• Title/Summary/Keyword: 지보시스템

Search Result 71, Processing Time 0.027 seconds

PIV Measurement of Airflow in a Vertical Channel With Square Heat Source (정방형 발열체를 갖는 수직채널 내부의 공기유동 관한 PIV계측)

  • Bae, S.T.;Kim, D.K.;Kim, S.P.;Cho, D.H.;Lee, Y.H.
    • Solar Energy
    • /
    • v.17 no.3
    • /
    • pp.35-41
    • /
    • 1997
  • An experimental study was carried out in a vertical channel with square heat source by visualization equipment with laser apparatus. The image processing system consists of one commercial image board slit into a personal computer and 2-dimensional sheet light by Argon-Ion Laser with cylindrical lens and flow picture recording system. Instant simultaneous velocity vectors at whole field were measured by 2-D PIV system which adopted two-frame grey-level cross correlation algorithm. Heat source was uniform heat flux(5W). The obtained results show various flow patterns such as the kinetic energy distribution and the turbulent kinetic energy distribution.

  • PDF

Development of Ready-mixed Shotcrete II : Application Study (레디믹스트 숏크리트 개발 II : 적용성 평가)

  • Ma, Sang-Joon;Kim, Dong-Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5C
    • /
    • pp.187-202
    • /
    • 2011
  • In this Application Study based on the result of the Basic Study, the field test was performed to compare the quality of Ready-mixed shotcrete with that of the existing field mix shotcrete, and the long-term durability was evaluated as tunnel supporting. The plant manufacturing system was also designed to produce standardization materials, and the prototype products were produced with that system. The All-in-one silo mixer was designed and the field construction system using the All-in-one silo mixer was proposed to be most effectively applied Ready-mixed Shotcrete in construction fields. And the application of Ready-mixed Shotcrete was confirmed that more superior to the field mix Shotcrete by evaluating the Constructability and Economics.

A Study on Application for Deck Plate Substitute Type Wood System Form of Frame Type Parking Lot (골조형 주차장의 Deck Plate 대체형 목제 시스템 거푸집 적용성 연구)

  • Shin, Yong-Jae;Shin, Woon-Sik;Heo, Jae-Won;Lim, Nam-Gi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.123-126
    • /
    • 2006
  • Existing Deck Plate for a one of system forms, there is various advantage and application actual results increasing rapidly. But design of deck is depending on engineering data collections or design data on deck manufacture ordinarily. When construct, is responsible for deflection occurrence, And Because confirmation of crack occurrence region is impossible, there is difficulty of repair, reinforcement about crack and water leakage. According to got following conclusion as result that economic performance, preservation administration and repair reinforcement develops easy using steel truss snap tie by wedge pin on coating plywood that is slab Panel Wood System Form method of construction there is Deck Plate's advantage. (1) In stab lower part is exposed disjointing in which a criminal is fastened to be interrogated after construction acceptance and repair, reinforcement of crack is possible (2) Construction cost curtailment effect of about 29.2% than conventional type and about 10% than deck plate (3) Construction period reduction of about 3 day than conventional type and about 0.3 day than deck plate (4) Labor curtailment effect more than about $29{\sim}50%$ from conventional type

  • PDF

Flood Control Effects by Parallel Reservoirs System Operation (병렬저수지 연계에 의한 홍수조절효과)

  • Ryu, Jae-Uk;Choe, Hyeon-Il;Ji, Hong-Gi
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.342-345
    • /
    • 2010
  • 본 연구는 인접한 저수지 간의 연계운영을 통한 홍수조절 및 용수공급능력을 제고시키기 위한 저수용량 공유기법 개발의 일환으로 영주댐과 안동댐 및 임하댐의 병렬저수지 시스템을 연구대상으로 하였다. 홍수조절에 의한 병렬저수지의 연계운영기법으로서 병렬저수지 시스템인 영주/안동/임하댐 유역에서 홍수시 영주/임하댐의 저수량을 안동댐으로 전환시켜 영주/임하댐의 홍수조절능력을 제고시키고 안동댐의 저수량을 확보시켜 용수공급능력을 제고시킬 수 있는 방법을 연구하였다. 연구결과, 최적화계수(유량전환비:a)는 영주댐의 경우 1999년 9월 22일 ~ 26일 호우, 태풍 루사 및 태풍 매미일 때 모두 a=1.000, 임하댐의 경우 1999년 9월 22일 ~ 26일 호우, 태풍 루사 및 태풍 매미일 때 각각의 유량전환비는 $a_{1999}$=0.135, $a_{2002}$=0.372 및 $a_{2003}$=0.420으로 산정되었다. 영주댐에서 안동댐으로 그리고 임하댐에서 안동댐으로 전환할 수 있는 유량은 실제 호우적용시 전환유량은 매우 큰 것으로 확인되었다. 그리고 유량전환시 댐하류 안동, 지보, 달지지점에서 홍수 조절효과가 큼을 확인할 수 있었다.

  • PDF

Tunnel Overbreak Management System Using Overbreak Resistance Factor (여굴저항도를 이용한 터널 발파 여굴 관리 시스템)

  • Jang, Hyongdoo
    • Tunnel and Underground Space
    • /
    • v.30 no.1
    • /
    • pp.63-75
    • /
    • 2020
  • When tunnel is excavated via drilling and blasting, the excessive overbreak is the primary cause of personal or equipment safety hazards and increasing the cost of the tunnel operation owing to additional ground supports such as shotcrete. The practical management of overbreak is extremely difficult due to the complex causative mechanism of it. The study examines the relationship between rock mass characteristics (unsupported face condition, uniaxial compressive strength, face weathering and alteration, discontinuities- frequency, condition and angle between discontinuities and tunnel contour) and the depth of overbreak through using feed-forward artificial neuron networks. Then, Overbreak Resistance Factor (ORF) has been developed based on the weights of rock mass parameters to the overbreak phenomenon. Also, a new concept of tunnel overbreak management system using ORF has been suggested.

Flexural Performance Evaluation of Semi-slim floor Composite Beams for Reduction of Story Height (층고절감을 위한 반슬림플로어 합성보의 휨성능 평가)

  • Lee, E.T.;Lee, Sang Hoon;Jang, Bo Ra
    • Journal of Korean Society of Steel Construction
    • /
    • v.20 no.1
    • /
    • pp.165-173
    • /
    • 2008
  • In order to promote the practicality of high-rise steel buildings, the development of structural system which have the better fire resistance, the changeable plan, and the quality control of construction with general composite beams is needed. In this research, new semi-slim floor which the defect of general slim floor was complemented was evaluated to investigate the concrete integration with slim-flor beam and the flexural performance. 5 simply supported semi-slim floor beam tests were performed with parameters; structural form of slab support beam, slab thickness, with or without web opening, and shear connection. Experimental results showed that all specimen s had good ductile behavior.

Development of Mobile System Based on Android for Tunnel Face Mapping (터널 막장 매핑을 위한 안드로이드 기반의 모바일 시스템 개발)

  • Park, Sung Wook;Kim, Hong Gyun;Bae, Sang Woo;Kim, Chang Yong;Yoo, Wan Kyu;Lee, Jin Duk
    • The Journal of Engineering Geology
    • /
    • v.24 no.3
    • /
    • pp.343-351
    • /
    • 2014
  • Tunnel face mapping plays an important role in risk analysis and infrastructure support decisions during tunnel construction. In this study, a digital mapping system using a mobile device is employed instead of existing face-mapping methods that rely upon face mapping sheets. The mobile device is then connected to the main server in the field, where a tunnel-specific database is compiled automatically. This information provides real-time feedback on the tunnel face to construction personnel and engineers, thus allowing for rapid assessment of tunnel face stability and infrastructure needs. The Douglas-Peucker algorithm, among others, is employed to resolve problems arising from the detailed mapping and speed problem by data accumulation. This system is expected to raise program optimization through field verification and additional functional improvements.

Study on the Fuzzy Inference System for Objectivity of Ground Evaluation in Tunnelling (터널지반 평가의 객관화를 위한 퍼지추론시스템 연구)

  • 조만섭;김영석
    • Tunnel and Underground Space
    • /
    • v.13 no.1
    • /
    • pp.6-19
    • /
    • 2003
  • This study has for its object to increase an objectivity of the observation result in the face mapping of tunnel and to suggest the reasonable support and reinforcement methods to be considered the rock properties. It was developed in this study to the tunnel stability evaluation system(Prototype NFEST) to be used fuzzy set theory and neuro-fuzzy techniques, and this system was verified according to the reliability evaluation between the 36 learning data and the inferred results. When it summarized the results; (1) 12 evaluation items and ranges were proposed to be modified basis on the RMR which are well known to the domestic workers. (2) It was shown that correlation coefficient(│R│) between $RMR_{inf}$ inferred by 12 items and $RMR_{org}$ due to arithmetic total, $RMR_{chk}$ due to subjective judgement of observer are relatively high relationship with each 0.83 and 0.79. (3) Inferred result of the total tunnel safety shows also a good relationship with $RMR_{inf}$ (│R│=0.7) and the rock weathering(│R│=0.84).

Management and concept of the monitoring system considering the characteristics of subsea tunnels (해저터널의 특성을 고려한 계측 개념 및 관리 방안)

  • Park, Eui-Seob;Shin, Hee-Soon;Cheon, Dae-Sung;Jung, Yong-Bok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.5
    • /
    • pp.523-536
    • /
    • 2013
  • In order to ensure the safety of the subsea tunnel during its construction and operation, unlike the underground structures on land, the special monitoring system is essential which considers the characteristics of subsea tunnels in addition to conventional stress and displacement measurements applied to existing land tunnels. Therefore, the concept applied to NATM is reorganized to evaluate the stability of subsea tunnels. And the observation system for making a monitoring plan, the critical strain theory for tunnel safety management and MS monitoring methods for detecting the local failure and crack initiation of rock and supports, are introduced. Finally, the scheme of monitoring and management for subsea tunnels by using these methods is suggested.

Optimal Reservoir Operation Systems During Flood Season Considering the Downstream Effects (홍수기 저수지의 최적연계운영)

  • Han, Kun-Yeun;Kim, Keuk-Soo;Cho, Wan-Hee;Yook, Jong-Hwa
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.1708-1712
    • /
    • 2008
  • 본 연구에서는 낙동강 수계 안동댐과 임하댐의 홍수시 연계운영시스템을 구축하여 안동댐과 임하댐의 하류부인 안동시에서의 피해를 최소화하기 위해서 HEC-5모형을 이용한 모의기법을 통해 해석을 실시하였다. 모의운영을 실시하여 얻어진 결과를 FLDWAV모형에 적용하여 댐하류부의 홍수추적을 실시하였다. 홍수시 안동댐과 임하댐의 연계운영을 위해 안동댐과 임하댐에 대해서 각각 100년 빈도조건, 200년 빈도조건, PMF 조건, 200년 빈도와 PMF가 조합된 조건을 적용하여 분석을 실시하였다. 저류지 모의기법을 적용한 모의운영을 위해서 안동댐의 경우 안동댐 치수능력 증대사업 기본 계획보고서에서 제시된 일정률-일정량 방식의 댐 운영률을 이용하였고, 임하댐의 경우는 임하댐 치수능력 보고서에 제시된 일정률-일정량 방식을 적용하였다. 하류부 하천 제방의 여유고를 확보하기 위해 안동댐 운영의 대안으로서는 기존의 일정률을 조정하여 100년 및 200년 빈도하에서 기존 3,800m3/s를 3,490m3/s으로 최대 방류량을 변경한 100년 빈도조건, 200년 빈도조건, PMF 조건, 200년 빈도와 PMF가 조합된 조건을 적용 분석하여 댐의 방류량을 결정하였다. 댐 하류부의 홍수추적을 위해서 안동댐 및 임하댐 하류부로부터 지보수위표 지점까지의 53.9 km 구간에 대해서 FLDWAV 모형을 적용한 부정류 해석을 실시하였다. 댐 하류부에서의 시나리오별 홍수위를 산정하여 기존의 제방고와 비교함으로써 안동시 구간에서의 제방 안전성을 평가하였다.

  • PDF