• Title/Summary/Keyword: 조립체

Search Result 539, Processing Time 0.029 seconds

Performance Test of a 7 tonf Liquid Rocket Engine Turbopump (7톤급 액체로켓엔진용 터보펌프 조립체 성능시험)

  • Kwak, Hyun Duck;Kim, Dae-Jin;Kim, Jin-Sun;Kim, Jinhan;Noh, Jun-Gu;Park, Pyun-Goo;Bae, Jun-Hwan;Shin, Ju-Hyun;Yoon, Suck-Hwan;Lee, Hanggi;Jeon, Seong-Min;Jeong, Eunhwan;Choi, Chang-Ho;Hong, Soon-Sam;Kim, Seong-Lyong;Kim, Seung-Han;Han, Yeong-Min
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.19 no.2
    • /
    • pp.65-72
    • /
    • 2015
  • Performance tests of a turbopump for the developing 7-tonf liquid rocket engine were conducted. The performance of turbopump components and their power matching were measured and examined firstly under the LN2 and water environment. In the real propellant(LOX and kerosene) environment tests, design and off-design performances of turbopump were fully verified. During the off-design tests, turbopump running time was set the same as engine operating time and pump inlet pressure were set lower than nominal operating value in order to investigate pump suction capability. It have been verified that subject turbopump satisfies required performance - flow rate, head, suction performance and operational time - in the operating regime of developing liquid rocket engine.

The Launch of the COMS by Ariane-5 Launch Vechicle (아리안-5 발사체를 이용한 통신해양기상위성 발사)

  • Lee, Ho-Hyung;Kim, Bang-Yeop;Choi, Jung-Su;Han, Cho-Young
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.36 no.3
    • /
    • pp.291-297
    • /
    • 2008
  • The launch of the COMS by using Ariane-5 launch vehicle is introduced. First, the COMS is introduced briefly, and then, the Ariane-5 launch vehicle is introduced including detail description of the improvement of Vulcain-1 engine of Ariane-5G to Vulcain-2 engine of Ariane-5ECA for 20% increase of thrust. Then, the launch process of the COMS is introduced. The COMS will be launched from the Guiana Space Center in Kourou, French Guiana. After the final check at PPF the COMS is transferred to HPF in the same building for fueling, and it is integrated to the launch vehicle adaptor at HPF, too. Then, this assembly is transferred to Final Assembly Building. After the satellites to be launched together are integrated to the launch vehicle on the launch table in the Final Assembly Building, the launch table loaded with the launch vehicle is moved to the launch pad for launch. The events during the launch vehicle flight is also introduced.

A Study on Operational Concepts on Final Assembly-Transportation-Erection Methodology of Launch Vehicles (발사체 총조립-이송-기립 운용개념 변화에 대한 연구)

  • Daerae Kim;Chankyoung Lim;Seongpil Yang;Yeongho Lee
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.26 no.5
    • /
    • pp.52-62
    • /
    • 2022
  • A launch vehicle is a one of the biggest hardware among the products of human technology. For huge size launch vehicles, to transport to Launch Complex and to erect on launch pad precisely and safely is very critical issue. Therefore, a final assembly, transportation, erection and holding in vertical position in launch pad requires very precise operational technology, processes and related aggregates. Those operational concept has been developed to comply with the requirement of each launch vehicle and technology level at that time. In this paper, a progress of operational methodology in global launch vehicles are described. In addition, methodologies used on the KSLV-1 Naro and the KSLV-II Nuri launch vehicle are introduced.

A Conceptual Information Model of Mechanical Assemblies Incorporating Assembly and Kinematic Constraints, and Tolerances (조립 및 기구학 구속 조건, 공차를 포함하는 기계 조립체의 개념적 정보 모델)

  • Han Y,-H.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.10 no.2
    • /
    • pp.133-142
    • /
    • 2005
  • This paper proposes an object-oriented conceptual information model of mechanical assemblies, named open assembly model (OAM). The proposed assembly model primarily defines hierarchical relationships between parts and subassemblies. Together with the assembly hierarchy. the model also provides a way to represent tolerances, kinematic information, and parametric assembly constraints. Relational information such as mating conditions and degree of freedom between parts and subassemblies is captured via assembly features and relationships thereof. The information model is described using class diagrams of the Unified Modeling Language (UML), and instance diagrams are used to exemplify the proposed information model. The conceptual model presented in this paper is an integrated information model for assembly representation, which could supply necessary information for tolerance analysis and synthesis, kinematic simulation, and assembly simulation. Such a conceptual information model plays an important role for the exchange of information between modeling, analysis and planning systems. Hence, the proposed model could serve as a framework for developing data exchange standards of mechanical assemblies. The proposed model is demonstrated through a case study of a planetary gear assembly.

우주발사체 개발을 위한 발사대 케이블마스트(CABLE MAST) 사례조사

  • Lee, Jeong-Ho;Lee, Yeong-Ho;Kim, Yong-Uk;O, Seung-Hyeop
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.37 no.2
    • /
    • pp.152.2-152.2
    • /
    • 2012
  • 우주발사체 발사를 위해서는 발사대시스템 개발이 필수적이다. 발사대시스템은 기계설비와 추진제공급설비, 관제설비로 구성되며, 그 중 기계설비는 발사지지대(Launch Pad), 이렉터(Erector), 트랜스포터이렉터(Transport-Erector), 케이블마스트(Cable-mast), 자동체결장치(Auto-coupling Device) 총 다섯 부분으로 나눌 수 있다. 발사지지대는 발사 전까지 발사체를 지지하는 구조물로 발사체의 안전을 보장하고 공급배관 및 통신라인의 경로를 제공한다. 이렉터는 발사준비과정에서 수평으로 이송된 발사체를 2개의 대형 유압실린더를 사용하여 기립시키는 장비로 발사 취소 시 발사체를 수평으로 전환한다. 트랜스포터이렉터는 조립공간에서 조립을 마치고 최종점검이 완료된 발사체를 전용차량을 이용하여 발사대로 이동하고 발사체를 안전하게 잡아준다. 자동체결장치는 지상으로부터 발사체로 연결되는 추진제, 압축가스 등의 연결배관을 자동으로 연결/분리하는 장치이다. 케이블마스트는 우주발사체 상단부의 UCU-E(Umbilical Connectors Unit-Electrical)를 통해서 전기, 고압가스, 고온공기 등을 공급하기 위한 통로로 발사 전까지 발사체시스템과 지상장비와의 통신수단이다. 또한 발사체로 연결되는 라인들을 발사 시에 나오는 후류에 의한 충격으로부터 보호하고, UCU-E가 기계적으로 분리되도록 구성되어 있다. 본 논문은 기존에 적용된 케이블마스트에 대한 구성, 기능 및 운용절차에 관한 것으로, 현재 진행 중인 한국형발사체 개발을 위한 기초 자료조사로 활용하고자 한다.

  • PDF

중대형 위성의 조립 및 시험을 위한 기계지상지원장비 개발

  • U, Seong-Hyeon;Kim, Jin-Hui
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.37 no.2
    • /
    • pp.183.2-183.2
    • /
    • 2012
  • 최근 인공위성의 대형화 및 중량화 추세는 종종 기존 설비 내에서의 위성체 조립 및 시험업무의 작업성과 능률성을 심각하게 저해하는 요소로 작용한다. 이에 상기 업무의 원활한 수행을 위해서는 최적화된 설계의 기계지상지원장비(Mechanical Ground Support Equipment, MGSE)의 개발 및 활용이 요구되어지며, 이는 전체 위성개발기간 동안 요구되는 모든 시험 구성, 외부 설비 및 장비와의 인터페이스, 작업자의 동선 및 접근성 등을 종합적으로 고려해야 하는 작업이다. 특히 고해상도 영상안테나와 같이 높은 수준의 정렬 조건이 부과되는 탑재체의 경우 이의 장착, 정렬 및 지상전개시험 등을 위해서는 탑재체 및 위성체의 특성을 고려한 전용 장비의 개발도 필수적이다. 본 논문에서는 한국항공우주연구원이 최근 개발한 중대형급 지상관측 영상레이더 위성 개발 과제에 활용된 기계지상지원장비의 설계, 제작 및 운용 방법을 종합적으로 기술하였다.

  • PDF

燃料油中 황분이 실차기관에 미치는 영향 시험연구

  • 최희준;이필재
    • Tribology and Lubricants
    • /
    • v.2 no.1
    • /
    • pp.18-29
    • /
    • 1986
  • 한국철도에서는 현재 약 450냥에 가까운 Diesel 기관차를 보유하고 있으며 기관의 정밀검사를 위한 Enginer의 Overhaul은 2Y검사로 2년마다 실시하고 있다. 원래 Engine의 Overhaul 주기간격은 Liner Bore와 Piston Ring 등 동력장치 조립체의 구성부품의 체험적인 마모율을 감안하여 결정되며 가장 경제적이면서도 무장애운행을 가능케 하는 것은 마모율이 최저로 유지되고 있을 때이다. 따라서 기관의 마모를 최대로 억제하는 것이 바람직하다.