• Title/Summary/Keyword: 진척관리

Search Result 52, Processing Time 0.028 seconds

Analysis of risk management system of GM crops in China for the development of global GM crops (글로벌 GM 작물 실용화를 위한 중국의 GM 작물 안전관리제도 분석)

  • Lee, Shin-Woo;Cho, Kwang-Soo;Wang, Zhi;Kwak, Sang-Soo
    • Journal of Plant Biotechnology
    • /
    • v.39 no.3
    • /
    • pp.127-132
    • /
    • 2012
  • We analysed the current status of development of GM crops and national biosafety framework including legislation-related agricultural GMO in China to provide the policy for the development of global GM crops in Korea. In China, several GM crops including cotton, petunia, tomato, sweet pepper, poplar, and papaya have been approved for commercialization and they have been cultivated at more than 4 million ha. In addition, GM rice and GM maize have also obtained approval for productive testing in 2009. China will be the first country to approve GM rice for commercialization. Prior to commercialization in China, all GM crops must be approved by government authority for biosafety assessment specified by national legislation including restricted field testing, enlarged field testing, productive testing and safety certificate. According to China's legislation, agricultural GMOs have been classified by research and testing, production and processing. All GMOs must go through 3 steps of field testing (restricted, enlarged and productive). Prior to conducting each field testing, it has to be approved by government authority. It is assumed that at least one to two years will be taken for each step of field testing (total 4 to 8 years to obtain the final safety certificate) along with a large amount of budget.

Study of Sensor Technology Analysis and Site Application Model for 3D-based Global Modeling of Construction Field (건설 시공현장의 3D기반 광대역 모델링을 위한 Sensor 기술 분석과 향후 현장적용 모델 연구)

  • Kwon, Hyuk-Do;Koh, Min-Hyeok;Yoon, Su-Won;Kwon, Soon-Wook;Chin, Sang-Yoon;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.938-942
    • /
    • 2007
  • The importance of process improvement under construction has arisen from recent issue, lower productivity in the construction site. The various 3D modeling program is utilized in the procedure of construction as an alternative solution. However, it's still shortage of the consideration about a specific technical application. The purpose of the study in this paper is helpful to improve the productivity of construction site using 3D realization of constructing place as one of extensive modeling technologies, which leads to not only efficient management of construction site allowing people to check the real time situation in the place but also the revitalization of information flow about building process control and prgress, Therefore, I research into modeling algorithm and extensive construction site realization technology. 3D realization of building place would reduce the safety concerns by providing the real time information about construction site, and it could help to access easily to similar project through collecting and appling the database of sites. Furthermore it can be an opportunity to develop the procedure of production in construction industry and to upgrade the image of this field.

  • PDF

Extended KNN Imputation Based LOF Prediction Algorithm for Real-time Business Process Monitoring Method (실시간 비즈니스 프로세스 모니터링 방법론을 위한 확장 KNN 대체 기반 LOF 예측 알고리즘)

  • Kang, Bok-Young;Kim, Dong-Soo;Kang, Suk-Ho
    • The Journal of Society for e-Business Studies
    • /
    • v.15 no.4
    • /
    • pp.303-317
    • /
    • 2010
  • In this paper, we propose a novel approach to fault prediction for real-time business process monitoring method using extended KNN imputation based LOF prediction. Existing rule-based approaches to process monitoring has some limitations like late alarm for fault occurrence or no indicators about real-time progress, since there exist unobserved attributes according to the monitoring phase during process executions. To improve these limitations, we propose an algorithm for LOF prediction by adopting the imputation method to assume unobserved attributes. LOF of ongoing instance is calculated by assuming next probable progresses after the monitoring phase, which is conducted during entire monitoring phases so that we can predict the abnormal termination of the ongoing instance. By visualizing the real-time progress in terms of the probability on abnormal termination, we can provide more proactive operations to opportunities or risks during the real-time monitoring.

Improvements in the Business Process Model for the Aged Apartment Remodeling Project - In Case of the Number of Units Increased - (노후 공동주택 세대수 증가형 리모델링의 사업프로세스 개선)

  • Kim, Kyungrai;Yoon, Youngho;Kim, Chunhag
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.45-53
    • /
    • 2016
  • As the number of units increased by vertical extension is recently allowed according to the Housing Law, the aged apartment remodeling projects using the same allowed method are pursued in several apartment complex located in Bundang and Pyungchon. However, progress of the projects is not advanced due to uncertainty of the process. Therefore, the purpose of this study is to improve a business process model for the aged apartment remodeling in case of the number of units are increased for the remodeling union to pursue the remodeling project easily. In order to improve the process model, requirements for the Housing Act are analyzed, the existing process model is developed based upon the requirements, uncertainty of the existing process is examined and a to be process model is proposed to eliminate the uncertainty. Many architects and engineers are consulted to discuss the uncertainty and process model. This model will help the Government to reform the Housing Act and remodeling unions to pursue the aged apartment remodeling.

Height Determination Using Vanishing Points of a Single Camera for Monitoring of Construction Site (건설현장 모니터링을 위한 단안 카메라 기반의 소실점을 이용한 높이 결정)

  • Choi, In-Ha;So, Hyeong-Yoon;Kim, Eui-Myoung
    • Journal of Cadastre & Land InformatiX
    • /
    • v.51 no.2
    • /
    • pp.73-82
    • /
    • 2021
  • According to the government's announcement of the safety management enhancement policy for small and medium-sized private construction sites, the subject of mandatory CCTV installation has been expanded from large construction sites to small and medium-sized construction sites. However, since the existing CCTV at construction sites has been used for simple control for safety management, so research is needed for monitoring of construction sites. Therefore, in this study, three vanishing points were calculated based on a single image taken with a monocular camera, and then a camera matrix containing interior orientation parameters information was determined. And the accuracy was verified by calculating the height of the target object from the height of the reference object. Through height determination experiments using vanishing points based on a monocular camera, it was possible to determine the height of target objects only with a single image without separately surveying of ground control points. As a result of the accuracy evaluation, the root mean square error was ±0.161m. Therefore, it is determined that the progress of construction work at the construction sites can be monitored through the single image taken using the single camera.

A Study on the Actual Conditions of Neighborhood Parks : A Case of Busan Metropolitan City (근린공원시설 조성실태에 관한 조사연구 - 부산광역시를 사례로 -)

  • Kim, Gyeung-Su;Baek, Tae-Kyung
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.8 no.2
    • /
    • pp.68-80
    • /
    • 2005
  • Parks became a matter of concerned among urban planning facilities that have not been executed for a long time because of the judgement of constitutional disagreement. This study deals with actual condition of constructing neighborhood park at the level of urban planning. In order to enhance the coefficient of citizens' utilization of parks. This study analyzes current situation of neighborhood parks and developing condition in Busan, revealing problems by investigating types of facilities under construction as well as by comparing size and progress of the parks under construction. This study tries different kind of access to the problems with the emphasis on estimation of planning and establishing neighborhood parks on the basis of the coefficient of citizens' utilization. Through the various examinations, this study brings into relief the problems being created in the course of establishment of parks which functions only as green tracts of land at present. As a result, the following conclusions could be made. First, from the viewpoint of location the parks, Busan parks are mostly located in the mountain areas adjacent to urban districts. Secondly, establishment of neighborhood parks is usually for development projects and the facilities introduced in them are monotonous. Thirdly, there is a tendency towards expansion of size and standardization of facility. Forthly, establishment plan of parks lacks profitability. Lastly, there is serious limitation in the size of land for developing neighborhood parks, and what is worse, there is no management of them.

  • PDF

Development and Management of an Ontology and Registries for Sharing Metadata about Business Process Specifications under SOA (서비스 지향 아키텍쳐 하에서 비즈니스 프로세스 명세에 관한 메타 데이터를 공유하기 위한 온톨로지와 등록저장소의 개발 및 관리 방안)

  • Kim, Hyoung-Do;Kim, Jong-Woo
    • The Journal of the Korea Contents Association
    • /
    • v.7 no.11
    • /
    • pp.9-22
    • /
    • 2007
  • While standardization and its applications for registering and sharing information resources about B2B transactions such as business documents are relatively well developed, it is not easy to register and share business process resources because there are many ways to define complex business processes using different specification(definition) languages. In practice, there are several competing business process specification languages applicable under service-oriented architecture (SOA) such as ebXML BPSS, WS-BPEL, BPMN and so on. A systematic way has to be prepared to register/share diverse and heterogeneous specifications represented using those languages. This paper demonstrates the usefulness of sharing B2B business processes by prototyping a business process registry called ebRR4BP. First of all, we designed a metadata ontology to support the registration of diverse B2B business processes. To implement the proposed metadata ontology using ebXML registries, a mapping scheme to ebXML Registry Information Model is also suggested. The ontology and mapping scheme will be a foundation for supporting common interchange of business process metadata among B2B resistries.

Study on the Legal Issues of New Draft of Civil Aviation Law in China (중국 민용항공법 개정 최근 동향과 주요 법적쟁점)

  • Lee, Hwa
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.31 no.2
    • /
    • pp.177-214
    • /
    • 2016
  • During more than 20 years of practice, Civil Aviation Law has experienced three times of amendments since it was enacted in 1995. But these revisions are limited to the technical level. The problems and limitations have become increasingly prominent in its implementation. Firstly, the civil aviation law is the result of interests game among several departments and some legal issues was left behind and the regulation was very vague as a result. Secondly, the process of aviation legislation is the process that the country has undergone profound changes and social transformation. The 20 years is long enough for the society to undergo tremendous changes and 1995 version of civil aviation law does not keep pace of development of economy. There was a serious lag between reality and the law. In order to actively promote the development of the aviation industry and overcome implementation issues of the Civil Aviation Law, Civil Aviation Administration of China (CAAC) initiated modification procedure the law and published new draft of Civil Aviation Law in August 2016. The spirit of this modification is to learn and absorb new achievements of domestic and foreign legislation and the International Convention on civil aviation. Furthermore, the purpose of the revision is to provide favorable policy for the development of civil aviation industry and improve aviation safety and supervision, strengthen and protection of consumer rights and interests, to enhance the safety of civil aviation activities, and promote the development of general aviation. This revision concerned to the 78 articles which are revised or deleted and 24 articles added. The highlights of the draft include but not limited to the enhancement of security management, clarification of the main responsibility for production safety. And also it added the provisions related to the construction of effective tracking capability of public air transport enterprises and license system on the transport of dangerous goods. Compared with the existing civil aviation law, the draft has made a great improvements. But there are several deficiencies and limitations in the drafts. These problems need to be supplemented and perfected through further amendments in near future.

A Study on the Delay Analysis Methodologies in Construction of Korea High Speed Railway (경부고속철도 건설사업의 공기지연분석에 관한 연구)

  • Yun Sung-Min;Lee Sang-Hyun;Chae Myung-Jin;Han Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.250-255
    • /
    • 2004
  • To analyze delay, Seoul - Daegu line of Korea High Speed Railway was divided into three sections and analyzed independently by the business characteristics. The analysis on the project delay reasons was performed on macro and micro scales. This analytic method was named as 'Macro-Micro Delay Analysis Method (MMDAM)'. The macro scale analysis has three approaches, which are (1) scheduling, (3) structural characteristic, (3) and responsibility of project administrative works. Micro analysis also has three, methodologies which are (1) As Planned Method, (2) As Built method, (3) Modified Time Impact Analysis for analyzing the most influential section which the largest delay occurred. Using elicited project delay reasons from above analysis, the questionnaire was carried out for analyzing the influence of project delay reason. The reasons of the delay were driven from two different aspects (1) structural characteristic and (2) responsibility of the people involved in the project. The reasons that were identified from aforementioned three sections are the factors of the delay of the large-scale government driven projects. Finally, the author suggested the methodology of identifying the project delaying factors. The author also analyzed delay reasons in both the overseas and domestic cases of high rapid railway construction and has elicited some benchmarks for the future projects.

  • PDF

"Improving women's and children's health in DPRK" project funded by the Republic of Korea (현재 진행되고 있는 남북한 의료협력사업 : 영유아 지원 사업을 중심으로)

  • Shin, Young-Jeon
    • Clinical and Experimental Pediatrics
    • /
    • v.51 no.7
    • /
    • pp.671-689
    • /
    • 2008
  • The economic recession of North Korea has been prolonged, the need for humanitarian assistance for the women and children of DPRK has been raised. In March 2006, South Korean government signed MOU with World Health Organization (WHO) to financially support "Improving Women's and Children's Health in DPRK (IWCH)" project. The assistance projects through UNICEF and the non-government organizations of South Korea were also followed. IWCH project consists of three parts; nutrition, disease management, children and maternity care. The first term (2006-2007) of the project leading by WHO was finished, and the second term (2008-2010) is just begun. The projects driven by NGOs have relatively been delayed due to difficulties in negotiating on project contents and places with North Korea. Recently, however, re-modeling processes of an obstetric/gynecology hospital and a children hospital in Nampo were started. Up to recently, South Korean government has played only a limited role in the humanitarian assistance for North Korea. IWCH project is, however, a full-scale initiative driven by government based on a systematic review of need and priorities. A significant amount of budget and relatively long term (five year) project compare to the previous short term and small size programs were expected to make more meaningful achievement. Despite these positive aspects, the project remains a list of unsolved problems a lack of mutual trust, a different decision making process between South and North Korea, a lack of conflict management process, and unpredictability and complexity of international politics. In spite of such kind of political uncertainty, the health care sector will be a leading area in the process of improving relationship between South and North Korea, particularly, humanitarian assistance for women and children will play a crucial role in the process. The successful implementation of IWCH project, therefore, will contribute to provide the reference model in developing the mutually constructive relationship between South and North