Korean Journal of Construction Engineering and Management
/
v.9
no.6
/
pp.185-193
/
2008
As buildings become higher and larger, the possibility of accident also increases, and recurrent accidents and serious accidents are also increasing. However, it is not possible to control all the hazardous activities in construction site. Therefore, hazardous activities with higher possibility should be identified and prioritized in advance so engineers and managers can control the activities in safe manner. For this purpose, this research adopts FMEA technique, which has been widely utilized in manufacturing industry. In order to apply FMEA technique in construction safety management, the process of construction work is divided into sub-processes or activities. Then FMEA technique is applied to quantitatively analyze the importance of each activity from the safety perspective.
Park, Chan-Jong;Song, Ji-Won;Ryu, Jung-Ho;Kim, Chang-Duk
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.502-506
/
2006
For advanced construction safety, there frequently are repeated accident. Most of them are serious disasters which are continually concerned. But technical method of Safety organizations for construction project is still short, simple and unscientific. We suggest FMEA(Failure Mode and Effect Analysis) process on the safety management. The purpose of study is an establishment of safety system focused on scientific method by selecting priority unit and by figuring importance.
Korean Journal of Construction Engineering and Management
/
v.8
no.6
/
pp.159-166
/
2007
Work delay is one of the facts that make the reliability of construction projects decrease. Therefore, it is important to classify and prioritize the delay factors. This research analyzed key delay factors in apartment house construction through survey. The results of analysis are as follows. (1) Insufficient work force is the key delay factor in structural and finish work. (2) Improper craft of worker is the key delay factor in electrical work. (3) Incompletion of proceeding work is the key delay factor in mechanical work.
Proceedings of the Korea Water Resources Association Conference
/
2016.05a
/
pp.128-128
/
2016
전 세계적으로 물과 관련된 자연재해 피해가 지속적으로 증가하고 있고 세계재난데이터베이스(EM-DAT)에서 집계한 물과 관련된 중요한 자연재해의 피해액은 지난 50년 동안 많은 투자에도 불구하고 여전히 피해액이 증가되고 있다. 특히, 우리나의 경우, 전 국토의 70% 이상이 산악지형으로 구성된 지형적 요인, 인구 및 사회기반시설이 집중되는 도시지역의 확대 현상, 빈번히 발생되는 이상강우와 강우강도의 증가 등으로 전국 곳곳에서 큰 침수피해가 반복적으로 발생하고 있다. 이러한 도시침수의 저감대책을 마련하기 위해 정부부처에서 도시계획적 및 방재차원에서 관련 정책을 제시하고 있지만 실무적 측면에서 실효성이 낮은 실정이다. 이러한 문제점을 해결하기 위해 지자체 담당자의 업무부담을 줄여주면서 기술지원이 가능한 도시침수 위험도 관리시스템을 구축하고자 한다. 이에 따라 재해에 대해 평상시 위험도 정보를 기초로 시설투자, 개발계획 조정 등 사전대책을 마련할 수 있는 도시침수의 위험정도에 따른 지역 분석과 중점관리 대상지 선정 기준이 필요하다. 따라서 본 연구에서는 재해통계자료를 토대로 전국 226개 지자체에 대해, 최근 8년(2008~2014년) 간 발생된 호우 발생빈도와 피해액의 관계분석을 통하여 도시침수의 위험지역을 분류하였다. 국가재난정보센터의 재난통계기록의 호우발생횟수와 도시침수에 대한 피해정도를 고려하기 위해 건물과 공공시설에 대한 피해액을 분석항목으로 적용하였다. 이에 대한 도시지역의 침수발생에 대한 중점관리대상지 선정을 위하여 각 행정구역의 면적계수를 적용한 뒤 분위분석을 실시하였다. 호우 발생빈도와 피해액에 따라 위험도가 75% 이상으로 도시의 침수피해가 가장 높은 지역, 50% 이상이며 75% 미만인 지역, 25% 이상이며 50% 미만인 지역, 25% 미만으로 위험도가 가장 낮은 지역으로 도시침수 위험지역을 상세 분류하고 도시침수에 의한 중점관리가 필요한 대상지 35개 지역을 선정하였다. 본 연구의 결과는 지역의 도시계획 및 방재 측면에서 도시침수와 관련된 저감대책을 고려 시 기초자료로 활용 가능하고, 지자체별 지원 규모 설정 시 적정 기준제시가 가능할 것이다.
Proceedings of the Korean Institute of Building Construction Conference
/
2017.11a
/
pp.197-198
/
2017
Large spatial construction needs to consider various construction management factors through the construction guide, including high-tech roofing works for creating large space without columns and erecting large spatial structure. However, the domestic large spatial construction relies on overseas construction technologies due to the lack of construction guide of large spatial construction and experience in similar type of project. To improve the problem, we deduced principal items of construction management considering characteristics of large spatial construction as a preliminary study for developing a construction guide.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2003.05b
/
pp.115-118
/
2003
본 고에서는 현재 중국에서 추진되고 있는 고등교육 부문에 대한 진흥시책을 "211공정(工程)"을 중심으로 조망해보았다. 등소평의 중점대학 육성 구상에 따라 중국 국내의 제반 여건을 고려하여 "구오(九五)"기간 중에 개시된 "211공정(工程)"의 주요내용은 국가중점대학(國家重點大學)과 국가중점학과(國家重點學科) 건설 사업이다. 강역민(江澤民) 집권 후에는 "과교흥국(科敎興國)"을 기본국책으로 설정하여 교육부(敎育部)내의 과학기술사(科學技術司)에서 기지건설과 인재양성을 중점적으로 담당하면서 과학기술교육을 고등교육 발전의 기본축으로 삼아 적극적으로 추진하고 있다. 중국의 경우 이와 같은 국가 주도적인 진흥책을 중국공산당중앙위원회(중공중앙(中共中央))와 국무원의 방침 결정에 따라 집중육성(중점(中点)) 항목 결정 및 관리를 국무원 산하 유관부문이 상호 협조 하에 분담하여 지원하고 있다.
Kim, Jong Sung;Kim, Choong Ki;Yoo, Keunje;Hwang, Sang-Il
Journal of Environmental Impact Assessment
/
v.26
no.6
/
pp.457-469
/
2017
In order to conserve soil functions to the highest degree in development projects, it is necessary to identify and manage specific area (so called soil management area) including soils with good or excellent functions. Therefore, in this work, we conducted a preliminary study how to identify soil management area in environmental impact assessment on development projects. To do this, quantitative evaluation was carried out on two example projects, using InVEST model considering a couple of soil functions, i.e., erosion control and carbon sequestration functions. Then, soil management area was identified through overlay analysis. The methodology developed in this study is able to be used widely for more detailed analysis with high resolution and furthermore overlay anaysis with other assessment items. For more perfect assessment, other soil fuctions needed to be taken into account into our methodology.
이번 호부터 6회동안 중소기업의 경쟁력 강화 방안을 연재할 예정이다. 필자는 기술지도사로 광학업체를 비롯한 다양한 기업의 경영 진단$\cdot$지도 경험을 토대로 체계적인 조언을 해 합리적인 경영을 도울 것이다. 주제는 1. 경영자의 경영철학 및 수완, MIND 2. 생산관리 실시 현황(추진 조직, 생산 계획, 작업 실시 및 분배, 진도 관리, 자재 관리)3. 공정관리(공정관리 업무, 중점 관리 항목 관리, 공정 투입 시점 관리, 진
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.