A Study on Behavior of Post-integrated Abutment Bridge When Abutment and Bridge Decks are Jammed (교대 협착 발생 시 무조인트화 교량의 거동 분석 연구)

  • Park, Yang Heum;Nam, Moon S.;Jang, Il Young
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.3
    • /
    • pp.31-35
    • /
    • 2021
  • The expansion joints installed on the bridge for the accommodation of expansion and contraction of the supper structure are essential members of the bridge. However, the expansion joints are deteriorated over time and the waterproof function weakens, causing rainwater to penetrate and deteriorate the structure. In order to solve the traffic congestion caused by frequent replacement of the old expansion joints along with the deterioration of the structure, a post-integrated abutment bridge in which the existing expansion joints are removed and replaced with reinforced concrete link connection has been applied to highway bridges since 2016. After the post-integrated abutment method was applied, it was partially applied to bridges in which the superstructure and abutment were jammed. In this study, the causes of problems that may occur when the post-integrated abutment method is applied to the jammed bridge were analyzed numerically. It was analyzed that damage occurred in the link connection part. Based on the results of this study, the application condition for the post-integrated abutment method is reinforced as it is not possible to apply the post-integrated abutment method to bridges are already jammed.

Constructability Evaluation of Seismic Mechanical Splice for Slurry Wall Joint Consisting of Steel Tube and Headed Bars (슬러리월의 내진설계를 위한 강재각관과 확대머리 철근으로 구성된 기계적 이음의 시공성 평가)

  • Park, Soon-Jeon;Kim, Dae-Young;Lim, In-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.3
    • /
    • pp.295-303
    • /
    • 2023
  • South Korea has recently witnessed an increasing number of seismic events, leading to a surge in studies focusing on seismic earth pressures, as well as the attributes of geological layers and ground where foundations are established. Consequently, earthquake-resistant design has become imperative to ensure the safety of subterranean structures. The slurry wall method, due to its superior wall rigidity, excellent water resistance, and minimal noise and vibration, is often employed in constructing high-rise buildings in urban areas. However, given the separation between panels that constitute the wall, slurry walls possess limited resistance to seismic loads in the longitudinal direction. As a solution, several studies have probed into the possibility of interconnecting slurry wall panels to augment their seismic performance. In this research, we developed and evaluated a method for linking slurry wall panels using mechanical joints, including concrete-confined steel pipes and headed bars, through mock-up tests. We also assessed the constructability of the suggested method and compared it with other analogous methods. Any challenges identified during the mock-up test were discussed to guide future research in resolving them. The results of this study aid in enhancing the seismic performance of slurry walls through the development of an interconnected panel method. Further research can build on these findings to address the identified issues and improve the efficacy and reliability of the proposed method.

Fatigue Performance of Precast Decks using Ribbed Loop Joints in a Two-Girder Continuous Composite Bridge (2거더 연속합성형교 요철형 루프이음 프리캐스트 바닥판의 피로성능)

  • Lee, Han-Joo;Yeo, Woon-Young;Shin, Dong-Ho;Kim, In-Gyu;Park, Se-Jin
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.1
    • /
    • pp.85-93
    • /
    • 2019
  • Structural performance and serviceability of precast deck system are mostly determined by connection details between precast decks. Particularly, since the bridge deck is under repeated loads such as traffic loads, fatigue behavior and performance of joints should be investigated. In this study, a two-girder continuous composite bridge specimen was fabricated using the asymmetric ribbed loop joints, and static and fatigue load tests were conducted to evaluate the structural behavior and the crack pattern of the bridge deck. From the test results, the proposed precast deck system resulted in sufficient fatigue performance and failure strength. Therefore, the proposed precast deck system can be applied to the connection part of precast decks effectively.

Estimation of production length of PC beam by using splice length of bottom rebar (하부철근 이음길이에 따른 PC 보 제작 길이 산정)

  • Sung, Soojin;Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.84-85
    • /
    • 2014
  • Green frame is column-beam structure composed of precast concrete members. Based on Revision of Structural Concrete Design Code, the bottom rebar of beam shall be extend at least 150mm into the support member. However, if the bottom rebar extend to satisfy Revision of Structural Concrete Design Code, the installation fo beam is impossible due to interference between the columns and beams. Thus, the aim of this study is estimation of production length of precast concrete beam by using splice length of bottom rebar. In this study to solve this problem, lap splice were used on the join. This study was calculated length of the reinforcement by the diameter. According to the length of the rebar, the production length of beam concrete was calculated. The results of this study will satisfy the Revision of Structural Concrete Design Code about column-beam connection when green frame will be applied.

  • PDF

Seismic Retrofit of RC Columns with Lap-Spliced Longitudinal Rebars Wrapping by SMA Wires (SMA Wire를 이용한 주철근 겹침이음된 RC 교각의 내진 보강 연구)

  • Park, Yong-Kwon;Lee, Yeon-Hun;Yang, Dong-Wook;Lim, Hyeon-Sik;Chung, Young-Soo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.129-130
    • /
    • 2010
  • Lap splice of longitudinal reinforcing steels was located in the plastic hinge region of most bridge piers that had been designed and constructed before the adoption of the 1992 seismic design provision of Korea Highway Design Specification. This research aims at improving the seismic performance of reinforced concrete bridge piers with lap-spliced longitudinal steels, of which the plastic hinge region was wrapped by the shape memory alloy (SMA) wires. Quasi-static test was used to investigate the seismic behaviours of RC test specimens.

  • PDF

Failure Risk Assessment of Reinforced Concrete Sewer Pipes on Joint-Related Defects (원심력철근콘크리트관의 결함에 따른 심각도 평가 -이음부 사례를 중심으로-)

  • Han, Sangjong;Shin, Hyunjun;Hwang, Hwankook
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.6
    • /
    • pp.787-796
    • /
    • 2013
  • Sewer joint-related defect is one of the most common domestic sewer defects along with the lateral pipe problem. However, there are currently no criteria that precisely assess the joint-related sewer defects. Therefore, this study examined the joint-related sewer defects found in domestic circumstances, classified them according to the suggested defect code, and presented the examples of defect pictures. Each defect code was organized as the process of out of pipeline alignment (OPA) which shows the progress in deterioration. Each defect was classified into 5 grades depending on appropriate repair and rehabilitation method. The result of this study is expected to be useful for domestic CCTV inspectors to assess the sewer condition and helpful for managers to make a decision of repair and rehabilitation.

Analytical Study on Splice Performances with the Vertical Noncontact Lapped of Reinforcing Bars (수직으로 비접촉 겹침이음된 철근의 이음성능에 관한 해석적 연구)

  • Lee Ho-Jin;Kim Seung-Hun;Ha Sang-Su;Moon Jeong-Ho;Lee Li-Hyung;Lee Yong-Taeg
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.05a
    • /
    • pp.171-174
    • /
    • 2005
  • In this study, new moment-resisting precast concrete beam-column joint is proposed for moderate seismic regions. It has the connection reinforcing bars, penetrated the joint and lap-spliced with the bottom bars of precast U-beam. To evaluate the performance for noncontact lapped splice, analytical works were conducted. Major variables for FEM analysis are the length of lap, the diameter of connection reinforcing bars, and the distance between lapped bars. The results of this study show thar the these variables has much influence on strength and deformation of lapped joint.

  • PDF

Evaluation on Structural Performance of Joint with Asymmetric Ribbed Connection Details used in Precast Bridge Deck (비대칭 격벽단면을 갖는 프리캐스트 바닥판 이음부의 구조성능 평가)

  • Chung, Chul-Hun;Byun, Tae-Kwan;Kim, In-Gyu;Shin, Dong-Ho;Lee, Han-Joo
    • Journal of the Korea Concrete Institute
    • /
    • v.29 no.2
    • /
    • pp.159-167
    • /
    • 2017
  • A precast concrete deck system is considered an effective alternative in terms of its rapid construction and quality assurance than cast-in-place concrete deck. In precast concrete deck system, structural performance and serviceability are mostly determined by the connection methods between the precast decks. This research proposes more improved precast deck system with asymmetric ribbed connection details improving the disadvantage of previous precast deck system such as difficulties in assembling precast decks. And in this precast deck system, a separate form is not required at the site because partition wall of the precast decks serves as a form when placing non-shrinkage mortar in the connection part of the precast decks. Therefore, rapid construction is possible. Flexural performance is verified through load tests considering main parameter such as rib length in the precast deck connection. From the test results, it can be inferred that the development of the rebar and prevention of adhesion failure in the partition wall of the precast deck system are important factors in securing the flexural performance. Although the structural performance of the precast deck system with asymmetric connection details is gradually reduced as the rib length in the precast deck connection increases, the proposed precast deck system shows sufficient flexural performance and can be applied to the connection part of precast decks effectively.

Experimental Study on the Precast Concrete Joint using Re-bar Debonding and Cutting Technique (철근 비부착 및 절단 기법을 사용한 PC 접합부의 실험적 연구)

  • Yi, Waon-Ho;Moon, Jung-Ho;Lee, Yong-Jae;Lee, Han-Jun
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.2 no.4 s.7
    • /
    • pp.131-141
    • /
    • 2002
  • Precast concrete (PC) panels are often used as retaining walls to support soil pressure. In such a case, the panels should be connected at the location where PC panels meet with a buttress. However, it is not easy to provide enough development length for the reinforcing steels due to the limited width of the buttress. If it happens, the width of buttress should be increased as large enough although it is not desirable. The critical section required for providing the development length is always located where the flexural moment is maximum. Thus it is the place the buttress width ends. Also it is the place that the reinforcing steels stressed to maximum. However, it is possible to make differentiate between the maximum moment location and the most stressed location of reinforcing steels. It means that the most stressed location of reinforcing steels, the critical section, can be moved to the other place where the moment is not maximum. New critical location will have less moment than that of buttress width ends. In consequence, the development length would be longer than that of the typical way of construction. Debonding or cutting technique make it possible to reduce the moment strength of a section. Therefore reinforcing steels are debonded or cut to have a desired flexural strength at a desired place. In this study, five test specimens in full scale were erected to examine the effects of critical section movement in PC panel joints. Test parameters were the length variations of debonded and cut reinforcing steels. The test results showed that the debonding or cutting technique could be used to lengthen the development length in the joint of PC panels.

Analysis on Bond Characteristics of Reinforcements for UHPC Hybrid Cable-Stayed Bridge Deck Joints (초고성능 콘크리트 하이브리드 사장교 바닥판 접합부 철근의 부착 성능에 대한 해석)

  • Seonwoo, Yoon Ho;Park, Sung Kyun;Kwahk, Im Jong;Yoon, Young Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3A
    • /
    • pp.207-214
    • /
    • 2011
  • Ultra High Performance Concrete (UHPC), which is characterized by its high strength and advanced ductile behavior that is much superior to those of convention concrete, is a useful material to make thinner and longer bridges. The precast segmental construction method utilizing UHPC has been mainly studied because cast-in-place UHPC is very difficult and complicate to be achieved. As a part of those research, the structural performance evaluation of different types of joint connection method for hybrid cable-stayed bridge utilizing UHPC by using nonlinear analyses is performed in this study. The bond stress at joint is obtained by section force analyses for a 600 m cable-stayed bridge deck, and compared with the required bond stress at joint. Analysis results show that the U Type connection and straight type connection resist the highest ultimate load and bond strength, respectively. In addition, all considered joint connection systems satisfy the bond performances at joint required in the final stage of cable-stayed bridge utilizing UHPC.