• Title/Summary/Keyword: 집전 성능

Search Result 68, Processing Time 0.023 seconds

A simulation study on predicting the current collection performance in 400km/h on establishing the maximum speed test plan of the next Korean high speed train development project (차세대 고속철도의 최고속도 시험 계획 수립을 위한 집전 성능 예측 시뮬레이션)

  • Kwon, Sam-Young;Park, Chun-Soo;Cho, Yong-Hyeon;Lee, Ki-Won;Park, Young
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.428-432
    • /
    • 2008
  • The next Korean high speed train development project is started. In testing stage of this project, the 400km/h maximum speed test will be conducted. In Korean railway infrastructure conditions the 400km/h seems to be a critical speed especially in the aspect of the overhead contact lines. The current collection performance of the 400km/h which is predicted by dynamic interaction simulation are described in this paper. To discuss the permissible criteria of contact forces, displacements and percentage contact loss, the French 575km/h current collection conditions are simulated. Furthermore, review of the simulation results of the Korean 400km/h current collection conditions is conducted through comparison with that of the French 575km/h.

  • PDF

A Study on Performance of TGV-K Current Collection System for the Speed-up (속도 향상을 위한 고속전철 TGV-K 집전시스템의 성능에 관한 연구)

  • Hur, S.;Kyung, J.H.;Han, H.S.;Song, D.H.
    • Proceedings of the KSR Conference
    • /
    • 1998.05a
    • /
    • pp.533-539
    • /
    • 1998
  • Described in this paper are the dynamic model and the dynamic performance of catenary-pantograph system for TGV-K(maximum operating speed of 300km/hr). Dynamic simulations showed that the system satisfies the performance criteria such as contact loss ratio, contact force and lift-off of the contact wire. It is also shown by the simulations that the dynamic behavior and contact performance of the system at the operating speed of 350km/hr are found unacceptable. Design parameters of the catenary-pantograph system should be optimized for the speed-up of the TGV-K.

  • PDF

Characteristic analysis of inductive contactless power transformer laid under the road/railway for performance improvement (도로/궤도 매립형 무접촉 집전장치의 전력전달 성능개선을 위한 특성해석)

  • Han Kyung-Hee;Lee Byung-Song;Baek Soo-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1425-1430
    • /
    • 2004
  • In this paper, the inductive power transformer using electromagnetic induction for the road/railway applied to contactless power transfer system is suggested and some ideas for power collector design to improve the power transfer performance are presented. The proposed the inductive power transformer is used for the light railway/road transportation system. which has a large air-gap and demands a large electrical power capability. But. low output power is generated due to a loosely coupled characteristic of the large air-gap. Therefore, double layer construction of secondary winding, which was divided in half to increase both output current and output voltage was suggested. In addition, the performance of inductive power transformer to alignment condition between the primary power line and the inductive power transformer was verified by computer simulation of 2kW model.

  • PDF

Result and Analysis of Performance Test of Pantograph for High Speed Train (고속전철 집전장치의 성능 계측 결과 및 분석)

  • Seo Sung-Il;Park Choon-Soo;Cho Yong-Hyun;Mok Jin-Yong;Kang Bu-Byung
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.574-579
    • /
    • 2003
  • In this study, a measuring system for performance of pantograph was developed. The measuring system was installed on the prototype high speed train and measurement has been conducted during running on the test track. The measuring system is composed of video monitoring system and telemetry & data processing system. It can monitor the hazard behavior of pantograph and measure acceleration and vertical force of the pan head. Owing to the measuring system, performance of pantograph and safety of interface system of pantograph and catenary is evaluated.

  • PDF

Time-varying Stiffness of Catenary System and its Effect on Current Collection by Pantograph (가선계의 강성변화와 판토그래프의 집전성능)

  • 최연선
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.598-605
    • /
    • 2000
  • The design of a current collection system of high speed train requires the fundamental understandings fer the dynamic characteristics of a catenary system and pantograph. The stiffness of the catenary system of high speed train has the varying characteristics for the change of the contact point with a pantograph, since the supporting pole and hanger make the different boundary conditions for the updown stiffness of a trolley wire. The variation of stiffness results in Mathiue equation, which characterizes the stability of the system. However, the two terms variation of the stiffness due to span length and hanger distance cannot be solved analytically. In this paper, the stiffness variations are calculated, and the physical reasoning of linear model and one term Mathieu equation are reviewed. And the numerical analysis for the two term variation of the stiffness is done for the several design parameters of the pantograph.

  • PDF

Characteristic analysis of inductive contactless power transformer used for the road/railway to improve the performance. (도로/궤도 매립형 무접촉 집전장치의 전력전달 성능 개선을 위한 특성해석)

  • Han K.H.;Baek S.H.;Lee B.S.;Bae C.H.;Byun Y.S.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.1304-1306
    • /
    • 2004
  • Recently, the study for development of system having affinity for environment is on investigation. This issue is also applicable to transportation system. This paper suggested the inductive power transformer used for the road/railway applied to contactless power transfer system. The two secondary windings, large gaped magnetic structure and horizontal alignment between primary and secondary coil for that transformer approach a process for improvement of contactless power transfer system performance.

  • PDF

Analysis of Current Collection Performance Testing and Result of 350[km/h] Catenary System (350km/h 전차선로 집전성능 시험 및 결과 분석)

  • Heo, Yong-Seok;Lee, In-Hee
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.2
    • /
    • pp.365-369
    • /
    • 2016
  • The 350[km/h] catenary system was successfully opened in Honam high speed line. This 350[km/h] catenary system is firstly constructed in South Korea. Therefore the current collection performance of this system should be tested and evaluated by the authority. This paper describes the testings by running of HEMU-430X train and the evaluation criteria and result analysis to determine whether the performance of the catenary is good or not as a verification of catenary-pantograph interface. In detail, the contact force by pantograph, arcs by loss of contact and uplift amount of the catenary support were measured and discussed as a category of the current collection performance.

Test and Evaluation of the Pantograph for Korean High Speed Train (한국형 고속전철 집전장치의 성능 계측 및 평가)

  • 서승일;박춘수;조용현;최강윤;목진용
    • Journal of the Korean Society for Railway
    • /
    • v.6 no.2
    • /
    • pp.94-99
    • /
    • 2003
  • The pantograph for Korean High Speed Train was developed by home-grown technology. In this study, test and evaluation of the current collection performance of the pantograph is conducted. For this purpose, a measuring system is developed and installed on the prototype high speed train. Measurement is conducted while the train runs on the test track. The measuring system is composed of video monitoring system and telemetry & data processing system. It monitors the hazard behavior of the pantograph and measures acceleration and vertical force of the pan head. By applying the measuring system, accurate evaluation of the performance of the pantograph and safety assessment of the interface system of pantograph and catenary is facilitated.

A simulation study on predicting current collection performance with respect to the contact wire tension in 400km/h test run of the next high speed train HEMU-400X (차세대 고속철도 최고속도 시험에서 전차선 장력 증가 단계별 집전 성능 예측 시뮬레이션)

  • Kwon, Sam-Young;Park, Chun-Soo;An, Seung-Hwa
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.201-206
    • /
    • 2009
  • In the testing stage of HEMU-400X(next Korean high speed train) developing project, maximum speed(400km/h) tests will be conducted. On present and near future conditions of the overhead contact lines, 400km/h is over the design speed criteria. The predictions of current collection performance including the percentage loss of contact(arcs level) parameter through dynamic interaction simulation of HEMU-400X maximum speed test run are described in this paper. Various simulations are conducted at the condition of two different contact wire tensions to draw the proper contact wire increasing values in the 400km/h test line under the available contact wire tension supporting condition of that line.

  • PDF

Development of a Pulley-type Tensioning Device (도르래식 장력조정장치 개발)

  • Lee, Ki-Won;Cho, Yong-Hyeon;Park, Young
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.5
    • /
    • pp.663-669
    • /
    • 2009
  • In the electrical railway, the increase of tensions in an overhead contact lines is essential to speed-up of train, because current collection quality largely depends on the ratio of a wave propagation speed to a train speed. For Kyungbu high-speed line, a pulley-type tensioning device is required to have a tension variation of maximum 3%. Therefore we developed a pulley-type tensioning device in order to meet tension variation requirement of the high-speed tensioning device. To verify the performance of the developed device, a performance test, overload test and failure test were carried out according to the factory test procedure of the Kyung-Bu High-speed line. Furthermore, we also performed reliability performance through not only a fatigue test in a factory, but also on-line verification test in Chungbuk line for over 1 year. These tests verified that the tensioning device had applicability to a main line.