• Title/Summary/Keyword: 총지체

Search Result 136, Processing Time 0.022 seconds

Development of a New Method for Level of Service Analysis on Two-Lane Rural Highways (2차선도로의 새로운 서비스수준분석방법의 개발)

  • 이동민;최재성
    • Journal of Korean Society of Transportation
    • /
    • v.18 no.3
    • /
    • pp.101-112
    • /
    • 2000
  • The Purpose of this Paper was to revise the method of USHCM and to establish new method for level of service analysis on two-lane rural highways. For this Purpose, total delay rate was selected as new MOE for level of service, replacing the present Percent time delay. This result showed that total delay rate was more effective for considering the effects of traffic flows, auxiliary lane, and vertical tirade. The application of total delay rate could resolve the Problems in the USHCM method, such as too wide ranges for level of service D and E, and the use of different Procedures for level of service analysis of general terrain segment and specific grade Procedures. The research results are as follows First, a new method for level of service analysis on two-lane rural highways was developed using the total delay rate. Second, a new classification for level of service was developed and a consistent method applicable for general terrain segment and specific tirade Procedures was developed. Third, the desired speed on two-lane rural highways was determined as 85km/h.

  • PDF

A Study on The New Level of Service for Rural Two-Lane Highways (지방부 2차로도로의 새로운 서비스수준 산정에 관한 연구)

  • Park, Je-Jin;Ha, Tae-Jun
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.2
    • /
    • pp.47-56
    • /
    • 2008
  • Two-Lane Highway of Korea is important, Because it has the largeest portion of all roads of Korea. But it has only one lane for one direction. So, If Delays are happened by low-speed vehicles, high-speed vehicles should over-take through the other side of the road. This over-takings can generate the high possibility of traffic accidents and the severity of traffic accidents by over-takings is very high. Because it generates a head-on collision. But the level of Service that indicates the operation states of Two-Lane Highway is defined as a conception that explains the operation conditions of traffic safety etc. Whencalculating the Level of service. It is considered by only delays. So, in this paper, first, this author wants to present the calculation of delay-time by Total-Delay Rate. Second, by multiplying this delay-time by the costs of delays wants to present the method of calulates the total delay costs. Third, to consider the traffic accidents, After predicting the number of traffic accidents, As multipling this by the average of costs of traffic accidents. want to present the method to calculate Total traffic accidents costs. Forth, present the operation costs.

The Study on Effects Caused by the Initial Queue to the Total Delay Estimation in Analyzing Signalized Intersection (신호교차로 분석시 초기대기행렬이 총지체도에 미치는 영향에 관한 연구)

  • Park, Soon-Pyo;Kim, Ki-Hyuk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.5D
    • /
    • pp.563-570
    • /
    • 2009
  • This study is aimed to analyze the overall effects of the additional delay caused by the vehicle in front of the queue, at the signal, to the total delay estimation. To estimate the average vehicle delay at the signalized intersection, as survey of the queue length at the intersection and traffic counts were conducted. As a result of this analysis, all of the three delay estimation methods turned out to be similar in that the estimation of the average delay for the test vehicle was less than 60 sec/vehicle. However, the average delay time for the vehicle in front of the queue only, was estimated at 60-70 sec/vehicle which is similar to the average delay of the test vehicle.

Estimation of delay time between precipitation and groundwater level in the middle mountain area of Pyoseon watershed in Jeju Island using moving average method and cross correlation coefficient (이동평균법과 교차상관계수를 이용한 제주도 표선유역 중산간지역의 강수량과 지하수위 간의 지체시간 추정)

  • Shin, Mun-Ju;Moon, Soo-Hyoung;Koh, Gi-Won;Moon, Duk-Chul
    • Journal of Korea Water Resources Association
    • /
    • v.53 no.7
    • /
    • pp.533-543
    • /
    • 2020
  • In order to provide information for proper management of groundwater resources, it is necessary to estimate the rise time of groundwater level by calculating the delay time between the time series of precipitation and groundwater level and to understand the characteristics of groundwater level variation. In this study, total delay time (TDT) and cross correlation coefficient between the moving averaged precipitation generated by using the moving average method to take into account the preceding precipitation and the groundwater level were calculated and analyzed for the nine groundwater level monitoring wells in the Pyoseon watershed in the southeast of Jeju Island. As a result, when the moving averaged precipitation was used, the correlation with the groundwater level was higher in all monitoring wells than in the case of using the raw precipitation, so that it was possible to more clearly estimate the delay time between precipitation and groundwater level. When using the moving averaged precipitation, it had cross correlation coefficients of up to 0.57 ~ 0.58 with the time series data of the groundwater level, and had a relatively high correlation when considering the preceding precipitation of about 24 days on average. The TDT was about 32 days on average, and it was confirmed that the consideration of preceding precipitation plays an important role in estimating the TDT because the days of moving averaged precipitation greatly influences the calculation of the TDT. In addition, through the use of moving averaged precipitation, we found an error in estimating the TDT due to the use of raw precipitation. Through the method of estimating the TDT used in this study and the use of the R code for estimating the TDT presented in the appendix of this paper, it will be possible to estimate the TDT for other regions in the future relatively easily.

A Study of Total Delay Occurrence Depending on Merging Speed from Acceleration Lane (도로연결 시설 진출차량의 합류속도에 따른 본선 유발 총 지체 분석)

  • Lee, Junhyung
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.19 no.2
    • /
    • pp.62-73
    • /
    • 2020
  • Access management is aimed at preserving the road's high intercity mobility. In urbanized areas, immoderate acceleration lane-length requirements restrict the accessibility of land. Therefore, there are many opinions to revise the minimum acceleration lane-length requirement. For this purpose, it is important to diagnose the effects of slow vehicles on the mainline. This study analyzed a single merging vehicle's total delay occurrence depending on the mainline traffic flow rate and merging speed. A linear relationship was observed between the mainline traffic flow rate and total delay. As a merging speed increases gradually from 40km/h to 100km/h in 20km/h intervals, the total delay decreases by 5.0, 1.6, and 5.1 times, respectively. This shows that the ideal condition with the total delay is less than 0.5 vehicle·sec when there is no speed difference between the mainline and merging vehicle. On the other hand, given the one-second response time of drivers, the total delay occurrence was slightly low when the speed difference between the mainline and merging vehicle was less than 20km/h.

A Variable Speed Limits Operation Model to Minimize Confliction at a Bottleneck Section by Cumulative Demand-Capacity Analysis (대기행렬이론을 이용한 병목지점 충돌위험 저감 가변속도제어 운영모형)

  • LEE, Junhyung;SON, Bongsoo
    • Journal of Korean Society of Transportation
    • /
    • v.33 no.5
    • /
    • pp.478-487
    • /
    • 2015
  • This study proposed a Variable Speed Limits(VSL) algorithm to use traffic information based on Cumulative Demand-Capacity Analysis and evaluated its performance. According to the analysis result, the total of delay consisted of 3 separate parts. There was no change in total travel time although the total of delay decreased. These effects was analysed theoretically and then, evaluated through VISSIM, a microscopic simulator. VISSIM simulation results show almost same as those of theoretical analysis. Furthermore in SSAM analysis with VISSIM simulation log, the number of high risk collisions decreased 36.0 %. However, the total delay decrease effect is not real meaning of decrease effect because the drivers' desired speed is same whether the VSL model is operated or not. Nevertheless this VSL model maintains free flow speed for longer and increases the cycle of traffic speed fluctuation. In other words, this is decrease of delay occurrence and scale. The decrease of speed gap between upstream and downstream stabilizes the traffic flow and leads decrease number of high risk collision. In conclusion, we can expect increase of safety through total delay minimization according to this VSL model.

버스 운영 최적화에 관한 연구 -운행간격, 정차시간, 정류장 간격 및 버스 보유대수 등을 중심으로-

  • 이승헌;전경수
    • Proceedings of the KOR-KST Conference
    • /
    • 1998.10b
    • /
    • pp.465-465
    • /
    • 1998
  • 버스운영에 관한 최적화 모형에는 총 시스템 비용의 최소화 모형과 사회적 편익의 극대화 모형이 있다. 이들 모형들은 해석적 방법에 의해서 특정 이상화된 문제를 연구했다. 특정 필요조건들을 충족시키면서 최적 버스크기, 서비스 빈도, 보유대수를 결정하려고 애썼다. 그러나 실제 버스의 운행시간은 정류장의 지체시간과 승객의 수요에 따라 변화하고 승객의 비용추정시 접근시간을 현실적으로 고려하지 못해 버스 운영의 비효율성을 초래하기 쉽다. 본 연구의 목적은 시간대별로 이용자와 운영자의 비용의 합으로 구성된 총 교통 모형을 최소화는 모형을 구축하는 것이다. 본 논문에서는 기존의 문헌에서 충분히 고려하지 않은 정류장 간격에 따른 이용자의 접근시간과 버스가 정류장에 들어가고 나올 때의 감·가속으로 인한 지체와 승객의 승·하차로 인한 지체를 고려한 버스의 정류장 정차시간을 기존의 모형에 추가시켜서 운행간격, 버스정류장의 정차시간, 정류장 간격 및 보유대수를 결정하는 방법을 제안했다. 아울러 실제 서울시에서 운행되고 있는 시내버스 노선에 대해 사례분석을 통해서 본 모형을 실제 적용해보고 기존의 운영비용과 비교하고 본 모형의 유효성을 검증할 예정이다.

  • PDF

A Study on the Traffic Assignment Considering Unsignalized Intersection Delay (비신호 교차로 지체를 반영한 통행배정 기초연구)

  • Park, Byung-Ho;Park, Sang-Hyuk;Hong, Yung-Sung;Kim, Jin-Sun
    • International Journal of Highway Engineering
    • /
    • v.12 no.2
    • /
    • pp.1-7
    • /
    • 2010
  • This study deals with the unsignalized intersection delay in the urban transportation demand forecasting. The objectives are to develop the unsignalized intersection delay models and to comparatively analyze the applicability of the above models. In pursuing the above, this study gives particular attentions to simulating by KHCS program and implementing the case study of Cheongju using EMME/2. The major findings are the followings. First, the 8 unsignalized intersection delay models were developed through 480 simulating results, which are all statistically significant. Second, the estimates by the unsignalized delay models were analyzed to be most fitted to the observed traffic volume data.

The Effects of Response Cost Technique in the Computer Training for the Mentally Retarded Person (정신지체인의 컴퓨터 교육에서 반응대가 기법의 효과)

  • Song, Mi-Kyung;Kang, Oh-Han
    • The Journal of Korean Association of Computer Education
    • /
    • v.5 no.4
    • /
    • pp.147-154
    • /
    • 2002
  • In this paper, we investigated the effects of response technique which uses free tokens in the computer training for the mentally retarded person. We set wrong line entering. wrong space number entering, wrong line-type designation and wrong cell merger as the target behaviors in the research. The experiment period of the research was 36 sessions altogether, and the period was divided into four steps such as basic period I. treatment period I, basic period II, and treatment period II. We also conducted a follow up experiment to identify whether the experiment's effect is still maintained two weeks after the experiment finished. We know that the response cost technique which uses free tokens to the mentally retarded person is efficient in the computer training.

  • PDF

A Study on Signal Control Algorithms using Internal Metering for an Oversaturated Network (내부 미터링을 이용한 과포화 네트워크 신호제어 알고리즘 연구)

  • Song, Myeong-Gyun;Lee, Yeong-In
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.6
    • /
    • pp.185-196
    • /
    • 2007
  • The aim of this research is to develop a signal control algorithm using internal metering to minimize total delay that vehicles go through, in case a network is oversaturated. To calculate total delay on the network, the authors first detect vehicles' arrivals and departures in the network through the detecting system, and chase the vehicles' flow in the links with a platoon dispersion model. Following these, the authors calculate the queue length in all the inks of the network through the chase of vehicles, deduce the stopped time delay, and finally convert the stopped time delay to the approach delay with a time-space diagram. Based on this calculated delay, an algorithm that calculates the level of the internal metering necessary to minimize the deduced approach delay is suggested. To verify effectiveness of this suggested algorithm, the authors also conduct simulation with the micro-simulator VISSIM. The result of the simulation shows that the average delay per vehicle is 82.3 sec/veh and this delay is lower than COSMOS (89.9sec/veh) and TOD (99.1sec/veh). It is concluded that this new signal control algorithm suggested in this paper is more effective in controlling an oversaturated network.