KSCE Journal of Civil and Environmental Engineering Research
/
v.43
no.5
/
pp.651-657
/
2023
Railroad alignment improvements and operating speed increase occupy considerable portion in recent railroad market. Developing countries have limitations to construction of new high speed railroads due to the burden of budgets and the lack of demands, and the projects of operating speed increase arepracticallyrecommended. Thisstudy developed the methodologyto provide the railroad alignment design alternatives and the costs by upgrading the "Intelligent Railroad Alignment Design Program (ei-Rail)" which has been used to obtain the alignment plans and construction costs for railroad construction projects. The program provides the cost for alignment improvement, design drafts and the effects of operating speed increase with the input of target improvement speed and the prevailing railroad alignment on the numerical map. It is then expected for the ei-Rail program to be used for the supporting tool for the railroad alignment improvement projects.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.24
no.5
/
pp.399-408
/
2006
Railroads have been developed as public transportation and made a great contribution to national economic growth. But after the mid-20th century, its qualities have been getting low because of focusing on the investment and development of cars and airplanes. Its role which is getting the excellent merits on the mass transportation, rapid transit, safety, state period, energy efficiency, and prevention of environmental pollution has been reconsidered. Elements of horizontal alignment are needed in the case where the existing railroad lines should be improved or moved. If its design drawing was lost or damaged, it is impossible to recover. It is not easy to repair for it as disasters. We must understand an existing railroad line to bring a function included a basic geography situation. In this study, we acquire, analyze, and process the digital images of the railroad and then reappear shape of three dimension. And we expect to be utilized to construct the facility information by extracting the alignment elements of existing railroad lines reversely.
KSCE Journal of Civil and Environmental Engineering Research
/
v.42
no.6
/
pp.837-842
/
2022
The "Intelligent Railroad Alignment Design Program (ei-Rail) developed in 2013 has been adopted in the planning and the evaluation/validation of design results of oversea railroad construction projects. Target countries of Korean railroad industries requires the operating speed increase with alignment improvement and the double tracking of prevailing single track railroads as well as new railroad construction. This study is to develop an additional module for double tracking project of prevailing single track railroads in the ei-Rail. The developed method is based on the geometrics of prevailing railroad, and the definition of planned project determines the project cost based on the unit cost by work type, and provides the draft design of double track. The module was validated with a oversea case. It is then expected for oversea railroad double tracking project more efficiently in planning and the evaluation of design results.
비선형 임계속도를 주행시험대를 이용하여 측정하였으며 비선형 임계속도가 관성에 의한 과도 현상이 아님을 확인하기 위하여 주행속도를 연속 그리고 불연속적으로 감가속 하면서 선형 및 비선형 임계속도를 측정하였다. 또한 차량의 안정성을 간편하게 예측할 때 대차모델만을 사용하던 종래의 방법이 타당한지 확인하였으며 차량의 임계속도와 응답주파수를 예측하기 위하여 산업체에서 사용되던 간편 식들의 정확성을 검토한 결과 다음의 결과를 도출할 수 있었다. (중략)
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.22
no.1
/
pp.63-71
/
2004
This research is to reconstruction of railway alignment using GPS data, an investigation is made on the method of optimum simplification for reduction of unnecessary linear data, improve the accuracy by using four simplification algorithms among the methods. By applying two measured of displacement between observed data and it's simplification methods have been evaluated. The results showed that the complexities of lines is not practical to investigate simplification algorithms, the Douglas-Peucker method produced a little displacement between observed data and it's simplification. Its by using the Douglas-Peucker method to observed linear GPS data in railway track, design elements of horizontal alignment have been calculated. Then we could know that obtain the good results fur reconstruction of alignment elements through the methods and algorithns of this study.
KSCE Journal of Civil and Environmental Engineering Research
/
v.35
no.2
/
pp.407-415
/
2015
The railway route and alignment planning have been executed with a limited number of alternatives based on the site pre-survey and the topographic map. This study developed an intelligent railway alignment planning program (ei-Rail) which can derive all the considerable design alternatives and provide the data for the alternative evaluation such as constructions cost, operation cost, and etc. According to the comparisons with prevailing planned railway projects, the time and cost for planning can be reduced as well as the construction costs. This program may contribute to the development of railway industry by reducing the time and cost for planning as well as the total project cost.
Park, Chan-Bae;Lee, Byung-Song;Lee, Hyung-Woo;Kim, Nam-Po;Han, Kyung-Hee
Proceedings of the KIEE Conference
/
2009.07a
/
pp.1193_1194
/
2009
일반적으로 자기부상열차는 고속, 내구성, 안전성 등을 만족하는 가장 적합한 시스템 중 하나로 부각되고 있다. 300[km/h] 이하의 중저속 자기부상철도의 경우, 추진용으로 선형유도전동기가 사용되고 있으며, 초고속 자기부상철도의 경우, 선형유도전동기보다 고효율, 고출력의 특성을 가지는 선형동기전동기가 사용되고 있다. 한국철도기술연구원에서는 2008년도부터 700[km/h]급 초고속튜브열차용 선형동기전동기연구를 시작하였으며, 추진/부상 일체형 권선형 선형동기전동기연구를 수행하고 있다. 따라서 본 논문에서는 초고속튜브열차용 선형동기전동기 연구의 일환으로, 축소형 영구자석형 선형동기전동기(PM-LSM)의 수학적 방법에 의한 기본설계를 수행하였으며, 이를 이동자만을 고려한 자기등가회로법을 이용하여 권선형 선형동기전동기(EM-LSM)로 변환 설계를 수행하였다. 또한 설계된 PM-LSM과 EM-LSM 모델의 FEM 해석을 이용한 특성 분석을 통하여 본 논문에서 제안한 변환 설계기법의 정확도 검증 연구를 수행하였다.
KSCE Journal of Civil and Environmental Engineering Research
/
v.35
no.1
/
pp.165-172
/
2015
The appropriateness of railway route design is generally evaluated by the future value corresponding to the travel demand or benefit-cost analysis. These methods may have the limitation for the reasons that all the design alternatives cannot be considered, and the differentiation between the alternatives may not be significant because the alternatives are based on the strict basic scheme such as the design criteria. In addition, the cost varies by the design elements. In this study, all the design alternatives are considered with the automatized tool and the design criteria, and evaluated with the multi-criterion decision making method. The weight for each design element with the analytic hierarchical process may be helpful to derive more efficient railway alignment.
Seo, Sung-Il;Mun, Hyung-Seok;Lee, Jin-Ho;Kim, Jin-Ha
Journal of the Korean Society for Railway
/
v.17
no.6
/
pp.397-401
/
2014
In order to rationally design a new conceptual submerged floating railway, prediction of wave forces applied to the structure is very important. In this paper, equations to calculate such forces based on hydrodynamic theories were proposed and model tests were carried out. Inertia forces and drag forces, calculated using Morison's equation and the linear small amplitude wave theory, were in good agreement with the results from model tests conducted in a wave making tank. Drag forces were negligible compared with inertia forces. Also, wave forces showed linear variation with the changing wave heights. It was revealed that the linear wave theory and Morison's equation can give a simple and useful solution for the prediction of wave forces in the initial design stage of a submerged floating railway.
Kim, Hyun Ki;Kim, Sung Jin;Choi, Chan Yong;Hwang, Soo Beom
Journal of the Korean Society for Railway
/
v.17
no.2
/
pp.106-113
/
2014
In this study, a practical evaluation technique to detect the deterioration of railroad lines by means of train performance and track geometry measures is suggested. A train that has a specific performance and is running the straight line can make minimum travel time (ideal time). But the actual travel time will be increased by the track geometry and various speed limitations. By comparing these travel times, we can easily define the degree of line deterioration. This method does not require complex vehicle performance measures and/or specifications that exceed those of typical Train Performance Simulations (TPS). For this reason, ease of use is ensured and the results are similar to those obtained by running a TPS for practical evaluations.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.