• Title/Summary/Keyword: 철도종합안전프로젝트

Search Result 3, Processing Time 0.02 seconds

A Study on the Application System of the Systems Engineering for the Railway Total Safety Project (철도종합안전프로젝트를 위한 시스템엔지니어링 적용 체계 연구)

  • Choi Yo-Chul;Cho Yun-Ok
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.4 s.35
    • /
    • pp.487-492
    • /
    • 2006
  • This paper presents the Case of Systems Engineering Application for the Railway Total-Safety Project. Key points to consider for project are: 1) Establish the SE Based-Project organization system, 2) Define the SE Activities, 3) Manage technically the SE Based-Project, etc. They were of much help that the Railway Total-Safety Project which were efficiently implemented and managed. As I take it, the Systems Engineering is very reasonable approach for the systematical and technical conduct of a project.

On the Project Management utilizing the Systems Engineering Management Plan in the Railroad Safety Technology R&D Program (철도종합안전기술개발사업에서 SEMP의 활용을 통한 프로젝트 관리방안)

  • Kim, Jae-Chul;Lee, Jae-Chon;Cho, Yun-Ok;Kim, Sang-Am;Han, Soon-Woo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1798-1805
    • /
    • 2010
  • The Railroad Safety Technology R&D Program has been supported by the Ministry of Land, Transport and Maritime Affairs. The Program consists of dozen or more projects and thus is quite complex, which requires effective project management. This paper is discussing how to effectively manage the railroad safety technology R&D program based on systems engineering management plan (SEMP). The key issues dealt in this paper include the SE management, requirements management, verification and validation, integrated data base management, and traceability management. To achieve the goal, we first defined an appropriate SE process to be adopted in the program and the result was documented in the systems engineering management plan. According to the process defined, we set up the environmental frame in database. Using the database and SEMP, each project of the program was verified with respect to the corresponding requirements utilizing the traceability. All these efforts were carried out using a computer-aided SE tool, which enables efficient management of complex database.

  • PDF