maximum allowable interference power from all the subsequent users. Therefore, the proposed method gets more efficient in term of computational complexity when per-user minimum as well as maximum rate constraints exist, especially as the number of users increases.