A Layout Planning Optimization Model for Finishing Work (건축물 마감공사 자재 배치 최적화 모델)

  • Park, Moon-Seo;Yang, Young-Jun;Lee, Hyun-Soo;Han, Sang-Won;Ji, Sae-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.43-52
    • /
    • 2011
  • Unnecessary transportation of resources are one of the major causes that adversely affect construction site work productivity. Therefore, layout related studies have been conducted with efforts to develop management technologies and techniques to minimize the resource transportation made at site-level. However, although the necessity for floor-level layout planning studies has been increasing as buildings have become larger and floors have become more complicated, studies to optimize the transportation of materials inside buildings are currently not being actively conducted. Therefore, in this study, a model was developed using genetic algorithms(GA) that will enable the optimization of the locations of finishing materials on the work-floor. With the established model, the arrangement of diverse materials on complicated floors can be planned and the optimized material layout planning derived from the model can minimize the total material transportation time spent by laborers during their working day. In addition, to calculate travel distances between work sites and materials realistically, the concept of actual travel distances was applied. To identify the applicability of the developed model and compare it with existing methodologies and analyze it, the model was applied to actual high-rise residential complexes.

A Productivity Analysis Method of Curtain Wall Works Using Construction Simulation (건설 시뮬레이션을 활용한 커튼월 적층공법의 생산성 분석방안)

  • Park, Dong-Geun;Lee, Kyung-Suk;Yu, Byung-In;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.256-261
    • /
    • 2008
  • The curtain-wall work has been more frequently applied in the construction industry since demand of high-rise buildings has been increased. The curtain-wall work is usually performed with the frame work simultaneously for reducing construction period, but it might be delayed because of several problems caused by interference of process. However, there is not an appropriate tool which can be used by a work manager for adjusting quantity of the construction equipments or the workers when the curtain-wall work was delayed. To resolve this problem a construction simulation anticipating and analyzing potential problems before starting the work can be applied in the curtain wall work. This research suggests a general model for the curtain-wall work by using construction simulation and produces a combination of construction equipments and workers which can estimate optimum work productivity.

  • PDF