• Title/Summary/Keyword: 천공속도

Search Result 55, Processing Time 0.023 seconds

Assessment of Rock Mass Properties Ahead of Tunnel Face Using Drill Performance Parameters (천공데이터를 활용한 터널 막장 전방 암반특성 평가)

  • Kim, Kwang-Yeom;Kim, Chang-Yong;Chang, Soo-Ho;Seo, Kyeong-Won;Lee, Seung-Do
    • Explosives and Blasting
    • /
    • v.25 no.1
    • /
    • pp.67-77
    • /
    • 2007
  • The drill monitoring data are useful for the detection of abrupt and unexpected changes in ground renditions. This paper introduces a new approach to how drill performance parameters can be used for the prediction of quantitative rock mass properties ahead of tunnel face and the blasting design. The drill monitoring parameters available for the predictions include the instantaneous advance speed, thrust force, torque, tool pressure and penetration rate. The assessment of the drill monitoring parameters will be able to build a database provided that in-situ drill monitoring informations are accumulated and enable us to make a reasonable blast design based on quantitative assessment of rock mass.

Prediction of Geological Condition Ahead of Tunnel Face Using Hydraulic Drilling Data (유압 천공데이터를 이용한 터널 굴진면 전방 지질상태 예측)

  • Kim, Kwang-Yeom;Kim, Chang-Yong;Kim, Kwang-Sik;Yim, Sung-Bin;Seo, Kyoung-Won
    • The Journal of Engineering Geology
    • /
    • v.19 no.4
    • /
    • pp.483-492
    • /
    • 2009
  • During construction of a tunnel and underground structure, it is very important to acquire accurate information of the rock mass will be excavated. In this study, the drill monitoring method was applied for rapid prediction of geological condition ahead of the tunnel face. Mechanical data(speed, torque and feed pressure) from drilling process using a hydraulic drilling machine were analyzed to assess rock mass characteristics. Rock mass information acquired during excavation from drilling monitoring were compared with results from horizontal boring and tunnel seismic profiling(TSP). As the result, the drilling monitoring method is useful to assess rock mass condition such as geological structures and physical properties ahead of the tunnel face.

Studies on the aeration improvement of inner bottle(1100ml) culture system during the mycelial culture of Pleurotus ostreatus (느타리(1100㎖병)의 균사 배양 중 배양기 내부 통기성 개선)

  • Yoo, Young-Jin;Shim, Kyu-Kwang;Koo, Chang-Duck;Kim, Myung-Koon
    • Journal of Mushroom
    • /
    • v.10 no.2
    • /
    • pp.68-73
    • /
    • 2012
  • The plastic culture bottle cap types and accumulated concentration of carbon dioxide, media humidity in the process of medium culture and yield were observed in Pleurotus ostreatus 1,100ml bottle in Iksan, Jeollabuk-do, Korea, during 2011. The concentration of carbon dioxide in the process of medium culture was the highest after 6~11days cultivation irrespective of cap sizes and types. The upper-under 19~38mm perforation hole and under 26~47mm perforation hole of caps in the 1,100ml bottle were best condition for cultivation of mushroom and increased fruit body, 11.4~23.8% and 6.5~17.9%, respectively. However, the upper-under 33mm perforation hole of fruit body were decreased 23.8%. Also it was weak, lose vitality and the lower of biologically activity substance because the upper medium humidity was too dry.

Punching System for Plastic Mulching at Soybean Field - Effect of Punching Knife Shape on the Cutting Performance (비닐 천공 시스템 개발 - 칼날 형상이 천공 성능에 미치는 영향)

  • Hong, Sungha;Choi, Ahnryul;Lee, Kyouseung
    • Journal of agriculture & life science
    • /
    • v.50 no.5
    • /
    • pp.217-224
    • /
    • 2016
  • In this study, performance of a developed automatic punching machine considering the planting density of soybeans was evaluated in the case of the operation speed of 0.18-0.28 m/s. The performance demonstrated a rate of 320-500 ㎡/h, 260-400 ㎡/h, and 210-330 ㎡/h for the 0.20 m, 0.25 m, and 0.30 m soybean planting density, respectively. One hundred percent punching capacity was confirmed in 30 mm distance between the ground and the blade. Additionally, in the 50 mm distance condition, the performance of round, square, and hexagonal blades were observed in the range of 16.7-25.2%, 33.0-42.3%, and 54.5-100.0%, respectively. Above all, the hexagonal blade with a 60° edge angle had the most superior cutting quality demonstrating a smooth and soft cutting plane of the plastic.

A Study on Notch Bit System for Controlling Blast Vibration and Over-break in Rock Mass (발파공해 해소 및 여굴 최소화를 위한 선균열 암굴착 노치장비 개발에 관한 연구)

  • Jeong, Dong-Ho;Moon, Sang-Jo;An, Dae-Jin;Jeong, Won-Joon;Kim, Eun-Kwan;Kim, Dong-Gyou
    • Tunnel and Underground Space
    • /
    • v.17 no.3 s.68
    • /
    • pp.216-224
    • /
    • 2007
  • Blasting, using shock and dynamic energy of explosive, is very effective tunnel excavation method. But it had serious problem which is the blast vibration and over-break. In recent study, pre-cracked excavation method using notch hole reduced blast vibration and over-break in tunnel, so we performed study about developing notch bit system for making notch hole. In order to make notch hole effectively we had perform drilling experiments changing length and height of notch and in order to improve speed and precision of drilling we had developed notch bit system which consists of drilling bit, notch bit, adapter and notch guide.

Evaluation of a Drill Bit Button Arrangement for Enhanced Drilling Efficiency (천공 효율 향상을 위한 드릴비트 버튼배열 성능평가 방법)

  • Kang, Hoon;Cho, Jung Woo;Jeong, Myeong Sik;Cho, Yong Jae;Lee, Sang Kon;Lee, Jae Wook
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.39 no.6
    • /
    • pp.575-581
    • /
    • 2015
  • The drill bit, which directly transmits percussive forces and torque to the rock, is the core part of a rock drilling machine. For effective drilling, the button arrangement of a drill bit should be optimized because it is the most important design factor in determining drilling efficiency. Furthermore, a quantitative method is necessary to evaluate the button arrangement for the optimization of the drill bit button. Therefore, we propose a new method for the evaluation of the drill bit button arrangement using new evaluation indices, which include the overlapped impact area, blank area, and moment. Moreover, we verify the suitability of the proposed evaluation method by applying it to the conventional button arrangement.

Estimation of the Mechanical Properties of the Concrete Tunnel Lining by Drilling Resistance Test (천공저항시험에 의한 콘크리트 터널라이닝의 역학적 특성 추정)

  • Choi, Soon-Wook;Sung, Yun-Chang;Cheong, Ho-Seop;Chang, Soo-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.11
    • /
    • pp.87-98
    • /
    • 2007
  • For the quick rehabilitation of a fire-damaged tunnel structure, it is the most important procedure to investigate the fire-induced damaged zone rapidly. This study aims to propose a new drilling resistance testing method by which mechanical properties of tunnel concrete lining altered by high temperature can be estimated easily and continuously. Especially, it alms to derive the relationships to estimate mechanical properties of mortar and concrete materials from drilling parameters. To obtain the optimum testing condition, a series of drilling resistance tests were carried out for mortar specimens. When the rotation per minute of drill bit, tile penetration rate and the bit diameter were 1,300 rpm, 1.40 mm/sec, and 10 mm respectively, the deviation of measured drilling resistance forces was minimal. Under the optimum testing condition, the relationships between drilling resistance and mechanical properties of mortar specimens were shown to be very favorable. The concept of replacing a mean value of resistance farces measured during drilling with the resistance energy was proposed to consider the effects of randomly distributed aggregates inside a concrete material on drilling resistance. When the concept was applied to concrete materials, a favorable relationship between actual compressive strength and drilling resistance energy was also successfully derived.

Extracorporeal Shock-wave Therapy after Multiple Drilling as a Treatment for Chronic Calcific Tendinitis - An Analysis of Outcome Following Different Levels of Energy (만성 석회화 건염에 대한 다발성 천공술 후 추가적으로 시행한 체외 충격파 치료의 에너지 수준에 따른 결과분석)

  • Noh, Gyu Cheol;Jang, Keun Jong
    • The Journal of Korean Orthopaedic Ultrasound Society
    • /
    • v.5 no.2
    • /
    • pp.66-74
    • /
    • 2012
  • Purpose: To compare the outcome of two methods of chronic calcific tendinitis (CCT) treatment, Multiple drilling alone versus combined drilling and extracorporeal shock-wave therapy (ESWT). Furthermore, to analyze the clinical and radiologic results of different energy level configurations of ESWT. Materials and Methods: Among the patients complaining shoulder pain who visited the clinic from June 2010 to August 2011, 98 were diagnosed with CCT of the supraspinatus and were divided into the following three groups. Multiple drilling alone (n=31), Multiple drilling followed by high-energy ESWT (n=31), Multiple drilling followed by low-energy ESWT (n=36). The study was conducted only with patients with chronic pain persisting longer than six months despite prolonged conservative therapy. Clinical evaluation was done before and after 12 weeks from treatment, in clinical terms using the ASES, KSS, CSS system reflecting performance and symptom improvement, and in radiologic terms by studying the change in size of the calcific nodules. Results: All of three groups showed effects for improvement of clinical function and decrease of calcification and clinical improvement was significantly high in comparison between the group fulfilled by only multiple needling (the third group) and the group fulfilled by additional ESWT (the first and second groups) and in the radiological evaluation, calcification size and the rate of calcification decrease showed significant improvement statistically. For the comparison among the groups, degree of clinical function improvement and rate of calcification decrease showed significant difference between high energy group (the first group) and multiple needling group (the third group) as well as low energy group (the second group) and multiple needling group (the third group). But, in comparison between high energy group (the first group) and low energy group (the second group), there was no significant difference for the degree of clinical function improvement and rate of calcification decrease. Conclusion: For the treatment of chronic calcific tendinitis, additional ESWT showed more superior effects on clinical function improvement and radiological improvement regardless of the energy standard rather than the exclusive fulfillment of needling. But, as the result of ESWT by the energy standard, there was no significant difference for the decrease of calcification and degree of clinical function improvement.

  • PDF

A Study on the Safe Blast Design to Increase Slope Stability (발파진동이 사면에 미치는 영향과 안전설계에 관한 연구)

  • 안명석;류창하;박종남;권중남
    • Explosives and Blasting
    • /
    • v.19 no.1
    • /
    • pp.85-92
    • /
    • 2001
  • 본 논문에서는 암굴착시 발파에 의한 암반사면의 균열방지 및 사면안정 재고를 위하여 대 구-포항간 고속도로 건설현장에서 시험발파를 실시하고 그 결과를 분석하여 천공깊이별 안전 발파패턴을 제시하였다. 또한 현지 탄성파 속도를 측정하여 발파에 의해 암반에 미치는 균열상태를 조사한 결과 탄성파속도의 감소가 40 ∼ 53%로서 암반 중에 균열을 발생시킨 것으로 나타났다. 발파진동 계측결과를 분석하여 암반에 균열을 일으킬 수 있는 진동속도 기준을 설정하여 균열권 범위를 추정하였으며 사면의 기하학적 형상을 고려하여 손상대를 최소화 할 수 있는 적정 안전설계 패턴을 제시하였다.

  • PDF