• Title/Summary/Keyword: 지하철 급행노선

Search Result 10, Processing Time 0.022 seconds

Estimating Internal Transfer Trips Considering Subway Express Line - Focusing on Smart Card Data Based Network - (지하철 급행노선을 고려한 내부환승 추정방안 - 스마트카드 자료기반 네트워크를 중심으로 -)

  • Lee, Mee Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.5
    • /
    • pp.613-621
    • /
    • 2019
  • In general, transfer in subway stations is defined as transfer between lines and station transfer. In transfer between lines, passengers change from one subway line to another by utilizing horizontal pedestrian facilities such as transfer passages and pedestrian way. Station transfer appears in the situation that subway lines of enter and exit gate terminals differs from those of boarding and alighting trains and passenger trips utilize both vertical pedestrian facilities such as stair and escalator and horizontal facilities. The hypothesis on these two transfers presupposes that all subway lines are operated by either local train or express in subway network. This means that in a transfer case both local and express trains are operated in the same subway line, as a case of Seoul Metro Line 9, has not been studied. This research proposes a methodology of finding the same line transfer in the Seoul metropolitan subway network built based on the smart card network data by suggesting expanded network concept and a model that passengers choose a theirs minimum time routes.

An Investigation of Rider Behavior to Transfer Seoul Metropolitan Transit Using Public Transport Card Data (교통카드 데이터를 이용한 수도권 광역급행철도 환승행태에 관한 연구)

  • Gun ki Jung;Dong min Lee;Sun hoon Kim
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.21 no.6
    • /
    • pp.146-164
    • /
    • 2022
  • Recently, the Korean government promoted the construction of metropolitan express subway to connect major transportation hub in the metropolitan area within 30 minutes. Most stations of the metropolitan express subway are connected to existing subway stations, so the importance of transfer increased. Although many studies have been conducted on the effect of transfer penalty on route choice, there are few studies on the transfer behavior of the metropolitan express subway. Therefore, in this study, a transfer behavior analysis was conducted on the Shinbundang Line, a representative metropolitan express subway. To analyze the transfer behavior according to the degree of traffic congestion and the presence of fare payment, route choice models were made using transport card data divided according to week, time, and user characteristics. As a result of the analysis, users of the metropolitan express subway had greater disutility to the transfer waiting time compared to the transfer moving time. Furthermore, especially during the peak time, EIVM(Equivalent in-vehicle minutes) of the transfer waiting time was 3.51. In this study, EIVM for metropolitan express subway users were analyzed to be 2.6 minutes, which is significantly lower than the results of previous studies on subways. This suggests that there is a difference in the transfer penalty between subways and metropolitan express subway, and that it is necessary to apply the transfer penalty between subways and express subway differently when forecasting subway traffic demand.

시뮬레이션을 기반으로 한 지하철 혼잡도 개선에 관한 연구

  • Kim, Sang-Pil;Yu, Jae-Gon;Kim, Jong-Bae
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.05a
    • /
    • pp.71-73
    • /
    • 2015
  • 2009년 7월 개화에서 신논현까지 서울 지하철 9호선이 개통했다. 2010년 9호선 일평균 통행량은 예측 통행량 대비 97%수준이었으나, 2013년은 110%를 달성했다. 2015년 3월 2단계구간이 개통되어 평일 평균 이용객이 15만명 정도가 더 늘어났다. 국회 자료에 따르면, 출근시간 염창역에서 당산역까지의 혼잡도가 237%로 나타났다. 이는 다른 지하철 혼잡도 2배 뛰어넘는 수치이다. 당산역에서 여의도역(234%), 여의도역에서 노량진역(212%), 노량진역에서 동작역(216%)으로 기록이 될 만큼 특정 구간의 혼잡도가 높게 나타났고 급행노선을 선호하는 인원이 많아 시간이 지날수록 정체현상이 가중되고 있다. 따라서 본 연구는 혼잡도의 주 원인인 정체현상을 감소시키고 여객 수송율을 증가시키기 위해 기존의 급행 프로세스를 변경하는 방안을 제시한다. 여기에 적용된 연구방법은 혼잡도 수준을 낮추기 위해 필요한 프로세스 설정하고 아레나 시뮬레이션 프로그램 분석을 통해 본 연구에서 제시한 방안에 대해 검증한다. 본 연구에서 제안한 방식을 통해 지하철의 혼잡도 해소에 도움을 줄 수 있을 것이다.

  • PDF

Study on Local Bus Service after Bus Route Reform in Busan (버스노선개편 이후 부산 시내버스 운행실태에 관한 고찰)

  • Song, Ki-Wook;Jung, Hun-Young;Lee, Joon-Seung
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.3
    • /
    • pp.41-51
    • /
    • 2008
  • As the local bus service diagram after the bus route reform is studied by variable analysis based on traffic card data and income adjustment data, the characteristic of the local bus system is revealed in Busan Metropolitan city. The relationship between traveling length and traveling time is influenced by traveling velocity. In order to keep a headway within 10 minutes, bus service number per minute should be over 0.1013 vehicles. The traveling time of afternoon is generally longer than that of forenoon. Compared with the bus used by a lot people, the deviation of that used by a few people is larger in the all cases of length, headway, time and velocity. According to the analysis of the relationship among card trip number, average income and transfer rate, the relationship between card trip number and average income is expressed as linear function in the general bus and as exponential function in the high-grade & rapid bus. The 1% increase of transfer rate is equal to 6.3 trip/vehicle/day decrease and 4.9 trip/vehicle/day decrease in two bus types respectively. The four effective variables are defined by the discriminant analysis between the profitable routes and the unprofitable; According to discriminant size, bus service number per km, bus via suburb, subway meeting number, bus via university. In order to increase the income when the minibus will be included among public transit transfer system in 2008, it should be necessary to settle the bus network and revitalize the public transit better. In order to decrease the cost, it should be necessary to reorganize the hierarchy between the local bus and the minibus better.

Fundamental study on enlargement method of existing subway tunnel during operation for sidetrack construction (부본선 건설을 위한 기존 지하철 터널의 운영 중 확폭 방안에 대한 기초연구)

  • Lee, Hyobum;Koh, Sung-Yil;Jun, Jonghun;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.1
    • /
    • pp.59-76
    • /
    • 2020
  • As a continuous increase in demand for the transportation infrastructure in the metropolitan area, the renovation of existing metropolitan and urban railway lines for the rapid transport system requires the construction of sidetrack that can operate local and express trains simultaneously. However, the construction of sidetrack after stopping the operation of the existing subway line causes a lot of economic losses, therefore it is essential to study the tunnel enlargement scheme during the operation of the existing subway tunnel. Accordingly, in this paper, basic research on the enlargement plan of the existing subway tunnel was carried out for the renovation of the existing subway line. In order to investigate the method for the sidetrack construction, the Government Complex Gwacheon station on the Gwacheon line of subway line 4 was selected as a virtual research station. Subsequently, four construction plans including tunnel cross-sectional plan for each section were reviewed and constructability and economic feasibility were compared. Finally, the stability assessment was conducted for the selected construction plan which was considered to be relatively unstable by 3-D full numerical analysis considering the sidetrack construction process.

Technical Study on Possibility of an Express Service Wide Area Railway (광역철도 노선의 급행화 가능성에 대한 기술적 검토)

  • Park, Jung Hyun
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.5
    • /
    • pp.612-624
    • /
    • 2017
  • As the existing metropolitan area metropolitan railway operates on a one-to-one basis, which leads to long travel times, its competitiveness with other means of transportation is deteriorating. Since there is a limit to attracting road traffic by rail, there is a continuing societal demand to expand express train service. Especially in the northern and the southwestern parts of the metropolitan area, a public transportation network system with express function, connecting to the city center of Seoul, is needed because of the social cost of the increase of traffic congestion and the increase of the travel time. The most efficient express service in Korea is Seoul Subway Line 9, which runs in 27 minutes from Gimpo Airport to the high speed terminal; this is a 40% shorter time compared to 44 minutes by car; the congestion in this area is up to 240%, so the preference for this train is quite high. The technical results of this study are expected to contribute to the implementation of an express service metropolitan railway.

Analysis of Acceleration and Deceleration on High Performance Train for A Metropolitan Rapid Transit System (대피선 최소화를 고려한 광역·도시철도 급행화를 위한 고성능 열차 가감속도 분석)

  • KO, Kyeong Jun;KIM, Jung Tai;KIM, Moo Sun;JANG, Dong Uk;HONG, Jae Sung;RYU, Sang Hwan;JUNG, Jong Deok
    • Journal of Korean Society of Transportation
    • /
    • v.33 no.6
    • /
    • pp.564-574
    • /
    • 2015
  • As shown by the popularity of the rapid train in the Seoul Metro Line No. 9, the demand for the rapidization of the metro transit has been continuously increased. However, it needs tremendous cost to construct new additional infrastructures to the existing line for the rapidization. In order to overcome the problem, utilizing the existing infrastructures such as crossing tracks as railroad sidetracks can be considered to be a good method of reducing the cost. In this case, there is a way exploiting the existing train as an express train and the advanced train, which increases both acceleration and deceleration, as a local train, but achievable acceleration and deceleration have not been analyzed rigorously. In this paper, we analyze feasible ranges and optimal values of both acceleration and deceleration of the advanced train analytically when we consider the rapidization of the metro transit utilizing the existing infrastructures and verify the results in Seoul Metro Line No. 3. Simulation results show ranges and optimal values of achievable acceleration and deceleration exist when minimum gap between an express train and a local train is smaller than 40 seconds.

A Development of Optimum Operation Models for Express-Rail Systems (급행열차 도입을 통한 최적운행방안 수립에 관한 연구 - 수도권 광역 도시철도를 중심으로 -)

  • Park, Jeong-Soo;Lee, Hoon-Hee;Won, Jai-Mu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.679-686
    • /
    • 2006
  • Recently, the city railway in the Seoul Metropolitan Area (SMA) has offered a low quality of service as a passage time, because it was operated slowly. So, the people who live in modern society are not satisfied about passage time, therefore, this study tried to make that the subway in the SMA becomes a more functional and effective wide-area-transportation-network through an express train introduction's method which examined cases from abroad and current system. and then presented how express train could be applied to current system. In a case study, We used the An-San Line and Su-In Line as a examples and developed a schedule which can minimize the delaying time of subway by using Branch & Bound Algorithm. The train operational plan was loaded to consider a railroad siding, Obtained site, and the dispatch interval(three to ten minutes) for the express and local lines and finally, We presented an alternative operational plan which made by those factors.

A Study for the Express Railway of Seoul Metropolitan Area(Kangnam$\sim$Ilsan) (수도권(강남$\sim$일산) 급행철도 도입에 관한 연구)

  • Park, Kwang-Bok
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1269-1278
    • /
    • 2009
  • The Seoul metropolitan area is generated the transportation problems of traffic congestion, delay of travel time, etc due to the increase of traffic demand at Seongnam area, Koyang/Paju area, Incheon/Bucheon area, etc, because that have not provided the urban surrounding railway network and live to be concentrated about 49% of the population of Korea. The Koyang/Paju route axis is required the urban surrounding railway network because the share percentage of public transportation is 51%, the automobiles is 48.8% and the subway is 27.3% and the housing development plan for 530,000 persons have provided. According to the result of the study for the introduction of the express railway between Kangnam to Ilsan of 37.8Km, in case of operation of 150Kmm at express railway, the scheduled speed between Kangnam to Ilsan is 103Km/h, the running time is about 23 minutes. The demand of traffic of this project was forecasted about 237,000persons by traffic analysis. This project which was analysed B/C of 1.08 by the result of the feasibility study have a economic feasibility.

  • PDF

A Case Study on Blasting at the Tunnel Excavation in an Adjacent Section of a Subway Station (지하철역 인접구간에서의 터널 발파굴착 사례)

  • Lee, Hyo;Kim, Jeoung-Hwan;Hwang, Nam-Sun
    • Explosives and Blasting
    • /
    • v.40 no.2
    • /
    • pp.25-34
    • /
    • 2022
  • Recently, there has been an increasing number of cases of improving constructability by using electronic detonators with precise delay time in tunnel blasting sites. This case is a case of conducting test blasting using with non-electric detonator and electronic detonator at the site of 『Seoul Metropolitan Area Express Railroad Route A Private Investment Project Section 00』 that requires careful management of vibration and noise. Although this site was designed with a non-electric detonator, it was attempted to improve the advance rate and control vibration and noise by mixing the non-electric detonator and the electronic detonator due to the decrease in the advance rate. As a result of the blasting, the target value was achieved with an advance rate of about 85% and a maximum measured value of vibration and noise is 0.215cm/sec and 73.22dB(A) which were measured below regulatory standards. As blasting works in downtown areas, it is necessary to designate measurement and management objects to continuously manage vibration and noise.