• Title/Summary/Keyword: 지지케이블

Search Result 84, Processing Time 0.02 seconds

Vibration Control for Tower of Suspension Bridge under Turbulence using TMD (난류하에서의 TMD에 의한 현수교 주탑의 진동제어)

  • Kim, Ki Du;Hwang, Yoon Koog;Byun, Yun Joo;Chang, Dong Il
    • Journal of Korean Society of Steel Construction
    • /
    • v.9 no.2 s.31
    • /
    • pp.181-191
    • /
    • 1997
  • Before cables are constructed, tower of suspension bridge is behaved as a cantilever type. Buffeting occured by unsteady loading of the tower due to velocity fluctuation in the oncoming flow has a wind velocity consistent with fundamental frequency of the tower and may give rise to large response by the tower resonance. To reduce the dynamic response by buffeting, the behavior of tower with TMD(Tuned Mass Damper) has studied using finite element method in time domain. The buffeting was obtained by transforming the velocity spectrum in frequency domain to random variable in certain time domain. The most probable maximum displacement which can be occured during the time interval was obtained using peak factor. The optimum location for TMD installation and TMD specification were decided by parametric study. Also, the effect of vibration control about various wind velocity was studied by the TMD which has optimum specification and location.

  • PDF

Application of FRP-Concrete Composite Deck to Cable Stayed Bridge (FRP-콘크리트 합성 바닥판의 사장교 적용)

  • Cho, Keun-Hee;Park, Sung-Yong;Kim, Sung-Tae;Kim, Byung-Suk
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.217-220
    • /
    • 2008
  • A modified FRP-concrete composite deck applicable to cable stayed bridge with long girder-to-girder span is proposed, and its design and economical efficiency are presented. The existing FRP-concrete composite deck has low section stiffness due to adoption of GFRP panel with low elastic modulus, which arrives at difficulty in meet of serviceability limit such as deck deflection. So a new-type FRP-concrete composite deck, named precast FRP-concrete deck, is developed by extensioning concrete at the both ends of FRP-concrete composite deck, which brings the effect of reduction of net span length of deck. Compared to the existing FRP-concrete composite deck this modified deck has the advantage of increasing span length but slightly increases self weight. For this type of deck the section optimization is carried out for the cases of simply supported on girder and composite to girder. The optimized deck was applied to cable stayed bridge with a center span length of 540m, and as a result it is verified that PFC deck can be applied efficiently to cable stayed bridge due to reduction of quantity of upper structure.

  • PDF

A Numerical Study on Shear Behavior of the Interface between Blasted Rock and Concrete (발파 암반-콘크리트 경계면에서의 전단거동특성에 대한 수치해석적 연구)

  • Min, Gyeong-Jo;Ko, Young-Hun;Fukuda, Daisuke;Oh, Se-Wook;Kim, Jeong-Gyu;Chung, Moon-Kyung;Cho, Sang-Ho
    • Explosives and Blasting
    • /
    • v.37 no.4
    • /
    • pp.26-35
    • /
    • 2019
  • In designing a gravity-type anchorage of earth-anchored suspension bridge, the contact friction between a blasted rock mass and the concrete anchorage plays a key role in the stability of the entire anchorage. Therefore, it is vital to understand the shear behavior of the interface between the blasted rock mass and concrete. In this study, a portable 3D LiDAR scanner was utilized to scan the blasted bottom surfaces, and rock surface roughness was quantitatively analyzed from the scanned profiles to apply to 3D FEM modelling. In addition, based on the 3D FEM model, a three-dimensional dynamic fracture process analysis (DFPA-3D) technique was applied to study on the shear behavior of the interface between blasted rock and concrete through direct shear tests, which was analyzed under constant normal load (CNL). The effects of normal stress and the joint roughness on shear failure behavior are also analyzed.

A Study on Inductive Power Line Communication with Metal Block Channel (금속블록 채널이 있는 유도형 전력선통신에 관한 연구)

  • Sohn, Kyung-Rak;Kim, Hyun-Sik
    • Journal of IKEEE
    • /
    • v.25 no.1
    • /
    • pp.95-100
    • /
    • 2021
  • If we know the location of the hull block and the welding feeder in the shipyard, we can easily obtain the location information of the worker. That data is very useful for implementing a workplace safety monitoring system. However, it is difficult to apply a fixed communication network to the workplace due to the specificity of the hull structure and welding process. In this study, inductive power line communication, which can replace dedicated communication line, was reviewed. A ferrite core was used as an inductive coupler to be installed on the power cable of the welding machine, and a nano-crystalline core was applied as a coupler to be fastened to the support rod of the metal block. In order to visualize the operating principle of the proposed couplers, 3D modeling and finite element analysis were performed with the COMSOL AC/DC module. In the communication performance test using an aluminum profile, when the communication channel was formed by the contact of the welding electrode, the bandwidth was kept above 6 Mbps.