• Title/Summary/Keyword: 종합설계

Search Result 1,822, Processing Time 0.028 seconds

외기환경 노이즈에 대응한 초정밀 가공기의 설계기술

  • 이찬홍
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.41.3-41
    • /
    • 2004
  • 본 발표에서는, 요사이 고품질의 광학부품을 가공할 때 의외의 가공현상으로 거의 완성된 부품을 폐기하는 사례에 [H해 근본적인 초정밀 가공과 문제점에 대해 분석하였다. 초정밀 가공기와 가공공정 그리고 외기환경에 대한 종합적인 분석을 통해 의외의 가공현상을 예측 가능한 가공현상으로 변화시키는 기술적 분석방법에 대해 독일 공작기계관련 박사학위논문을 기반으로 자세히 설명한다. 초정밀 가공기의 설계는 기계설계, 가공공정 설계 그리고 환경설계까지가 범위이다.

  • PDF

A Study on the Integrated Logistic Support of Force Support System (전력지원체계의 종합군수지원 연구)

  • Lee, Young Uk
    • Convergence Security Journal
    • /
    • v.16 no.3_1
    • /
    • pp.77-85
    • /
    • 2016
  • Integrated logistics support activities is to comprehensively manage the logistic support elements in the whole pro cess, from the design, development, acquisition request from the time it takes, operating and disposal for the efficient and cost-effective logistics support equipment. In other words, maintain the performance of the weapon system, and is required to be filed from the time the economic comprehensive logistic support until discarded activities, managing all logistic support throughout the life cycle period. This study was an intensive study for a seamless integrated logistics support force support system, the result wa s determined that the insufficient number of parts to the weapons sector, presents some development direction for se amless integrated logistics support force support system and should.

A Study on Overall Measurement System Development of HEMU-400X (HEMU-400X 종합계측시스템 개발에 관한 연구)

  • Ryu, Sang-Hyun;Hong, Jun-Hee
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.6
    • /
    • pp.484-488
    • /
    • 2011
  • Technologically advanced railway countries had a unique ability to design, test and evaluation systems for development of High-speed train system. To evaluate the performance of the train system in Korea for the development of advanced measurement technology and systems are needed. In this study, the Overall Measuring System(OMS) is going to be established to efficiently verify the performance, stability and reliability of the train system and the components, and verify of the maximum speed though an on-line test. OMS consist of vehicle measuring system, pantograph measuring system, video monitoring system and monitoring room was constructed for the overall measuring system and monitoring system. The results of this study were expected to contribute to technical improvement for evaluation of train system.

현상설계경기

  • Korea Institute of Registered Architects
    • Korean Architects
    • /
    • no.2 s.394
    • /
    • pp.92-105
    • /
    • 2002
  • PDF