• Title/Summary/Keyword: 창정비

Search Result 29, Processing Time 0.02 seconds

Mid-term Requirement of 'Elements of Depot Maintenance' draft (창정비요소 개발 과정정립을 통한 창정비요소개발 발전을 위한 제언)

  • Ahn, Jung-Jun;Kim, Jong-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.638-647
    • /
    • 2018
  • We have to prepare for the existing threats from North Korea and potential threats in the future. It is important to utilize our resources as effectively as possible to build military power that brings victory in a war. Based on a sustainable required operational capability, weapons systems at the acquisition stage need to maintain a combat-readiness posture and ensure operational sustainability. To achieve this, establishment of procedures that develop elements of depot maintenance at the beginning, which enables economical and effective depot maintenance during that stage, is essential. First, the requirement paper needs to develop the concept of the depot maintenance requirement through the pre-study outlined by this paper. Second, at the system development stage, a Development Plan of Depot Maintenance draft should be proposed. This is the initial paper that can develop the elements of depot maintenance, and it should be verified by a field test. Third, each force's logistics command should write a Depot Maintenance Direction draft and a Mid-term Requirement of Elements of Depot Maintenance draft with the proven Development Plan of Depot Maintenance draft. Also, the verified paper needs to be realized and renewed by the time the Requirement of Elements of Depot Maintenance draft is completed. In conclusion, the procedures explained above will contribute to build an economical and effective military power in a reality faced with a resource shortage and threats from the enemy.

한국의 방위산업 경영합리화 방안(3)

  • Choe, Dong-Cheol
    • Defense and Technology
    • /
    • no.6 s.292
    • /
    • pp.70-79
    • /
    • 2003
  • 군 정비창과 방산업체 어느 곳에서 창정비를 하는 것이 효율적인지 판단은 군수지원체제의 효율성, 가동률 향상측면, 경제성 등을 종합적으로 분석하여 결정할 사항이나, 무기체계를 생산하고 정비설비와 기술인력을 확보한 방산업체에서 수행하는 것이 여러 측면에서 효과적이고 바람직할 것으로 판단된다. 외국의 창정비 정책도 자국 소요를 위주로 하는 국가는 생산업체에서 담당하고 있다. 방산업체가 창정비를 하게 되면 생산량 감소에 따른 가동률 높일 수 있고, 창정비 활동을 통하여 핵심 기술인력을 유지하고 성능개량을 통한 기술력도 향상시킬 수 있을 것이다.

  • PDF

A Study on the Applying Improvement Method of Guide for efficient depot level maintenance (효율적인 창정비요소개발을 위한 지침 개선적용 연구)

  • Jeong, Inn-Sung;Kim, Hyeong-Do
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.12
    • /
    • pp.789-796
    • /
    • 2019
  • If the development of Integrated Logistics Support (ILS) for maintenance of the end step is conducted systematically and efficiently, the weapon system lifecycle can be postponed and the availability can be improved. DEFense CONdition (DEFCON) is maintained as perfect. Nevertheless, like its importance, the guide for maintaining the depot performance is applied differently for each weapon system. The errors that can result cause additional cost, etc. ILS development at depot level maintenance is different from full scale development. Therefore, this study distinguishes the management and deployment section for the development concept. An additional way to perform an efficient development of depot maintenance element when determining the depot maintenance period were presented. This study examined how the Reliability, Availability, Maintainability (RAM), Logistics Support Analysis (LSA), and ILS 11 elements intersect at the depot maintenance sources. An analytical study of concrete adoptable plans was performed. The systematic adoption of a development procedure can make it possible to calculate the adoptable development cost. In addition, it can be helpful for improving the quality level and practical use of work products.

F-15K 전투기 사업의 핵심 쟁점 사항

  • Im, Jong-Chun
    • Defense and Technology
    • /
    • no.7 s.281
    • /
    • pp.18-27
    • /
    • 2002
  • 차기 전투기 사업의 성과는 공군의 전력 증강이라는 기본적인 목표 달성이외에 부수적으로 달성한 절충교역 내용이 매우 중요하다. 절충교역 분야는 기술이전, 부품제작/수출, 창정비 등 크게 3가지 분야로 나뉘어 공군, 조달본부, 국방과학연구소, 국내 방산업체 등이 협상에 참여하였는데, 국익을 우선으로 하여 적극적으로 협상을 추진한 결과 당초 목표를 크게 웃도는 85%라는 높은 성과를 달성하였다. 이로써 군은 국내 창정비 능력을 통해 원활한 군수지원이 가능하게 되었고, 특히 유사시 작전 효율성 증대에 크게 기여할 것으로 예상된다.

  • PDF

Planned Depot Maintenance Interval Decision for Unmanned Aerial Vehicle through Reliability and Maintainability Based Simulation and Operating & Support Cost Analysis (신뢰도 및 정비도 기반 시뮬레이션과 운영유지 비용분석을 통한 무인항공기의 계획창정비 주기결정)

  • Sang Yeob Lee;Jun Hyun Son
    • Journal of Aerospace System Engineering
    • /
    • v.17 no.5
    • /
    • pp.1-10
    • /
    • 2023
  • This research sought to determine the optimal cycle of Planned Depot Maintenance (PDM) for Unmanned Aerial Vehicle (UAV), and PDM through Reliability and Maintainability-based simulation and Operating and Support (O&S) cost analysis using Reliability and Maintainability analysis results. The effectiveness of the PDM was verified economically, and the optimal PDM interval that balances UAV effective operations and sustaining engineering costs was presented.

A Study on the Necessity of Verification about depot level maintenance plan through the Weapons System cases analysis (무기체계 사례 분석을 통한 창정비개발계획안 검증 필요성 연구)

  • Ahn, Jung-Jun;Kim, Su-Dong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.2
    • /
    • pp.76-82
    • /
    • 2019
  • This study has done to search for a solution to remove risk limitedly caused by separating weapon system acquisition from operation and maintenance at the view point of Logistic Commander who's responsible for stable operation and maintenance after acquiring weapon system. At the System development stage, unverified overhaul development plan may cause additional manpower and costs after the development, and furthermore it is likely to have risk to lower reliability of the military. Thus, research and development agency should write overhaul development plan at the System development stage, and it should be verified through evaluation and verification test. Secondly, during research and development, institutional supplementation is needed to calculate human and material resources writing overhaul development plan. Thirdly, it should be able to analyze proper operation & maintenance plan and cost for overhaul plan at the pre-investigation stage. Fourthly, the base which can develop overhaul concept and overhaul factors should be included in the need and need determination document. Lastly, for the weapon system which has small amount of high power figure, project management should be performed to be able to specify at the each acquisition level of weapon system to realize Article 28, clause 3 and 4 of Defense business law.