Asia-Pacific Journal of Business Venturing and Entrepreneurship
/
v.14
no.6
/
pp.119-130
/
2019
Although a well-established line of research has addressed the funding decision, the activities of investee startups to receive funding have been overlooked because prior research has been conduced from investor's point of view. In addition, funding does not result from one off decisions but from decision process with many stages. Moreover, the emphasis placed on specific investment criteria varies by different stages during the process. Therefore, understanding the initial funding of startups requires to analyze the strategic behaviors of startups throughout the entire funding decision process from first meeting with investors to funding success. This study investigates the initial funding process of startups, and the analysis is based on a case study of LetinAR one of the successful startups founded by students in South Korea. This study investigates how early start-ups were able to receive funding from startup's point of view, and the analysis is based on a case study of LetinAR, an augmented reality(AR) startup using Pin mirror technology. By adding "legitimacy building" stage that had not been addressed previously, we divided funding process into four stages: 1) legitimacy building, 2) familiarization, 3) screening, and 4) bargaining phase. We did not only analyze major criteria, but also strategic activities of startup at each stage. This study makes a contribution by helping us understand complicated process of funding and the successful strategic behavior of investor backed startups.
설계란 주어진 구속조건 하에서 어떤 목표를 달성해 나가는 일련의 과정이라고 할 수 있다. 이 과정은 여러번의 합성(synthesis), 분석(analysis) 그리고 의사결정 루프에 의해 이루어진다. 이 러한 개념설계 또는 설계초기 단계에서 사용될 수 있는 컴퓨터를 이용한 새로운 설계기법들과 앞 부분에서 설명된 솔리드 모델링과 같은 구체적 형상모델링 기법의 조화가 미래에 등장할 새로운 CAD 시스템의 기반을 이룰 것이다.
Korean Journal of Construction Engineering and Management
/
v.6
no.5
s.27
/
pp.89-101
/
2005
The early phase of construction projects, communication among the related participants has great influence on the further transaction of the projects. However, important decision making are made by the experience of the field managers in practice without the method for systematic analysis. For example, in building construction project, selection process for construction method has been executed by decision making of some architects dependent on their experience. As a result, there have been frequent construction method alterations during the construction process and delay of duration, addition of cost, etc have followed accordingly. The main reasons of such a mal-functional transaction are due to the absent of the reasonal procedure of decision making reflecting the characteristics of construction project. Therefore, there is a need for an supporting tool and production design for the selection of rational construction method. The objective of this study is to propose production design process and decision making model in relation to various influent factors at the early phase of construction projects. To achieve these objectives, this study 1)analyzes the prior theory about production design, 2)we have studied about selection process for optimal construction method through constraint analysis in structural works, 3)performs a case study to embody the problems of the production design, and 4)proposes a cooperative committee model for supporting production design by analyzing the results of case study and interviewing experts. It is anticipated that the effective tool of proposed model would be able to improve communication among the related participants and systematically accumulate data that might be used in similar construction projects.
Korean Journal of Construction Engineering and Management
/
v.5
no.1
s.17
/
pp.71-79
/
2004
In the stage of feasibility study of urban rehabilitation projects, the precise forecast of physical and environmental changes has great influence on the further transaction of the projects. However, various important decision makings are made by the experience and intuition of the person-in-charge in practice without the process and method for systematic and quantitative analysis. In spite of various qualitative influent factors on the projects, the feasibility studies are made by the result of economic analysis only, which often lead the projects to the crucial deficit. The main reasons of such a mal-functional transaction are due to the absence of the reasonal procedure of feasibility study and decision making reflecting the characteristics of urban rehabilitation projects. The objective of this paper is to propose feasibility study processes and decision making methods in relation to various influent factors on urban rehabilitation projects in the initial stage. The goal and process of every analysis stage and the pertinent factors and decision makings are analyzed and proposed through the survey of current research, a case study, interview with the professionals. The processes and methods are well applied to improve current problems of feasibility study of urban rehabilitation projects. In addition, the establishment of the analysis goal at three principal stage and a series of reasonable decision makings with pertinent factors to each stage will lead the project to more successful result than ever.
Korean Journal of Construction Engineering and Management
/
v.15
no.3
/
pp.113-119
/
2014
Recently, the demand on the practical application of life-cycle cost effectiveness for design and rehabilitation of structure is rapidly growing unprecedently in engineering practice. Accordingly, in the 21st century, it is almost obvious that life-cycle cost together with value engineering will become a new paradigm for all engineering decision problems in practice. However, in spite of impressive progress in the researches on the LCC, the most researches have only focused on the Deterministic or Probabilistic LCC analysis approach (Level-1 LCC Model) at design stage. Thus, the goal of this study is to develop a practical and realistic methodology for the Lifetime risk based Life-Cycle Cost (LCC)-effective optimum decision-making at design stage.
Asia-Pacific Journal of Business Venturing and Entrepreneurship
/
v.14
no.1
/
pp.33-46
/
2019
Even though Korea is strengthening the support for startups due to the limitations of growth policies focusing on large companies, the survival rate of startups is very low, so that there should be more efforts to increase the survival rate of startups. As the existing startup support institutions have provided only fragmentary supports to startups, it would be necessary to have the comprehensive support institutions. As an alternative, the accelerator providing the comprehensive support such as spatial support, education, mentoring, networking, seed investment, and connection for follow-up investment to the initial startups was legalized in Korea of 2016, based on the registration system. Currently, within less than two year from then, there have been much interest in it enough to have about 136 registered accelerators. In the United States, the accelerator was introduced more than ten years ago. In Korea, however, it is still in the initial stage, so that the researches or social consensus on the accelerator are not sufficient. Thus, this study aims to suggest the measures for the development of accelerator and the consensus on the decision making for the selection of accelerator of startups, by researching which parts are considered when startups in the accelerator stage select the accelerator. As a result of the empirical analysis, the factor that has the greatest influence on decision making factors when startup chooses an accelerator was the subsequent investment attraction. This can be explained to the accelerator as desired, considering the factor that the startup of the initial stage places the most importance on growth as investment. We hope that these research results will be sustainable in future research related to accelerators, in hopes that it will be useful for establishing accelerator policies for domestic startups and direction for revitalizing related industries.
Yeo, Donghoon;Jeong, Wooyong;Han, Seung Heon;Lee, Young Cheon
KSCE Journal of Civil and Environmental Engineering Research
/
v.29
no.3D
/
pp.381-389
/
2009
Korean government is investing 1.8 billion won on infrastructure and investment on PPP projects constitutes 16.3%. This phenomenon is to promote private investment as well as lessening government burdens of public budgeting. However, the only criterion to be considered is government financial status in selecting public or private highway investment projects. So systematic decision support model is required in choosing public or private highway investment projects. So, this paper suggests a systematic decision support model for deciding public or private highway investment at the early stage of project planning. Furthermore, this paper identifies key decision variables with respect to economic, politic, project management criterions based on the related literatures and feedbacks from experts. This paper analyzed 30 cases of government investment and PPP projects and got the survey result from highway specialists. As a result, this paper presents an interval with respect to economic criteria using mean and standard deviation and a logistic regression equation which can predict the possibility of PPP project. Through this study, decision maker of central or local government can decide public or PPP highway project more systematically and reasonably.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.329-332
/
2003
The Ministry of Construction and Transportation has estimated the reconsideration of economy in construction and the dullness of LCC forcast method which supports decision-marking in safety and maintenance of buildings. So, they have introduced LCC analysis method in steps of a feasibility study and design. Because of the introduction of LCC analysis process and method, it would be possible to make a logical decision from management maintenance, estimation, user point of view. In this study, it would bepossible to show a plan and alternative of design factors and structure in one building by using LCC analysis method and to compare and analyze the reduction of life circle cost bi the elapsed time.
Proceedings of the Korean Operations and Management Science Society Conference
/
2003.05a
/
pp.612-619
/
2003
실물옵션은 전통적인 경제성 평가기준의 하나인 순현재가치 분석법이 의사결정 과정에서 경영의 유연성을 무시함으로써 투자 혹은 자산의 가치를 낮게 평가하는 단점을 제거하고 이를 평가에 적절히 포함시킬 수 있다고 여겨지고 있어 새로운 평가방법으로 주목을 받고 있다. 특히, 정보기술(IT) 분야에서는 다음과 같은 이유 때문에 전통적인 현금흐름할인 방법이 효과적이지 못할 수 있다. (1) 우선, 정보통신 분야에서 대부분의 정보기술 기반 투자 프로젝트는 막대한 자본이 소요되기 때문에 기업들은 이를 피하기 위하여 단계적인 투자계획을 세우는 경우가 많다. (2) 또한, 초기 기반에 대한 투자의 주요한 혜택이 대부분 그 이후 단계의 투자에서 구현되기 때문에 성급한 초기투자에 대한 경제성 평가는 이후의 혜택을 무시할 가능성이 많아진다. (3) 마지막으로 초기의 투자 프로젝트에 참여하지 못하면, 이 후의 프로젝트에 참여하기 어렵기 때문에 미래의 혜택을 얻을 수 없게 된다. 이러한 여러 가지 이유로 이를 적절히 평가할 수 있는 실물옵션 평가방법이 선호된다. 본 연구에서는 정보통신 분야의 투자와 같은 대규모 프로젝트의 특징을 평가방법의 입장에서 살펴보고, 실물옵션 개념을 응용하여 이러한 투자 형태의 평가를 위한 모델을 개발하고 적용방법을 생각해본다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.