• Title/Summary/Keyword: 주요업무 모델

Search Result 146, Processing Time 0.023 seconds

A Study on Procurement Information Management Model through the Analysis of Industrial Engineering Process (산업설비분야의 업무분석을 통한 구매관리 정보모델에 관한 연구)

  • Lee, Jung-Woo;Hwang, Doo-Won;Song, Young-Woong;Choi, Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.567-570
    • /
    • 2006
  • Recently because of rising of international oil prices, plant industry market has been active and purchase orders of big project are tending upwards. For strengthening of overseas plant competitive power and successful project operating, it is essential the project management technology and method. but procurement management of plant industry has evaluated uncompetitive. In this study, we analyzed the process of procurement founded and main contents and information. we study flowing of procurement information. user and creation time though detailing procurement information, then, we suggest the Contents Classification System and Management Model of Procurement Information.

  • PDF

Development of Management Systems based on IDEF3 Modeling to Improve Owner's Competency of Implementing Green building Certification (친환경건축물인증 발주자업무 수행역량 제고를 위한 IDEF3 모델기반 관리체계 구축)

  • Park, Kyung-Rog;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.52-62
    • /
    • 2013
  • Owners' efforts to acquire Green building certification, which started in 2002, have been rapidly increasing since 2006. The causes of the increased owners' interests are due to various incentives, legal obligation, and purpose of advertising. As project owners generally are deficient in capabilities and knowledge on how to deal with administrative works on certification, they tend to fulfill the minimum requirements for certification. However, effective administration process need capabilities of identifying individual making decision point and review information. The implementation of green building certification system is expected to provide comfort to both occupants and potential users. Furthermore it contributes to reducing energy costs throughout the phase of O&M. In addition, technology innovation in green industry can be obtained. Therefore, this study is intended to support owners in order that they can clarify certification tasks and make a rational decision-making in time. For this purpose, first of all, the major decision points were selected as the gateways of green building certification process. And then management system based on IDEF3 modeling was developed for supporting owners' decision-making performance. This management system will improve owners' overall capacity in handling all the tasks regarding the certification of Green building.

An User Interface Design Methodology Using Information Structure Model. (정보구조 모델을 이용한 WEB 환경 사용자 인터페이스 설계방법)

  • 배정미;박재년
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 1999.10a
    • /
    • pp.478-480
    • /
    • 1999
  • 웹(WWW)기술은 기존 클라이언트 서버환경의 정보 시스템을 그대로 활용하면서 TCP/IP프로토콜을 이용하여 인터넷기반의 분산시스템 환경을 제공한다. 웹 어플리케이션을 개발할 경우 기존의 어플리케이션 개발방법과 더불어 하이터미디어 형식으로 개발되어 지기 때문에 하이퍼어플리케이션 개발방법론의 적용이 요구되어진다. 그러나 단지 정보획득의 목적으로 사용되던 기존에 제안된 하이퍼미디어 개발방법론들을 웹 어플리케이션 개발에 그대로 적용하기는 미흡하다. 따라서 본문에서는 웹 어플리케이션 개발 과정중 논리적인 업무 프로세싱작업을 지원하면서 주요작업이 되는 하이퍼미디어 사용자 인터페이스 설계단계를 확장 지원하는 정보 구조 모델 방법론과 개발 프로세싱 절차를 제안한다.

  • PDF

Development of Business Process Model for Overseas Natural Gas Pipeline Project at the Project Planning Phase (해외 천연가스 파이프라인 사업 진출을 위한 사업계획단계 의사결정 프로세스 모델 구축)

  • Sin, Eonill;Han, Seung-Heon;Jang, Woosik;Lee, Yong-Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.473-481
    • /
    • 2012
  • Demand of Natural Gas (NG) consumption is continuously increasing by long service life and low environmental impact than other fossil fuels. Because of this reasons, Gas wells exploration and huge LNG plant construction project are being boosted world-widely. Especially, overseas NG pipe-line projects are emerging by considering safe and efficiency at the inter-country sections. At the same time, Korean contractors are being achieved to record-breaking performance at 2011's overseas construction market and 80% of new-record was attained from overseas plant construction projects. Nevertheless, Korean contractors are behind than overseas leading contractors by geographical distance from gas wells and concentrated demand for storage plant. In these reasons, this paper aims to develop the standardized business process model(BPM) for overseas NG pipe-line project at project planning phase to support the project entry. To this aim, first of all, extract the BPM through the broad literature and overseas construction market review and domestic/overseas pipe-line project analysis. Second, Test-bed was performed to confirm of practical applicability by 4 experts. And then 15 experts survey were performed to validate the usability and effectiveness of BPM for overseas NG pipe-line project. Consequently, if Korean contractors are using this BPM with their own know-how and experiences, it will be returned to more reasonable and rational references for decision making in overseas NG pipe-line project.

Analysis of Reform Model to Records Management System in Public Institution -from Reform to Records Management System in 2006- (행정기관의 기록관리시스템 개선모델 분석 -2006년 기록관리시스템 혁신을 중심으로-)

  • Kwag, Jeong
    • The Korean Journal of Archival Studies
    • /
    • no.14
    • /
    • pp.153-190
    • /
    • 2006
  • Externally, business environment in public institution has being changed as government business reference model(BRM) appeared and business management systems for transparency of a policy decision process are introduced. After Records Automation System started its operation, dissatisfaction grows because of inadequacy in system function and the problems about authenticity of electronic records. With these backgrounds, National Archives and Records Service had carried out 'Information Strategy Planning for Reform to Records Management System' for 5 months from September, 2005. As result, this project reengineers current records management processes and presents the world-class system model. After Records and Archives Management Act was made, the records management in public institution has propelled the concept that paper records are handled by means of the electric data management. In this reformed model, however, we concentrates on the electric records, which have gradually replaced the paper records and investigate on the management methodology considering attributes of electric records. According to this new paradigm, the electric records management raises a new issue in the records management territory. As the major contents of the models connecting with electric records management were analyzed and their significance and bounds were closely reviewed, the aim of this paper is the understanding of the future bearings of the management system. Before the analysis of the reformed models, issues in new business environments and their records management were reviewed. The government's BRM and Business management system prepared the general basis that can manage government's whole results on the online and classify them according to its function. In this points, the model is innovative. However considering the records management, problems such as division into Records Classification, definitions and capturing methods of records management objects, limitations of Records Automation System and so on was identified. For solving these problems, the reformed models that has a records classification system based on the business classification, extended electronic records filing system, added functions for strengthening electric records management and so on was proposed. As regards dramatically improving the role of records center in public institution, searching for the basic management methodology of the records management object from various agency and introducing the detail design to keep documents' authenticity, this model forms the basis of the electric records management system. In spite of these innovations, however, the proposed system for real electric records management era is still in its beginning. In near feature, when the studies is concentrated upon the progress of qualified classifications, records capturing plans for foreign records structures such like administration information system, the further study of the previous preservation technology, the developed prospective of electric records management system will be very bright.

Application Case Study on the BIM based Structural Design Process for Office Buildings (오피스 건물에 대한 BIM기반 구조설계 프로세스의 적용사례)

  • Shin, Tae-Song;Eom, Jin-Up
    • Journal of Korean Society of Steel Construction
    • /
    • v.24 no.3
    • /
    • pp.301-312
    • /
    • 2012
  • This paper studied the applicable case study on the BIM, based on a structural design process for office buildings. The design process and the applicable system are provided from the results of the research project on the system development of a virtual construction. The case study evaluated the work productivity and economic application of the process and the developed system. The study mainly takes steel structures into account. By using the structural analysis model and the basic design documents, it is able to create the basic construction model and the construction structural model. Likewise, the integrated model is built by IFC from the finished construction structural model. It checked the interoperability of the information among the various BIM design tools. The work environment was efficiently improved by establishing the BIM process, and work productivity could be increased with the help of the modeling automation for connections at the construction design stage.

Design and Implementation of the Quantity Surveying and Shop Drawing System for Structures (BIM 기반 골조 물량산출 및 도면생성 모듈의 설계와 구현)

  • Lee, Byung-Kwon;Kim, Chee-Kyeong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.132-135
    • /
    • 2011
  • 최근 설계 단계에서 설계품질 향상과 시공 단계에서 비용 절감을 효과를 기대하며 3차원 BIM 관련 기술에 대한 관심이 높아가고 있으며, 또한 부분적으로 기술 도입 효과가 나타나고 있다. BIM 기술은 크게 BIM 도구를 활용하여 설계정보를 디지털화하는 모델링 단계 기술과 BIM 모델로부터 설계 정보를 추출하여 업무 진행에 필요한 형태로 가공, 변환하는 정보 활용 기술로 구분하여 생각할 수 있다. BIM 기술에 대한 근자의 높은 관심에도 불구하고 실제 현장에 적용되어 가시적인 성과를 내는 데에 한계를 보이고 있는 이유 중 하나로 후자의 정보 추출 및 활용 기술의 범위와 완성도의 한계를 들 수 있다. 즉 많은 노력을 통하여 BIM 모델을 구축하더라도 이를 기반으로 물량산출, 도면 생성 등 가장 기본적인 업무조차도 현장에서 바로 사용할 수 있는 수준의 기능이 제공되고 있지 않다. 본 연구에서는 건축 골조를 대상으로 3차원 골조 모델을 이용하여 골조 물량, 특히 정확한 물량산출이 상대적으로 어려운 철근에 대하여 철근의 이음, 정착 등이 고려된 실행물량을 산출할 수 있는 시스템을 설계하고 구현하였다. 또한 3차원 모델을 기반으로 철근 배근시공도와 가공일람표를 관련 기준에 따라 정확히 자동 작성함으로써 골조공사가 효율적으로 수행되고, 특히 정확한 이음 및 정착과 가공 계획을 통하여 철근 손실율을 최소화함이 기대된다. 본 논문에서는 이러한 BIM 기반 골조 물량산출 및 도면생성 시스템과 관련하여 주요 시스템 설계 내용과 구현 결과에 대하여 기술한다.

  • PDF

A study on the Optimal Disaster Reduction Program for Industrial Disaster Early Response (산업체 재난 조기대응을 위한 최적재해경감방안 연구)

  • Lee, Keun-Jae
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2010.10a
    • /
    • pp.211-215
    • /
    • 2010
  • 본 연구는 아직 초보수준인 국내기업의 업무연속성 유지를 위한 재해경감 활동계획 수립 및 실행에 대한 방향을 제시하였으며, 조기대응체계 구축을 통하여 어떠한 재난에도 안전을 기할 수 있는 기업 연속성 유지 방안을 모색하였다. 이를 실현하기 위하여 국내 재난관리 표준으로 채택된 사고대비 및 업무연속성관리 가이드라인을 분석하였고, 국내기업에 쉽게 적용할 수 있는 실행지침을 제시하였으며, A기업을 대상으로 재해경감활동계획수립 및 정보기술을 활용하는 방안을 연구하였다. 특히 사고대비 및 업무연속성관리의 가이드라인 5단계 주요 절차 중 계획수립단계의 위험 평가, 영향분석, 예방경감계획 및 대응관리계획 수립에 대한 모델을 제시하였고 국내 재해경감활동이 활성화되기 위한 방안을 도출하였으며, 재난대응 수준을 향상시키기 위하여 필요한 정보기술 부분도 제시하였다.

  • PDF

A Systematization Model of the Design Phase VE Selection by the Analysis of the Required Items in the Apartment (공동주택 설계VE의 요구항목 분석을 통한 대상선정 체계화 모델)

  • Jung, Ho-Geun;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1015-1018
    • /
    • 2007
  • VE is one of the most effective and systematic tool available to achieve the required function at minimum cost and manage in many industrial fields. The purpose of the preparation phase VE job plan is to establish a cooperation system referring to groups for the successful implementation of VE, and to achieve a common objective to collect sufficient materials required in the analysis phase. The Quality Model is used to measure the requirement of shareholders(users and owners)in the project. It also offers a guideline on decision making when executing the function definition, function arrangement, function evaluation, and the idea evaluation of VE. However, the current the preparation phase business confirms that the required items of owners and users has not suggested definite goals and directions. This study analyzes the problems of current work in the preparation phase from case study, survey and interviews of experts. It then proposes a new process after understanding the required items of owners, users and experts.

  • PDF

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.