• Title/Summary/Keyword: 철근시공공법

Search Result 137, Processing Time 0.026 seconds

Application Possibility of Folding Pre-fabricated Rebar Cage in Domestic Construction Fields (접이식 철근 선조립 공법의 적용 가능성 검토에 관한 연구)

  • Jung, Young-Chul;Lee, Byung-Yun;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.125-132
    • /
    • 2010
  • Recently, construction companies have had difficulty in managing their business due to economic hardship domestically and abroad, decreased orders, and low profitability due to intensified competition. To address these issues, construction companies need to develop or introduce construction methods that improve productivity. The purpose of this study is to investigate a re-bar construction method that reduces the high expenses of transport by folding a pre-fabricated re-bar cage. It was concluded that the application of rebar pre-fabrication would be activated and the productivity of construction sites improved by adopting the folding rebar pre-fabrication method.

Behavior Evaluation of Thin Bonded Continuously Reinforced Concrete Overlay on Aged Jointed Concrete Pavement(2) (노후 줄눈 콘크리트 포장 보수를 위한 얇은 연속 철근 콘크리트 덧씌우기 포장의 거동 평가(2))

  • Ryu, Sung-Woo;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.12 no.4
    • /
    • pp.101-110
    • /
    • 2010
  • In this paper, it has been studied about the CRCO to maintain or rehabilitate the aged JCP. The CRCO and JCO was constructed at useless section of Seo-Hae-Ahn express highway in South Korea. The performance evaluation was conducted. Especially, it was focused on the roll of longitudinal reinforced steels inserted into the CRCO. On crack survey results from field construction section, the reflection cracks at joint of the existing pavement occurred in CRCO. However, due to the constraints of longitudinal reinforced steels, crack width was small. Total crack length and quantity in the CRCO more than that in the JCO. And crack spacing in the CRCO was narrower than it in the CRCP. Through the bonding strength test results, if the cold milling and cleaning as well as surface treatment is applied, there will be no debonding problem at interlayer in the early age. From analysis of the horizontal behavior at the joint, the longitudinal reinforced steels constrained crack width which became wider than initial state over time. Also, that steel in the CRCO reduced the horizontal movement due to temperature variation(4 times than that in the JCO). But, if interface is debonded, the roll decreased. Vertical VWG data showed that CRCO did not occur debonding problem at steel location, but there was some problem in JCO. It was confirmed by field coring. The tensile strain appeared in the CRCO, But the compressive strain occurred in the JCO in early age. Through the FWD test result, deflection in the CRCO was less than that in the JCO. And K value in the CRCO was greater than it in the JCO.

Design, Construction and Performance of A Removable Soil Nailing System (제거식 쏘일 네일링 공법의 설계 및 시공)

  • Kim, Hong-Taek;Ryu, Jeong-Soo;Jung, Sung-Pill;Kang, In-Kyu;Park, Si-Sam
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.3
    • /
    • pp.107-117
    • /
    • 2000
  • 쏘일네일 벽체는 국낸에서 과거 10년간 가시설 및 영구구조물에 상당수 시공되어 왔다. 그러나 쏘일네일링 공법은 많은 장점이 있음에도 불구하고 인접한 건물의 하부에 쏘일네일이 삽입되는 것을 허용하지 않아 제한적으로 사용되고 있는 실정이다. 따라서 본 논문에서는 쏘일네일이 인접한 건물의 하부에 삽입되는 문제를 해결하고 철근을 재활용할 수 있는 방안으로 제거식 쏘일네일링 공법을 소개하였다. 제서식 쏘일네일링 공법은 연직굴착시 가시설 흙막이벽체로 주로 사용할 수 있다. 제거식 쏘일네일의 인발특성을 규명하기 위해 총 23회의 현장인발실험을 실시하였으며, 이를 통해 고정자 소켓의 설치간격과 시멘트 그라우트의 W/C 비가 중요한 설계인자라는 것을 알 수 있었다. 또한 본 논문에서는 국내에서 처음으로 시공되는 제거식 쏘일네일 벽체의 설계 및 시공과 시공상태 등을 소개하였으며, 제거식 쏘일네일의 철근을 제거하기 전과 후에 벽체의 변형을 계측자료로부터 분석하였다.

  • PDF

Fire Resistance Property of RC Structure Member Strengthened with Fiber Sheet (섬유시트로 보강된 철근 콘크리트 구조부재의 방ㆍ내화성능)

  • 이한승
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.2
    • /
    • pp.45-50
    • /
    • 2002
  • 근년, 철근 콘크리트조 구조부재의 열화 및 건축물의 용도변경에 따라 건축물의 보수 및 보강에 관한 공법의 개발 및 그 효과를 검증하려는 연구가 활발히 진행되고 있다. 이에 따라, 보강공법으로서는 경제성ㆍ시공성 면에서 우수한 탄소섬유시트, 아라미드섬유 시트, 유리섬유시트 보강공법 및 FRP판 보강공법 등 합성수지 접착제를 사용하는 새로운 보강공법들이 폭넓게 연구되어 현장 실용화되어 사용 중에 있다. 그러나, 이들 보강공법에 관한 연구는 주로 구조적인 내력 보강효과 산정에 관한 것이 대부분이고 보강후의 내화성능 및 내구성능에 관한 연구는 매우 부족한 실정이다. 이들 보강공법은 주로 에폭시수지계 접착제에 의하여 콘크리트와 보강재의 접착력에 의하여 내력이 전달되는 메커니즘으로 되어있어 화재가 발생한 경우 내화피복이 없다면 접착제 자체의 연소에 의하여 유독가스의 발생 및 접착강도가 크게 저하되어 그 구조적인 보강성능은 급속히 저하할 것으로 판단된다. 또한, 현재 이들 보강공사는 내화성능의 검토 없이 실제 시공이 이루어지고 있으므로 화재시에는 대형참사를 일으킬 위험성이 있다.(중략)

A Case Study on Explosive Demolition of a Industrial Plant Foundation (산업용 플랜트 기초의 발파해체 시공사례)

  • Noh, You-Song;Kim, Nae-Hoi;Jang, Seong-Ok;Suk, Chul-Gi;Park, Hoon
    • Explosives and Blasting
    • /
    • v.39 no.1
    • /
    • pp.22-35
    • /
    • 2021
  • The number of a industrial plant that must be demolished due to functional and structural deterioration has been increased. There is an increasing application of explosive demolition or explosive demolition combined with mechanical demolition to minimize temporal and spatial environmental hazardous factors created during the process of demolition. In this case study, to demolish the industrial plant foundation, which is a reinforced concrete structure, the explosive demolition technique was conducted. As a result of the explosive demolition, the overall crushing of plant foundation structure was satisfactory, and the explosive demolition was completed without causing any damage to surrounding facilities.

A Study on the Economical Analysis of the Composite Precast Concrete Method (프리캐스트 콘크리트 복합화공법의 경제성 분석에 관한 연구)

  • Yoo, Dae-Ho;Lee, Han-Bok;Ahn, Jae-Cheol;Kang, Byeung-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.113-118
    • /
    • 2007
  • In this study, we select a site adopting real composite precast concrete method. Estimating real construction cost and imaginary cost appling reinforced concrete method in the site, we compare the costs. Through using high intensity concrete and prestressed concrete, amount of concrete is reduced more than 50% but there isn't big gap in material cost. In the main construction cost of composite precast concrete method, the material cost with production cost and transportation cost are in that, joints and topping concrete are account for 90%. But in case of reinforced concrete, labor cost spent at concrete steel bar and form is account for 30%. In the cost of attached, compared with composite precast concrete method, the reinforced concrete method taken in big portion by temporary work and scaffolding is twice as much as composite precast concrete method in construction cost. Therefore, economic efficiency is excellent reducing 11% total cost of composite precast concrete method from the reinforced concrete method.

  • PDF

Modeling of Precast Concrete Shear Walls BIM Program (BIM 프로그램을 이용한 프리캐스트 콘크리트 전단벽의 모델링)

  • Mun, Ju-Hyun;Yoon, Hyun-Sub;Kim, Jong-Won;Eom, Byung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.451-462
    • /
    • 2022
  • The objective of the study is to establish a BIM modeling of precast concrete(PC) shear wall with various wall-to-base connections. The family library of PC shear wall was established in BIM program using component function in a IFC(Industry foundation classes) file format and SketchUp program. From the BIM program, the amounts of concrete, reinforcing bars and steel materials as well as the interference of arranged reinforcing bars can be accurately evaluated in the PC shear walls with spliced sleeves, bolt, or welding plate connection methods. Although the additional metallic materials such as steel plates, bolts, and nuts were used in the PC shear walls with welding plate connection method, their amounts of materials, economic efficiency, and environmental impact were similar to those with spliced sleeve connection. Consequently, the bolt or welding connection is a highly applicable method as wall-to-base connection of PC shear walls, and it was a more useful method than spliced sleeve method, particularly considering the constructability.

A Study on the Development of Evaluation Method of Repair Performance for the Repair Method of Reinforced Concrete Structures (철근콘크리트구조물 보수공법의 성능평가 방법 개발에 관한 연구)

  • Kim Yong-Ro;Kim Hyo-Rak;Lee Do-Bum;Kim Moo-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.203-206
    • /
    • 2005
  • The purpose of this study is to develop the evaluation method of repair performance for the repair method of reinforced concrete structures deteriorated due to combined deterioration, its results are summarized as the follows. After investigating and analyzing the experimental data of this study and existing research, it is proposed the evaluation method on the repair performance for the repair method of reinforced concrete structures using evaluation method of reinforcing corrosion by combined deterioration accelerated test.

  • PDF

A Study on probability of rebar corrosion After repair method of carbonated existing RC structures (탄산화가 진행된 기존 RC구조물의 보수공법 적용후 철근의 부식확률 평가에 관한 연구)

  • Lee, Hyung-Min;Kim, Sang-Youl;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.32-33
    • /
    • 2015
  • As the importance of maintenance of reinforced concrete structure recently has emerged, the attention of durability of structure has been increasing. There are many studies about durability decline especially due to the carbonation. In order to study carbonation progress after surface repair of carbonated concrete, each carbonation penetration velocity from different repair materials of concrete structure is compared through the experiment of carbonation accelerating CO2 concentration to 100%. As carbonation infiltration progress is predicted through this study, the counterplan of service life evaluation will be prepared on selection of repair materials of concrete structure.

  • PDF

The Comparison of Work Time between Field Fabrication Method and Partial Prefabrication Method of Rebar work (벽체철근 일반조립과 부분 선조립 공법의 작업시간 비교에 관한 연구)

  • Kim, Young-Kil;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.12-13
    • /
    • 2018
  • Reinforced concrete works account for 40 to 50 percent of the total construction work. However, the shortage of construction workers is a problem in the delay of the construction period of reinforced concrete. The partial rebar prefabrication is one of the ways to shorten construction period. Thus, this study compared the partial rebar prefabrication and field fabrication method through work sampling. As a result, the partial rebar prefabrication showed a significant decrease in time compared to field fabrication method. As a result of this study, it is expected to be used as a reference for the efficient selection of reinforced concrete methods.

  • PDF