• Title/Summary/Keyword: 지하철 구조물

Search Result 149, Processing Time 0.026 seconds

Case Studies for Temporary Soil Support Walls of Subway No.9 (지하철 9호선 흙막이 구조물의 설계 사례 분석)

  • 주재건;김영진;김경태
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.96-103
    • /
    • 2002
  • In this study, design concepts of Seoul Subway Construction (901∼914) are reviewed in relation to the cases for temporary soil support wall systems which are revealed in highly developed design competitions such as Turnkey and Alternative based on. Especially soil and rock properties, various design schemes for dealing with soil and water pressures, new technology adopted etc are discussed very profoundly and broadly for the better understanding and additional clues for constructing new design technologies.

  • PDF

A Study on the Application of Roof Panel Shield Method (RPS 공법의 적용성 연구)

  • Kim, Jung-Hyi;Jung, Byung-Chul;Shin, Eun-Chul;Kim, Jong-In
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1585-1592
    • /
    • 2008
  • 산업사회의 발전에 따라 사회 기반시설분야도 복잡다양해지고 특히 도시기능이 활발해지면서 지금의 도심지에는 지하철, 상수도, 하수도, 전력구, 통신구, 지하보차도, 지하상가, 지하주차장 등 여러 가지 용도의 지하공간이 요구되고 있으며, 이러한 지하 구조물을 축조하는데 있어 도로상에 차량 증가로 인한 교통 혼잡이나, 지하매설물의 장애로 인하여 기존의 개착식 공법으로 시행하지 못하고 지하터널공사로 시행하는 경우가 빈번하다. 기존 국내 외 터널공법 관련문헌과 현재 사용되는 터널공법의 실제 시공에 관한 정보를 수집하여 장 단점, 시공시 주의사항, 적용조건등의 조사내용을 바탕으로 RPS 공법을 고안하였다. 소규모 지하구조물을 구축하기 위한 RPS 공법은 출발갱내에서 상부에 파이프 루프를 시공한 후 광폭 유압 패널이 장착된 철제 선도관을 추진시켜 선도관을 원압잭에 의하여 압입한 후 P.C. 콘크리트 구조물을 거치하고 원압으로 압입 추진토록 하였다. 또한, 대규모 지하구조물 축조시에는 구조물 예정상단부에 지반조건에 따라 파이프 루프공법 또는 소구경 Semi-Shield 공법을 이용하여 루프를 시공함으로써 상부의 침하를 방지하고, 측벽은 광폭유압 패널을 이용하여 여굴의 최소화 및 곡선부 시공을 용이하게 하였다.

  • PDF

A New Hybrid Method for Nonlinear Soil-Structure Interaction Analysis (비선형 지반-구조물 상호작용해석을 위한 새로운 복합법)

  • 김재민;최준성;이종세
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.7 no.6
    • /
    • pp.1-7
    • /
    • 2003
  • This paper presents a novel hybrid time-frequency-domain method for nonlinear soil-structure interaction(SSI) analysis. It employs, in a practical manner, a computer code for equivalent linear SSI analysis and a general-purpose nonlinear finite element program. The proposed method first (calculates dynamic responses on a truncated finite element boundary utilizing an equivalent linear SSI program in the frequency domain. Then, a general purpose nonlinear finite element program is employed to analyze the nonlinear SSI problem in the time domain, in which boundary conditions at the truncated boundary are imposed with the responses calculated in the previous frequency domain SSI analysis, In order to validate the proposed method, seismic response analyses are carried out for a 2-D underground subway station in a multi-layered half-space, For the analyses, a equivalent linear SSI code KIESSI-2D is coupled to ANSYS program. The numerical results indicate that the proposed methodology can be a viable solution for nonlinear SSI problems.

A study of Heat & Smoke Extraction Effects by the Various Operation of funnel Fan Shaft Ventilation (터널팬 샤프트 환기 방식에 따른 열 및 연기배출효과에 관한 연구)

  • Rie, Dong-Ho;Yoo, Ji-Oh
    • Fire Science and Engineering
    • /
    • v.18 no.2
    • /
    • pp.49-56
    • /
    • 2004
  • Today's popular ventilation systems include the combined jet fans and electrostatic precipitation systems or the combined jet fans and vertical shaft system. Tunnels with these two ventilation systems applied have been designed and opened, more and more interest has been put in maintenance of a tunnel after opening. Therefore. it is to become more important to come up with the optimal operation mode and the method for the evaluation of ventilation system. In this study, to evaluate a tunnel ventilation and its economy, a dynamic simulation program was developed which can simulate the unsteady-state tunnel air velocity and concentration of pollutants according to the traffic flow variations and operation condition of a ventilation system. We clarified the effectiveness usage on tunnel ventilation by using it and also we could found the most economical ventilation operation mode by application in real exit tunnel. We obtained that combination of fan system and electrostatic precipitation system was more economical than jet fan priority operation mode.

Evaluation of Corrosion Thickness Loss of Temporary Steel Members Exposed to A Subway Construction Site (지하철 공사현장 환경하의 가시설 강재의 부식두께감소량 추정)

  • Kim, In Tae;Jeon, Sang Hyuck;Hur, Jung Ok;Cheung, Jin Hwan
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.3
    • /
    • pp.301-310
    • /
    • 2009
  • Steel has been widely used as a material in temporary structures. Corrosion attack often reduces the long-term durability of temporary steel members that are not protected from corrosion. In designing temporary steel structures, it is difficult to evaluate their long-term durability, since the thickness loss of steel members is not clear. In this study, laboratory and field exposure corrosion tests were performed on structural steel plate specimens, and the loss of thickness of specimens that were exposed to a subway construction site for 11 months and of specimens that were exposed to environments with controlled humidity and calcium chloride for six months were measured. Finally, a thickness loss equation was formulated based on the environmental conditions and the testing periods.

Simplified Evaluation Method for Residual Bond Strength of Reinforced Concrete Using Standard Fire Curve (표준화재곡선을 이용한 잔존부착강도 평가 간략방법 제안)

  • Moon, Do-Young
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.5
    • /
    • pp.41-47
    • /
    • 2010
  • For the enhancement of structural safety of thermally damaged reinforced concrete structure, rapid evaluation of damage in the structure is very important. This study addresses a simplified method which is equivalent to the standard fire curve (ISO 834) for the residual bond strength evaluation. In the proposed method, a exposure duration as well as the maximum temperature can be considered. For the comparisons with conventional methods, concrete properties obtained from the report of Daegu subway fire accident were referred and the results support the applicability of the proposed method in this study.

Analysis of Factors Influencing upon the Metro Wear Using the Classification and Regression Trees (CART 분석을 이용한 지하철 마모 영향인자 분석)

  • Jeong, Min Chul;Lee, Won Woo;Kim, Jung Hoon;Kong, Jung Sik
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.38-38
    • /
    • 2011
  • 일반적으로 레일마모는 열차의 주행안전 및 승차감에 미치는 영향이 크고, 소음 진동의 주요원인으로 작용한다. 또한 레일마모가 발생할 경우 궤도구조의 파괴를 촉진시킴으로써 차량 및 궤도유지보수비를 크게 증가시킨다. 따라서 구간 특성 및 환경 영향 인자 등 현장에서 발생하는 마모 원인을 체계적으로 분석함으로써 마모를 저감할 수 있도록 차량운행 조건과 선로선형 및 궤도구조를 설계하는 것은 중요한 과제이다. CART(Classification And Regression Tree; 분류와 회귀나무) 분석은 패키지화된 좋은 분류 및 예측도구 기법으로 나무의 상위 분리수준에서 일반적으로 나타나는 가장 중요한 입력변수들을 사용하는 등의 입력변수를 선정하는 경우 매우 유용하다. 본 연구에서는 다변수 구간특성 및 환경인자를 고려한 검측 자료 상관관계 분석을 위한 회귀 나무기반 모델(TBM: Tree Based Model) 분석 수행을 위해 지하철 2호선 마모 데이터와 마모 데이터에 영향을 미치는 각종 다변수 구간특성 및 환경인자를 사용하였다. 2호선 지하철의 구간특성 인자 및 환경인자는 레일의 종류, 레일의 위치, 도상, 곡률반경, 캔트 슬랙 및 운행 일수 등으로 구분하였다. 레일의 종류는 ks-50kg과 ks-60kg 두 종류의 레일이 있으며, 레일의 위치는 지상과 지하로 크게 구분할 수 있다. 도상은 콘크리트 도상, 자갈 도상과 일부 구간의 방진상 콘크리트 도상으로 구분할 수 있으며, 곡률반경은 직선구간과 완화곡선 구간 및 최소 250m부터 627m까지 분포된 원 곡선 구간으로 구분할 수 있다. 캔트 간격은 최소 96cm 부터 120cm 간격으로 구분하며, 슬랙은 5~9cm에 분포하고, 운행 기간은 해당 기간 동안 유지보수 이력이 없는 구간을 선정하여 2005년부터 2006년까지 4번에 걸쳐 검측된 지하철 2호선 내선 마모데이터를 사용하였다. 총 X1부터 X7까지 총 7개의 구간특성 또는 환경특성을 영향인자로 선정하였으며, 이러한 영향인자에 의해 결정되는 종속 인자로 Y1인 직마모와 Y2인 측마모를 선정하여 이 중 실질적으로 지하철 궤도의 성능 평가에 주요 판단인자로 사용되는 측마모와 구간특성 및 환경영향인자와의 상관관계 분석을 수행하였다. 해당 마모 데이터가 검측되는 기간 동안 유지보수 이력이 없는 12272 point의 데이터를 검출하였고 CART 프로그램을 이용하여 데이터를 분석하였으며, CART 프로그램의 해석을 위해 종속변수인 직마모량은 각 검측 지점의 마모량에 해당하는 등급으로 변환하여 분석을 수행하였다. 레일의 마모에 영향을 미치는 구간특성 및 환경인자와 종속 변수로 사용된 레일의 마모량 사이의 CART를 이용한 상관관계 분석은 실제 구조물에서 영향인자간의 상관 관계와 유사하며, 추후 연구에서는 이를 바탕으로 하여 정량화된 검측 데이터를 종속변수로 하여 구간특성 또는 환경인자 등 외부 영향인자를 고려한 궤도 검측데이터와의 상관관계 분석을 수행할 계획이다.

  • PDF

Case Study on the Impact-Echo Method for Tunnel Safety Diagnosis (터널 안전진단을 위한 충격반향법 사례 연구)

  • Shin, Sung-Ryul;Jo, Cheol-Hyun
    • Tunnel and Underground Space
    • /
    • v.19 no.1
    • /
    • pp.19-30
    • /
    • 2009
  • For the purpose of determining the thickness of concrete lining and detect of the cavity where may be located behind tunnel lining, IE (Impact-Echo) method it effectively useful in the tunnel safety diagnosis and the quality control during the construction. As a part of case study, we applied IE method to various tunnel structure types such as road tunnel and subway tunnel constructed by NATM (New Austrian Tunnelling Method) and ASSM (American Steel Support Method). As tunnel specifications estimated from this method were compared with coring data, design drawing and other survey results, it was very good agreement with each other. In conclusion, we verified that IE method shows an accurate and reliable result. The conventional interpretation of IE method in frequency domain gives only vertical information at a certain point. However, the interpretation using time-frequency analysis and depth section imaging technique from two dimensional profiling surveys can show more reliable information about structure inside.

A proposed temperature crack index table based on correlation between temperature cracks and construction methods in subway concrete box structures (지하철 콘크리트 BOX 구조물의 수화균열에 대한 상관관계 분석 및 온도균열지수표 제시)

  • Song, Suk-Jun;Park, Ji-Woong;Kim, Eun-Kyum
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1437-1443
    • /
    • 2010
  • Thermal stresses due to the heat of hydration can cause extensive cracking in subway structures. In order to reduce heat cracks, construction methods (e.g. sequential or skipping construction methods) need to be changed. However, to our knowledge, the existing literature contains little information on the correlation between heat cracks and construction methods. Thus, in this study, the temperature crack index table was suggested based on construction lengths (6 m, 9 m and 18 m), concrete mixtures (Type I cement with FA of 20 % in cement weight, Type IV cement with FA of 10 % in cement weight, and mixture of three different cements), construction seasons (spring or autumn, summer and winter) and construction method (sequential or skipping construction methods). The index table can be easily used corresponding to changes in concrete placing method at the construction site. Also, the correlation of cracking due to sequential or skipping construction methods was derived based on the statistical approaches.

  • PDF

A Study on Stability of Cracked Main Structure in Subway (균열발생 지하철 본선구조물의 안정성 연구)

  • Woo, Jong-Tae;Yhim, Sung-Soon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.3 no.3
    • /
    • pp.187-194
    • /
    • 1999
  • In this study, a series of items on the safety and stability of cracked main structure in subway are investigated and analyzed. Cracks due to dry contraction under the construction can be found when a tensile stress of cross section is higher than tensile strength at a value of coefficient of dry contraction $200{\times}10^{-6}$. It is concluded that there is no problems when load carrying capacity, that is, an ability of resisting loads of structure is enough in this analytical model. Also, it is concluded that this model has a desirable serviceability because a width of bending crack is lower than allowable one.

  • PDF