• Title/Summary/Keyword: 준공모델

Search Result 52, Processing Time 0.033 seconds

Update of Digital Map by using The Terrestrial LiDAR Data and Modified RANSAC (수정된 RANSAC 알고리즘과 지상라이다 데이터를 이용한 수치지도 건물레이어 갱신)

  • Kim, Sang Min;Jung, Jae Hoon;Lee, Jae Bin;Heo, Joon;Hong, Sung Chul;Cho, Hyoung Sig
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.22 no.4
    • /
    • pp.3-11
    • /
    • 2014
  • Recently, rapid urbanization has necessitated continuous updates in digital map to provide the latest and accurate information for users. However, conventional aerial photogrammetry has some restrictions on periodic updates of small areas due to high cost, and as-built drawing also brings some problems with maintaining quality. Alternatively, this paper proposes a scheme for efficient and accurate update of digital map using point cloud data acquired by Terrestrial Laser Scanner (TLS). Initially, from the whole point cloud data, the building sides are extracted and projected onto a 2D image to trace out the 2D building footprints. In order to register the footprint extractions on the digital map, 2D Affine model is used. For Affine parameter estimation, the centroids of each footprint groups are randomly chosen and matched by means of a modified RANSAC algorithm. Based on proposed algorithm, the experimental results showed that it is possible to renew digital map using building footprint extracted from TLS data.

Research on Vibration and Noise Characteristics of Steel Plate Girder Bridge with Embedded Rail Track System (레일매립궤도 시스템이 적용된 판형교의 진동 및 소음특성에 대한 연구)

  • Park, Jeung-Geun;Koh, Hyo-In;Kang, Yun-Suk;Jeong, Young-Do;Yi, Seong-Tae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.1
    • /
    • pp.94-101
    • /
    • 2019
  • Most of the existing rail structures have undergone a lot of aging since a considerable period of time has passed from completion. In particular, among existing railway bridges, many of the plate girder bridges are older bridges that have lived 40 to 60 years or more. Since the treadmill is directly connected to the girder without the ballast, the running load of the vehicle is directly transmitted to the bridge. Therefore, the shock and noise applied to the bridge are larger than those of the ballast bridge, and the dynamic shock and vibration are also relatively large. Therefore, it is very urgent to develop appropriate maintenance, repair and reinforcement technology for existing steel plate bridge. In this study, the authors introduced the characteristics of embedded rail (ERS) developed for improving the performance of the existing plate girder bridge and the techniques solving the vibration and noise problems. In order to evaluate the vibration and noise reduction performance of ERS, a non-ballast plate girder bridge with 5m length of sleepers installed and a plate girder bridge with ERS were fabricated. And, then, the vibration response generated under the same excitation condition was measured and analyzed. Also, the radiated noise analysis was performed using the vibration response data obtained from the experiment as the input data of the acoustic analysis model. As a result of experiments and analyses, it was confirmed that the plate girder bridge's vibration using ERS was reduced by 15.0~18.8dB and the average noise was reduced by 7.7dB(A) more than the non-ballast bridge.

Construction of the Geological Model around KURT area based on the surface investigations (지표 조사를 이용한 KURT 주변 지역의 지질모델구축)

  • Park, Kyung-Woo;Koh, Yong-Kwon;Kim, Kyung-Su;Choi, Jong-Won
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.7 no.4
    • /
    • pp.191-205
    • /
    • 2009
  • To characterize the geological features in the study area for high-level radioactive waste disposal research, KAERI (Korea Atomic Energy Research Institute) has been performing several geological investigations such as geophysical surveys and borehole drillings since 1997. Especially, the KURT (KAERI Underground Research Tunnel) constructed to understand the deep geological environments in 2006. Recently, the deep boreholes, which have 500 m depth inside the left research module of the KURT and 1,000 m depth outside the KURT, were drilled to confirm and validate the results from a geological model. The objective of this research was to investigate hydrogeological conditions using a 3-D geological model around the KURT. The geological analysis from the surface and borehole investigations determined four important geologicla elements including subsurface weathered zone, low-angled fractures zone, fracture zones and bedrock for the geological model. In addition, the geometries of these elements were also calculated for the three-dimensional model. The results from 3-D geological model in this study will be beneficial to understand hydrogeological environment in the study area as an important part of high-level radioactive waste disposal technology.

  • PDF

A Study on GIS Implementation and Maintenance Model in Local Governments (지자체 GIS 추진 및 운영모델에 관한 연구)

  • Koh, Kwang-Chul;Kim, Eun-Hyung
    • Journal of Korea Spatial Information System Society
    • /
    • v.4 no.2 s.8
    • /
    • pp.5-22
    • /
    • 2002
  • The considerable budgets for the 2nd-phase NGIS projects are allocated to the projects for developments of the GIS applications. Especially, the 78 local governments are major users of GIS application systems. In spite of GIS necessity in local government, whether a GIS is 'good' or bad, depends on its implementation and operation. How to implement GIS in effective wav and how to measure GIS effect for justifying GIS funding can be major concerns. Because it takes minimum 3-4 years to equal the costs and benefits of GIS, the long-terms implementation strategies for GIS project in local government are required. In order to establish a proper implementation model for the GIS application projects and to promote activities in the projects, this study considers several problems in accordance with the phases of GIS evolution and solutions of these problems. Based an the GIS auditing and consulting experience in local governments, this study constructs a GIS implementation and maintenance model in long and comprehensive perspective. This model can be a key to affective and realistic implementation for the future GIS projects.

  • PDF

A Profit Prediction Model in the International Construction Market - focusing on Small and Medium Sized Construction Companies (CBR을 활용한 해외건설 수익성 예측 모델 개발 - 중소·중견기업을 중심으로 -)

  • Hwang, Geon Wook;Jang, woosik;Park, Chan-Young;Han, Seung-Heon;Kim, Jong Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.50-59
    • /
    • 2015
  • While the international construction industry for Korean companies have grown in market size exponentially in the recent years, the profit rate of small and medium sized construction companies (SMCCs) are incomparably lower than those of large construction companies. Furthermore, small and medium size companies, especially subcontractor, lacks the judgement of project involvement appropriateness, which leads to an unpredictable profit rate. Therefore, this research aims to create a profit rate prediction model for the international construction project focusing on SMCCs. First, the factors that influence the profit rate and the area of profit zone are defined by using a total of 8,637 projects since the year 1965. Seconds, an extensive literature review is conducted to derive 10 influencing factors. Multiple regression analysis and corresponding judgement technique are used to derive the weight of each factor. Third, cased based reasoning (CBR) methodology is applied to develop the model for profit rate analysis in the project participation review stage. Using 120 validation data set, the developed model showed 11% (14 data sets) of error rate for type 1 and type 2 error. In utilizing the result, project decision makers are able to make decision based on authentic results instead of intuitive based decisions. The model additionally give guidance to the Korean subcontractors when advancing into the international construction based on the model result that shows the profit distribution and checks in advance for the quality of the project to secure a sound profit in each project.

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

Development of Web-based Facility Management System by utilizing Information in Construction Phase (시공단계 정보 활용을 통한 웹 기반 유지관리 시스템 개발)

  • Bae Young-Min;Kwahk Kil-Jong;Kim Soo-Jung;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.99-106
    • /
    • 2004
  • Efficiency and efficient management on maintenance/repair/operation (MRO) phase is getting important with advance in technologies and complex functionalities of building and facility, Using software systems as well as advanced hardware systems in MRO area is spreading along with this trend to take advantage of information technology. Information of building and facility for MRO phase is derived from engineering/procurement/construction (EPC) phase. But most current commercial software systems in EPC and MRO are focusing on their own phase, which arise lack of consistency of information from EPC to MRO phase. But, the information system now used at the MRO phase stop flowing the building and the facilities information and then newly create. Moreover, from an asset management point of view, asset particulars such as the structures and equipments are different the value fluctuation. In order to reflect these information rationally, the construction costs are correctly distributed and the initial price of the asset particulars have to be estimated. In this study, develop the information model which can apply the cost information at the EPC phase to the MRO phase.

The Study on Application of Fast Track Method for Dam Project Life Cycle′s Analysis (댐 공사에서의 Fast Track을 적용한 생애주기분석에 관한 연구)

  • Yoon, Jae-Ho;Moon, Young-Il
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.5
    • /
    • pp.715-724
    • /
    • 2003
  • It is true that SOC facilities, such as dams, need long life cycles since more time has to be invested for the phases of planning, examination, feasibility study, design, contract, construction, and maintenance. This longer life cycle is easily exposed to the risk. And thus, brings additional cost by the delayed project, convenient loss according to the additional run of use, and benefit lose of not to using the facilities. So, the purpose of this study is to try to find a solution to reduce these time consuming problems which could diminish the whole national competition. Hence, this study is to show efficient, systematical project performance and network model by using reciprocal analyses between the construction period and cost based on economical analysis of each phase of life cycles. In addition, on the basis of these outputs, the Fast Track Method is suggested as an alternative solution as a new Approach in Life Cycle's Analysis.

A Study on the Maintenance Expenses of the Public Rental Rousing (공공임대주택 수선비 지출 실태에 관한 연구)

  • Kang, Hyun-Kyu;Han, Choong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.171-180
    • /
    • 2005
  • Public rental housing is constructed, owned, and managed by the public sector. The public institution for the public rental housing controls the whole building life cycle from the construction to the demolition. The construction company for the house built for sale is strongly interested in the cost for the initial investment, while the public institution is more focused on the maintenance cost for the preservation of the buildings Nevertheless, the maintenance cost of the public rental housing has been only managed as the accounting factor without the systemic research and analysis on the actual condition. This paper shows how expenses are related to the degree of obsolescence and presents the differences of the maintenance costs by the housing area and expenditure trends (vs time) of the maintenance costs, through analyzing time series data of public rental housing maintenance cost. Further, this paper helps understanding the causes of the differences of the maintenance costs by housing areas and characteristics of the expenditure trends. After all, this paper contributes to the improvement of the reliability and the practicality for the Life Cycle Cost modeling and the maintenance cost estimating.

Flow Characteristics through the Singok Submerged Weir in Downstream of the Han River (한강하류 신곡수중보의 흐름특성)

  • Kim, Su Jin
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.20-20
    • /
    • 2020
  • 신곡수중보는 한강종합개발사업(1982년~1986년) 중 하도정비로 인하여 상시 수위가 저하됨으로써 조수의 과도한 역류 등으로 발생하는 이수상의 문제점을 해결하고 상류에 설치된 잠실수중 보 사이의 수위유지 및 하천 공간 이용의 극대화, 연안 농경지의 용수공급 및 하천환경 보전을 목적으로 건설되어, 「잠실 및 신곡수중보 관리규정(1986)」 및 「신곡수중보 운영 매뉴얼」에 의해 관리·운영되고 있다. 신곡수중보는 준공된 이래로 한강하류의 흐름 해석에 있어 중요한 기준과 경계로서 이와 관련한 다양한 연구가 진행되었다. 신곡수중보로 인한 흐름의 변화가 하상과 생태에 미치는 영향에 관한 연구와 하구역에서의 조위 및 흐름특성과 밀도류의 거동에 관한 1, 2차원 수치해석연구가 활발히 진행되었다. 본 연구에서는 그동안 1, 2차원 수치해석연구로 한정되었던 신곡수중보 흐름특성에 관련하여 실제 수문 운영 방식을 반영한 3차원 수치해석을 수행하여 구조물의 상·하류에서 발생하는 와류 및 이차류와 같은 3차원적 흐름 구조와 이에 따른 지형의 침식·퇴적 및 구조물에 미치는 영향 등을 구체적으로 분석하였다. 우선, 신곡수중보 운영 매뉴얼과 실제 가동보 운영시스템을 비교하여 수문개방 시기, 유량 기준의 수문 운영 방법, 수위 변화에 따른 수문 운영 방법, 수문개방 순서를 분석하고 신곡수중보 주변 흐름에 대한 3차원 수치해석모형 구축을 위한 경계조건을 산정하였다. 수치해석에는 상용프로그램인 FLOW-3D를 사용하였으며, 경계처리기법 및 난류해석을 위해 FAVOR 기법과 RNG k-ε 모델을 적용하였다. 수문 동시개방 개수, 수문 개방 위치 및 순서, 개방 높이에 대한 조건을 변화시켜 구성한 시나리오에 대해 수치해석 후, 유속, 난류에너지, 이차류 등의 흐름특성을 분석하고 상·하류 수위차에 따른 방류량을 산정하여 시설물의 관리안을 도출하고 운영 매뉴얼의 개정안을 제시하였다.

  • PDF