• Title/Summary/Keyword: 진동제어발파

Search Result 73, Processing Time 0.019 seconds

A Comparative Study on the Characteristics of Vibration Propagation during Open-Pit Blasting using Electric and Electronic Detonators (전기 및 전자뇌관을 이용한 노천발파 시 진동전파 특성에 관한 비교 연구)

  • Lee, Ki-Keun;Lee, Chun-Sik;Hwang, Nam-Sun;Lee, Dong-Hee
    • Explosives and Blasting
    • /
    • v.37 no.1
    • /
    • pp.24-33
    • /
    • 2019
  • Recently, Electronic Detonators have gradually increased their performance for various purposes such as vibration control and improved Fragmentation. This study analyzed the vibration estimation equations of electric and electronic detonator blast by comprehensive analysis of the vibration data collected during electric and electronic detonator blast waves at the comparison sites of urban areas, geology and soil conditions, stone quarries and mines in different areas of Korea from June 2017 to December 2018. It has been confirmed that electronic detonator blast can meet the criteria for allowing vibration even if maximum charge weight per delay is increased by 1.5 times compared to the electric detonator blast.

A Case Study of Selecting Rock Excavation Method Considering the Geological Conditions in Daejon Area (대전지역의 토목지질학적 조건을 고려한 암파쇄공법 선정에 관한 사례연구)

  • 윤성현;이광열;안명석;류창하
    • Explosives and Blasting
    • /
    • v.19 no.4
    • /
    • pp.11-22
    • /
    • 2001
  • 토목공사장에서 암파쇄 작업은 경제성과 안정성에 지대한 영향을 미치는 작업이다. 본 논문은 대전지역에서 수행된 암파쇄 공법 설계 및 시공사례로서, 현장암반의 특성을 고려한 적정발파공법을 선정하기 위하여 대상 지역의 지질현황을 조사·분석하고, 또한 민원이 첨예한 도로개설 공사장에서 시험발파를 실시하여 이를 토대로 암절취 공법을 선정하여 시공한 사례보고이다. 대전지역의 지질은 선캠브리아기의 변성암류와 변성퇴적암류 및 이를 관입한 심성암류와 중생대 화강암으로 이루어져 있는 복잡한 분포를 이루고 있다. 사례연구 대상 현장은 편상구조가 현저한 관입 편상화강암 및 화강암질 편마암으로 구성되어 있었으며, 시험발파 및 분석결과를 기초로하여 25.5m이내 지역은 HRS 등 무진동 파쇄공법의 적용을 제안하였고, 25.5∼36m 범위의 대부분 지역은 진동제어를 할 수 있는 제어발파공법을 권장하였고, 기타 진동 영향권에서 비교적 안전한 것으로 나타난 지역은 소발파공법을 적용하도록 제안하였다. 제안된 안에 따라 설계를 보완하고 시공한 결과 문제의 발생없이 성공적으로 시공이 완료되었다.

  • PDF

Numerical Analysis on Controlled Tunnel Blasting by Heck Charge (다단 장약에 의한 터널 진동제어 발파의 수치해석)

  • 양형식;두준기;조상호;김원범
    • Tunnel and Underground Space
    • /
    • v.13 no.5
    • /
    • pp.403-411
    • /
    • 2003
  • Controlled tunnel blasting by deck charge was suggested and simulated by PFC and FEM analyses. Analyzed results showed that suggested method is efficient in fragmentation and able to decrease in vibration level because of decreased amount of charge per delay and dispersion of deck charge. This phenomena was explained by failure mechanism and proved that it can be successfully applied to tunnel blasting.

The Method of Tunnel Blasting for the Vibration Control by Deck Charge and Multiple Cut (다단장약에 의한 V-cut 발파공법의 진동제어효과와 발파효율증대에 관한 연구)

  • 두준기;양형식;김형건;김용국
    • Explosives and Blasting
    • /
    • v.21 no.3
    • /
    • pp.1-10
    • /
    • 2003
  • 터널굴착발파공법의 하나인 V-cut발파공법은 터널굴착기술이 발전되는 과정에서 초기에 개발되어진 기술이나 작업의 간편성과 효율성으로 인하여 많은 터널굴착공사에서 이용되고 있는 발파공법이다. V-cut발파공법은 일자유면 상태에서 V형으로 심발공을 발파하고 심발공에 의해 형성된 자유면을 이용하여 확대공으로 굴착공간을 넓히는 발파 방법이며 심발발파의 굴진장에 의해 단일발파당 굴진장이 결정된다. V-cut발파법이 개발된 이래 V-cut발파의 굴진장을 증대시키기 위한 방법으로 심발발파공의 구속저항을 감소시키기 위해 보조심발공을 발파하여 형성된 자유면에 의해 심발공의 최소저항선거리를 줄여 발파하였으나 심발공의 구속저항이 감소되지 않아 발파효율이 증대되지 않았으며 발파진동 또한 가장 크게 발생하였다. 이와 같은 현상은 최소저항선거리의 감소효과에 대한 발파기술상의 이론에 문제가 있기 때문이다. 본 연구에서는 V-cut발파법의 심발공에 대한 구속저항감소효과가 발현될 수 있는 조건들을 검토하여 최소저항선거리의 감소효과가 발현될 수 있는 조건을 제시 하여 심발공의 발파효율을 증대시키고 발파진동이 적어지는 발파방법을 제안하려 한다.

A Suggestion of Blasting Patterns of a Mine closed to Railway Line for Securing Safety of High Speed Train (고속철도 안전확보를 위한 노선 인접 광산의 발파패턴 제안)

  • Kim, Hyun-Ki;Lee, Sung-Hyeok;Lee, Jin-Wook;Choi, Chan-Yong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.5
    • /
    • pp.1-9
    • /
    • 2015
  • Recently Honam high-speed railroad line is constructed in southern part of Korea. This line is for next generation HST named HEMU-430X. But there is a limestone mine near this line and this mine will make a process to dig a passageway under the railway line. In this case, safety of railroad system and stability of mine are crucial problems on both sides. By measuring mine blasting vibration and calculating regression equation, effect of mine blasting to train running is investigated quantitatively. 0.5 kine (cm/sec) is applied as a management specification of vibration based on field measurement. In this study, changes of blasting patterns are suggested to control vibration of mine blasting. And the effect of train vibration to mine is also invesitigated by numerical analysis.

A Study on the Tunnel Blasting Technique with a Combined Application of Electronic Detonators and Low Vibration Explosives in a Close Proximity to a Safety things (전자뇌관과 미진동폭약을 활용한 보안물건 초근접 구간에서의 터널발파공법 적용에 관한 연구)

  • Oh, Sei young;Lee, Chun sik;Lee, Ki keun;Lee, Dong hee;Lee, Seung jae;Park, Jong ho
    • Explosives and Blasting
    • /
    • v.35 no.4
    • /
    • pp.36-47
    • /
    • 2017
  • Due to civil complaints on vibrations and noises arising from blasting, mechanical excavation has been widely used for tunneling rather than the method of blasting, especially in the case of being in a close-proximity of 10M-20M range to a safety-thing. However, mechanical excavation, though less, it does increase the cost of whole construction project as the period of excavation is much prolonged from lack of constructability. This study aims to research and develop an effective blasting method that can ensure the constructability of shortened excavation period whilst not compromising the safety of the safety-things in a proximity to the blasting site by using a combination of an electronic detonator that can accurately control its delay period and a Low Vibration Explosives(LoVEX) that is effective on vibration control.

A Study on the Improvement of Surface Blasting Method in Pasir Coal Mine (파시르 탄광에서의 채탄발파공법에 대한 문제점 분석 및 개선방안 연구)

  • Choi Byung-Hee;Ryu Dong-Woo;SunWoo Choon
    • Explosives and Blasting
    • /
    • v.24 no.1
    • /
    • pp.57-62
    • /
    • 2006
  • The typical blasting method adopted in Pasir Coal Mine is a surface blasting technique with a single free face. It means that there is only one free face, which is usually the ground surface. This kind of blasting method is easy to use but inevitably causes enormous ground vibrations, which, in turn, can affect the stability of the slopes comprising the various boundaries of the open pit mine. In addition, the method also has the problem of lowering the blast efficiency compared to other methods such as bench blasting methods or ones with more than two free faces. In this respect, a project was launched to develop a new blasting method that is suitable for controling the ground vibration and enhancing the blast efficiency. As a part of the project, authors investigated the current blasting method as well as the overall pit developing process in the mine, and established some important guidelines that should be observed during the whole development process. This paper presents the details of the typical blasting pattern and the pit developing method in the mine, and suggests the guidelines determined from the results of the observations.

A Case Study of the Koryo Fine Cracker Using the Air Gap. (Air Gap을 이용한 미진동 화약의 현장적용 사례)

  • 안봉도;조영곤;이익주
    • Explosives and Blasting
    • /
    • v.22 no.1
    • /
    • pp.75-80
    • /
    • 2004
  • 최근 도심지의 가속화에 따라 시가지 인근에서의 암반굴착이 활성화되고 있으며, 특히 보안을 요하는 구조물에 근접한 발과 또는 가동중의 설비 가까이 에서 발파굴착을 실시해야하는 등 주변환경을 충분히 고려하여 진동, 소음 및 비산을 효과적으로 제어할 수 있는 발파기술이 요구되고 있다. 이와 같은 배경에서 미진동 발파굴착을 위하여 콘크리트 파쇄기, 팽창성 파쇄제 등이 개발되어 실용화되고 있다. 국내에서는 (주)한화가 콘크리트 파쇄기(Finecker)를 개발하여 공급해 왔으며, (주)고려 노벨 화약에서는 저폭속(2,000 m/s) 화약을 2중의 Air Gap을 이용하여 진동 및 소음 제어하는 미진동 발파용 화약(Kinecker)을 출시하여 공급하고 있다. 이에 Kinecker의 원리와 특징 그리고 현장적용 사례 및 발파패턴을 소개하고자 한다.

A Case Study of the Automatical Blasting Vibration Measuring System Using the Solar Power Supply (태양전지 전원 공급장치를 이용한 발파진동 자동화 계측시스템 운영 사례연구)

  • Yoo, Ji-Wan;Lee, Tai-Ro;Kim, Jung-Ryul;Kim, Young-Suck
    • Explosives and Blasting
    • /
    • v.26 no.2
    • /
    • pp.92-98
    • /
    • 2008
  • Measuring methods of the blasting vibration were generally divided the. manual method and the automatical method. When using the automatical method, field data of the vibration meter can be transferred to a operation computer by using remote equipments. In this study new automatical system using solar power supply is to be introduced. New automatical system is well suited for the field which is difficult to access and is needed frequent measurements of the blasting vibration. And it can make easy to accumulate the data and control the blasting vibration for safe blasting.

A Blasting Experience in a Shallow Tunnel Section Overlain by Residential Structures (터널 상부 근접시설물 통과구간의 발파시공사례)

  • Won, Yeon-Ho;Kang, Choo-Won;Kim, Joung-In
    • Explosives and Blasting
    • /
    • v.26 no.2
    • /
    • pp.99-107
    • /
    • 2008
  • This study, to reduce a ground vibration damage of the structures in an area adjacent to housing structures located closely above the tunnel section, is the ground vibration reduction instance of a tunnel blasting selectively applied the ground vibration-controlled blasting method (delay time applied blasting method, large center hole cut method, Line Drilling method, etc) with an originally planned blasting method connected, but with it's workability and economic efficiency is satisfactory, so, the results says the ground vibration-controlled blasting method on a similar condition is very effective, even if the applicability is depend on the blasting method and ground condition of the work area.