Apportionment of Liquidated Damages and Compensation for Delay Damages in Domestic Construction Project : Analysis and Improvement (국내 현행 공기지연 책임에 따른 지체상금 및 손실보상의 문제점 및 개선방안)

  • Kim, Kyong Ju;Kim, Kyoungmin;Kim, Jong Inn;Wei, Ameng;Kim, Eu Wang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.12-20
    • /
    • 2023
  • To calculate the amount of owner-caused and contractor-caused delays based on a simplified delay analysis, which has been customarily used in Korea, has a limitation in reflecting the impact of the concurrent delay and the acceleration work. It also resulted in the apportionment of liquidated damages by applying the ratio of the number of delays between the owner and the contractor. This study analyzes that the conventional method does not meet the international standards. In order to improve the problem of construction delay analysis and the apportionment of liquidated damages based on it, owner delays, contractor delays, concurrent delays, and the impact of acceleration should be analyzed together. This study suggests that in the apportionment of liquidated damages, the extension of time should be extended by the sum of concurrent delays and the owner-caused delays, and liquidated damages should be imposed on delays incurred after the extension of time. It can be seen that it conforms to the international standards. The results of this study are expected to contribute to improving the problems of delay analysis and liquidated damages calculation, which have been conventionally accepted.

A Liquidated Damages Calculation Method Based on Owner's Substantial Loss (발주자 손실기반 지체상금 산정 개선방안)

  • Jang, Bong-Jo;Shim, Jae-Young;Koo, Jeong-San;Jung, Dae-Won;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.150-158
    • /
    • 2007
  • The delay of construction is one of the most frequent and complicated elements of the claim. And the liquidated damages cause many disputes during the judgement. The liquidated damages should be a compensation for owner's substantial loss, but actually be applied as a damage for breach of contract. These damages are different from owner's loss and give constructors a excessive burden. So we need a more reasonable system than a lump application system. In this study, we make a Improvement System, that based on owner's substantial loss, and suggest the new liquidated damages calculation method.

Analysis of Learning Activities of Mentally Retarded Students in Inclusive Middle School Science Classes (중학교 통합학급에서 과학 수업 중 정신 지체 학생의 학습 활동 분석)

  • Chang, Sang-Kyung;Yoo, June-Hee
    • Journal of The Korean Association For Science Education
    • /
    • v.29 no.5
    • /
    • pp.477-491
    • /
    • 2009
  • The purpose of this study is to analyze activities of mentally retarded students studying science within inclusive classes from the aspect of activity sharing to investigate ways of improving their involvement in the tasks. For this study, three mentally retarded students and their peer group in inclusive classes were observed and videotaped for 12 science class sessions about forces and waves. There were many cases in which task involvement of mentally retarded students changed according to three degrees of their activity sharing: well-synchronized, delayed and estranged. When degrees of activity sharing were estranged or delayed, task involvement of the mentally retarded students faded from activeness to passiveness. When the degree of activity sharing was well-synchronized, the mentally retarded students showed interest in learning and were able to participate in science class more actively. Different patterns of activity sharing of mentally retarded students between teacher-centered activities and student-centered activities were observed. In most cases of teacher-centered activities, the monotonous pace could deprive the mentally retarded students of their chance to catch up. As a result, their delayed degrees of activity sharing were faded into estranged degrees. In many cases of student-centered activities, various pacing according to the groups or students could provide mentally retarded students with a chance to catch up, so they could be well-synchronized. In one case of teacher-centered activity, the mentally retarded students were well-synchronized with the teacher's repeated explanations and well-matched illustrations on the blackboard and textbooks. In some cases of student-centered activities, students were well-synchronized with positive relations with and appropriate intervention by other students. In conclusion, various approaches to encourage activity sharing of mentally retarded students with normal ones should be pursued to improve task involvement and academic achievement of mentally retarded students.

On the Korea defense industry and defense procurement Liquidated Damages set upper limit research (국내 방산 및 군수조달분야의 지체상금 상한제 설정 방안 연구)

  • Min, Wonbae
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.17 no.4
    • /
    • pp.1034-1041
    • /
    • 2013
  • Liquidated Damages is damages that have to be paid when a debtor could usually work off that which they owe, but didn't due to causes imputable. However, currently the Defense Acquisition Program Administration contracts with domestic businesses in case of delay of implementation occurs; they have to pay damages of deferment unlimitedly as a penalty concept, not in compensation about delay. With this in account, conflicts between the two continuesly happen. DAPA wastes administration and counter business costs increasingly burdening their budget. Defense and military procurement need to revise the compensation of deferment system. This paper analyzes the problems about that system, which is applied to domestic business, and also compares it with that of industrialized countries and suggests measures of set price caps in compensation of the deferment system.

Empirical Formula of Delay Time for Groundwater Recharge in the Representative Watersheds, Jeju Island (제주 대표유역에 대한 함양지체시간의 경험식)

  • Kim, Nam Won;Na, Hanna;Chung, Il-Moon;Kim, Youn Jung
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.9
    • /
    • pp.743-752
    • /
    • 2014
  • Delay time for groundwater recharge means the travel time from the bottom of soil layer to groundwater through vadose zone after infiltration from rainfall. As it is difficult to measure delay time, we suggested an empirical formula which is derived by using linear regression between altitude and delay time. For the regression analysis, 4 major gauging watersheds were chosen (Hancheon, Kangjeongcheon, Oedocheon, Cheonmicheon) with 18 measured groundwater level stations. To verify this empirical formula, derived equation from linear reservoir theory was applied to compute delay time and to compare estimated amounts of groundwater recharge using both methods. The result showed good agreement. Furthermore, if derived empirical formula would be linked with SWAT model, the spatial time delay effect in the watershed could be reflected properly.

A Basic Study on the Improvement for Liquidated Damages at Construction Delay (지체상금 개선방안에 관한 기초연구)

  • Kook, Dong-Hoon;Son, Ki-Young;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.458-461
    • /
    • 2006
  • With the opening in construction market, more diversified and internationalized construction culture is imported, but the level of our construction culture and policy is still not met the international standards. For example, there is a difference in the liquidated damages at delay due to the reason of builder imputation during the public construction project comparing the international standards like damages. It may lead to the potential claim. In this study, via comparing and analysis on the relevant international standards and extension expense for terms of work, actual compensation is selected, and improvement of liquidated damages like damages is presented.

  • PDF

A Stochastic Analysis for Crack Growth Retardation Behavior and Prediction of Retardation Cycle Under Single Overload (단일과대하중하에서 피로균열진전지연거동 및 지연수명의 확률론적 해석)

  • Shim, Dong-Suk;Kim, Jung-Kyu
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.23 no.7 s.166
    • /
    • pp.1164-1172
    • /
    • 1999
  • In this study, to investigate the fatigue crack retardation behavior and the variability of retardation cycles, fatigue crack growth tests were conducted on 7075-T6 aluminum alloy under single tensile overload. A retardation coefficient, D was introduced to describe fatigue crack retardation behavior and a random variable, Z to describe the variability of fatigue crack growth. The retardation coefficient was separately formulated according to retardation behavior which is composed of delayed retardation part and retardation part. The random variable, Z was evaluated from experimental data which was obtained from fatigue crack growth tests under constant amplitude load. Using these variables, a probabilistic model was developed on the basis of the modified Forman's equation, and retardation behavior and cycles were predicted under certain overload condition. The predicted retardation curve well agrees with the trend of experimental crack retardation behavior. And this model well predicts the scatter of experimental retardation cycles.

Aflatoxin Poisoning (닭의 아프라톡신 중독)

  • 원송대
    • KOREAN POULTRY JOURNAL
    • /
    • v.10 no.8 s.106
    • /
    • pp.71-72
    • /
    • 1978
  • 여름철 가장 주의해야할 질병 중의 하나가 곰팡이병 이다. 특히 주의해야하는 것은 이 곰팡이병이 주로 사료로부터 오염, 중독된다는 사실이다. 부로일러의 증체지연 산란계의 산란율감소, 종계의 부화율 감소현상이 나타날 때 지체없이 자신이 쓰고 있는 사료를 유의해서 투시하자.

  • PDF

Arrival Delay Estimation in Bottleneck Section of Gyeongbu Line (철도선로용량 부족에 따른 지체발생 연구 - 경부선 서울~금천구청 구간을 대상으로)

  • Lee, Jang-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.4
    • /
    • pp.374-390
    • /
    • 2015
  • This research shows the relationship between the number of trains and the probability of trains with arrival delay and suggests way to estimate the benefits of improved punctuality in a bottleneck section of the Gyeongbu Line. The arrival delays of high-speed and conventional trains were estimated using the train operation data of KORAIL. Linear regression models for the probability of trains with arrival delay by train type are presented in this paper. The probabilities of trains with arrival delay were more affected by the number of conventional trains than by the number of high-speed rail trains. For the empirical analysis, a project for increasing the capacity in the Seoul~Geumcheongu office section was tested. The benefits of the improved punctuality were estimated to be 4.2~4.5 billion Korean won every year. This research has some limitations but it can help evaluate more precisely the feasibility of the project of increasing the capacity in bottleneck sections.

A case of two sisters births from mother with phenylketonuria lacking mental retardation (정신 지체가 아닌 페닐케톤뇨증 산모에서 출생한 자매 1례)

  • Ki, Chang-Seok;Kim, Jin Kyung
    • Clinical and Experimental Pediatrics
    • /
    • v.51 no.5
    • /
    • pp.546-550
    • /
    • 2008
  • In this untreated classic phenylketonuria (PKU) case, mental retardation is severe; however, there have been individuals- like the mother of this case- who have escaped mental retardation and all the other potential sequelae of phenylketonuria, despite having high blood phenylalanine levels, and very poor dietary control. It appears that they have nearly normal brain phenylalanine levels despite high blood phenylalanine (Phe) levels. A number of studies have now demonstrated considerable variability in blood vs. brain phenylalanine levels in phenylketonuria patients. Outcome of phenylketonuria appears to be related to brain phenylalanine levels. We report a case of "undiagnosed" maternal phenylketonuria syndrome. A female infant had low birth weight (2,400 g) with microcephaly. We examined her family and discovered that her mother was an undiagnosed phenylketonuria patient with a borderline intelligence quotient (IQ). The infant's sister, six years old, was diagnosed with phenylketonuria at the age of four years was mentally retarded and had received an operation for cleft lip and palate. the sister had also had a low birth weight (2,300 g). Her sister and mother were compound heterozygotes (mother: R243Q/Y325X; sister: Y325X/P407S). The infant and father were heterozygous carriers (baby: R243Q/ -; father: P407S/ - ).