• Title/Summary/Keyword: 지하발파

Search Result 314, Processing Time 0.025 seconds

A Case Study on the Prediction of Fragmentation of Blasted Rock in Tunnel Blasting (터널발파에서 파쇄암의 입도예측에 관한 사례연구)

  • Ahn, Myung-Seog;Ryu, Chang-Ha;Kim, Su-Seog
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.3 no.1
    • /
    • pp.3-9
    • /
    • 2001
  • The investigation of the fragmentation of blasted rocks is particularly important because it is a measure of the blast efficiency. The degree of fragmentation has a major effect on the efficiency of the loading and crushing operations. Getting such an information on the large pile of blasted rock is not an easy operation. This paper presents the results of case study to evaluate the performance of two types of tunnel blasting: V-cut and burn cut. The digital images of muckpiles were analyzed to produce size distribution and it was compared with those of predictive equations.

  • PDF

Numerical Study on the Reduction of Blast-induced Damage Zone (최외곽공 주변암반의 발파굴착 손상영역 저감에 관한 수치해석적 연구)

  • Park, Se-Woong;Oh, Se-Wook;Min, Gyeong-Jo;Fukuda, Daisuke;Cho, Sang-Ho
    • Explosives and Blasting
    • /
    • v.37 no.3
    • /
    • pp.25-33
    • /
    • 2019
  • Controlling the blast-induced damage zone(BDZ) in mining excavation is a significant issue for the safety of employees and the maintenance of facilities. Numerous studies have been conducted to accurately predict the BDZ in underground mining. This study employed the dynamic fracture process analysis (DFPA) to estimate the BDZ from a single hole blasting. The estimated BDZ were compared with the results obtained by Swedish empirical equation. The DFPA was also used to investigate the control mechanism of BDZ and fracture plane formation around perimeter holes for underground mining blasting.

BIM-based visualization technology for blasting in Underground Space (지하공간 BIM 기반 발파진동 영향 시각화 기술)

  • Myoung Bae Seo;Soo Mi Choi;Seong Jong Oh;Seong Uk Kim;Jeong Hoon Shin
    • Smart Media Journal
    • /
    • v.12 no.11
    • /
    • pp.67-76
    • /
    • 2023
  • We propose a visualization method to respond to civil complaints through an analysis of the impact of blasting. In order to analyze the impact of blasting on tunnel excavation, we propose a simulation visualization method considering the mutual influence of the construction infrastructure by linking measurement data and 3D BIM model. First, the level of BIM modeling required for simulation was defined. In addition, vibration measurement data were collected for the GTX-A construction site, terrain and structure BIM were created, and a method for visualizing measurement data using blast vibration estimation was developed. Next, a spherical blasting influence source library was developed for visualization of the blasting influence source, and a specification table that could be linked with Revit Dynamo automation logic was constructed. Using this result, a method for easily visualizing the impact analysis of blasting vibration in 3D was proposed.

Application of Digital Image Correlation Method for Measurement of Rock Pillar Displacement and Vibration Due to Underground Mine Blasting (지하 광산발파에 따른 암반광주의 변위 및 진동 측정을 위한 이미지 영상 상관법 적용연구)

  • Ko, Young-Hun;Seo, Seung-Hwan;Lim, Hyun-Sung;Jin, Tai-Lie;Chung, Moon-Kyung
    • Explosives and Blasting
    • /
    • v.37 no.4
    • /
    • pp.1-9
    • /
    • 2019
  • In this study the applicability of a Digital Image Correlation (DIC) method was investigated by measuring the displacement and vibration of rock pillar due to underground mining blasting. When combined with a high speed photography technology, the DIC method provides an excellent photographic image processing ability that can be used to convert the evolving full-field surface properties of structures to 2D or 3D set of coordinate values. The measured coordinate sets are then used to calculate the displacement, strain, and velocity of the target structure. This technique is widely used in science and engineering, and continuously finds its new application areas. In this study, the DIC system and the conventional seismograph were compared for their ability to measure the displacement and vibration produced by blasting. In the field test both methods showed similar results. Thus, it is concluded that the DIC method is feasible to measure the ground displacements and vibrations from blasting.

Propagation Characteristics of Ground Vibration Caused by Blast Hole Explosion of High Explosives in Granite (고위력 폭약의 화강암 내 장약공 폭발에 의한 지반진동 전파특성에 관한 연구)

  • Gyeong-Gyu Kim;Chan-Hwi Shin;Han-Lim Kim;Ju-Suk Yang;Sang-Ho Bae;Kyung-Jae Yun;Sang-Ho Cho
    • Explosives and Blasting
    • /
    • v.41 no.4
    • /
    • pp.29-40
    • /
    • 2023
  • Rock blasting is utilized in various fields such as mining, tunneling, and the construction of underground structures. The role of rock blasting technology has became increasingly significant with the growing utilization of underground cavity. Blast hole pressure, generated during rock blasting, is a critical variable directly impacting factors such as crushing and blast vibration. It stands out as one of the most important parameters for assessing explosive performance and predicting blasting effects. While blast hole pressure has been studied by several researches, comparisons are challenging due to variations in experimental conditions such as explosive type, charge, and blasting conditions. In this study, blast hole pressure sensors and observation hole pressure sensors were developed to measure pressure during single-hole blasting, The experimental results were then used to discuss the propagation characteristics of pressure around the blast hole and the corresponding blast vibration.

A study on full-face sequential blasting using electronic detonator (전자뇌관을 이용한 수직구 전단면 다단시차 분할 발파에 대한 연구)

  • Yoon, Ji-Sun;Kim, Su-Hyun;Bae, Sang-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.2
    • /
    • pp.177-184
    • /
    • 2008
  • In this study, in order to reduce appeals regarding vibration and noise from blasts, the optimum delay-time of the electronic detonator, which can minimize blast vibration, is found through blast-waveform composition and blasting simulation, and we have developed the full-face Sequential Blasting Method based on the studies of damping properties of full-face section blasting. The optimum delay-time of the electronic detonator and Full-face Sequential Blasting Method using electronic detonator was applied to the Gyeongbu high-speed railway construction site to test the feasibility of this method.

  • PDF

Investigation of Excavation Disturbed Zone Around a Tunnel by Blasting (발파에 의한 터널주변 암반 손상대 발생 평가)

  • Kwon, Sang-Ki;Cho, Won-Jin
    • Explosives and Blasting
    • /
    • v.25 no.1
    • /
    • pp.15-29
    • /
    • 2007
  • In situ and laboratory tests were carried out for investigating the Excavation Disturbed Zone(EDZ) generated from blasting at the KAERI Underground Research Tunnel(KURT), which is for the researches related to High-level radioactive waste disposal program. It was found that the EDZ was generated more than In from the laboratory rock tests and in situ experiments. RQD of the rock mass within $0{\sim}2(m)$, where the blasting impact was significant, was 17% lower than in the deeper zones without a serious blasting impact. It was also estimated that the deformability of rock mass was reduced about 40% after the blasting.

A Method of Explosion Modelling Using the Concept of Momentum Trap (모멘텀 트랩 개념을 이용한 폭원모델링 기법)

  • Choi, Byung-Hee;Kang, Myoung-Soo;Ryu, Chang-Ha;Kim, Jae-Woong
    • Explosives and Blasting
    • /
    • v.33 no.4
    • /
    • pp.7-13
    • /
    • 2015
  • Recently, as the demand for development and utilization of underground space is increasing worldwide, the blast damaged zone has become a major issue in constructing underground structures. In this study, to verify the explosion modelling method for blast-damaged zone (BDZ) around underground cavern, a series of small-scale test blasts was conducted using the concept of momentum trap. According to the test results, the input parameters to the numerical model (ANSYS LS-DYNA) were corrected. It is concluded that the suggested method of miniature blasting and numerical modelling using the MT concept well simulates the velocity of the MT projectile under given conditions.

Effects of free surface using waterjet cutting for rock blasting excavation (워터젯 자유면을 이용한 암반발파 굴착공법의 효과)

  • Oh, Tae-Min;Cho, Gye-Chun;Ji, In-Taeg
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.1
    • /
    • pp.49-57
    • /
    • 2013
  • The conventional blasting method generates serious blasting vibration and underbreak/overbreak in spite of its high efficiency for rock excavation. To overcome these disadvantages, this paper introduces an alternative excavation method that combines the conventional blasting process with the free surface on the perimeter of the tunnel face using waterjet cutting technology. This proposed excavation method has advantages of (1) reducing vibration and noise level; (2) minimizing underbreak and overbreak; and (3) maximizing excavation efficiency. To verify the effects of the proposed excavation method, field tests were performed with a smooth blasting method at the same excavation conditions. Test results show that the vibration is reduced by up to 55% and little underbreak/overbreak is generated compared with the smooth blasting method. In addition, the excavation efficiency of the proposed method is greater than that of the smooth blasting method. The proposed blasting method with a free surface using waterjet cutting can be applied to urban excavation construction as well as to underground structure construction.