• Title/Summary/Keyword: 조립라인

Search Result 218, Processing Time 0.042 seconds

A Process Improvement of the SMPS Assembly Line Using Motion Study and Line Balancing Techniques (동작 연구 및 라인 발란싱을 활용한 SMPS 조립라인의 공정개선 사례)

  • Lee, Sang-Young;Hong, Sung-Hoon;Kim, Jin-Hwan
    • IE interfaces
    • /
    • v.11 no.3
    • /
    • pp.155-166
    • /
    • 1998
  • The productivity and quality are most challenging problems facing all companies. This paper presents a process improvement of the SMPS(switching mode power supply) assembly line through elimination of unnecessary operations, a proper factory layout, motion study, and line balancing techniques. The proposed assembly line increases the productivity by 23.9%, and decrease the proportion of nonconforming items by 48.9%.

  • PDF

A study on line balancing for serial assembly line (직렬 조립라인의 라인밸런싱에 관한 연구)

  • 장석호;이노성;안인석;박승규;최준열;우광방
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1993.10a
    • /
    • pp.1123-1128
    • /
    • 1993
  • In this paper, utilizing the line balancing algorithm proposed to deal with various situations of automated assembly line, the optimal solution can be derived by the branch and bound method of analysis. By the application of line balancing algorithm to telephone assembly line, thoughput is improved by 3.38%. Therefore, in the proposed line, blicking phenomena were reduced and smooth line-flow was achieved, and uniform distribution of utilization rate of each machine is obtained.

  • PDF

A Case Study of Virtual PLC Validation System’s Implementation : In Case of An Automobile Trim Line (가상 PLC 검증 시스템의 구현 사례 : 자동차 의장 라인의 예)

  • Bae, Seong-Hun;Kim, Yearn-Min
    • Journal of the Korea Society for Simulation
    • /
    • v.19 no.2
    • /
    • pp.9-16
    • /
    • 2010
  • This study presents a system for validating the PLC code in the virtual environments of automobile trim line. There have been considerable efforts to develop standard PLC editors for saving human power and PLC test time. However, it was difficult to apply the PLC editor on a real shop floor environment. A virtual equipment was developed to communicate with the PLC module of a shop floor and to make up the connectivity environment by a special protocol. We can validate the code without launching real equipments because the PLC module and the virtual equipment is able to be controlled in real time by the OPC protocol. An experimental model is applied to the final assembly line of an automotive industry and validated by using DELMIA Automation. In conclusion, the system is valuable in the process of PLC codes validation and virtual equipments operation. This system would reduce the development time of the PLC codes and improve the productivity and the integrity of the PLC codes.

A Simulation Study on the Automobile Front End Module Supply Chain System (시뮬레이션을 이용한 자동차 Front End Module 공급시스템 개선 방안)

  • 박창권;한상덕
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.863-868
    • /
    • 2003
  • 최근 자동차 제조업체들은 치열한 국제경쟁시대에 생존하기 위하여 원가 절감 및 개발기간 단축, 품질 향상을 위하여 모듈화라는 새로운 자동차 생산 방식을 적용하고 있다. 본 연구에서는 자동차 모듈화 부품의 한 종류인 Front End Module (FEM)을 대상으로 생산시스템 계획단계에서 대상 부품의 직서열 공급시스템 적용 가능성을 컴퓨터 시뮬레이션 기법을 적용하여 입증하고, 직서열 공급시스템 운영방안을 제시하여 물류비용을 절감하고자 한다. 연구 대상인 완성차업체의 의장라인과 모듈 업체의 조립라인 및 모듈 공급시스템을 모델링하여, FEM 공급시스템을 운영 방안별로 시뮬레이션을 통하여 직서열 공급시스템의 적용 가능성을 입증하고, 운반 차량의 적정 소요 대수 및 FEM 운반용 캐리어 대수를 제시한다.

  • PDF

A Case Study of Simulation for the Design of Crankshaft Line in an Automotive Engine Shop (자동차 엔진공장의 크랭크샤프트 라인설계를 위한 시뮬레이션 사례연구)

  • Moon, Dug-Hee;Xu, Te;Shin, Woo-Young
    • Journal of the Korea Society for Simulation
    • /
    • v.17 no.2
    • /
    • pp.1-12
    • /
    • 2008
  • The major components of an engine are the cylinder block, cylinder head, crankshaft, connecting rod, and camshaft, which are more popularly known as the 5 C's. Thus, the engine shop usually consists of six sub-lines, including five machining lines and one assembly line. The flow line is the typical concept of the layout when the engineer designs the engine shop. This paper introduces a simulation study regarding the new crankshaft machining line in a Korean automotive factory. The major factors for designing the machining line are considered, and their effects on the system performance are evaluated with a three-dimensional(3D) simulation model that is developed with $QUEST^{(R)}$. The initial layout is analyzed using the simulation model, and we suggest some ideas for improvement.

  • PDF

Development of robot system for production line automation (생산라인 자동화를 위한 로봇 시스템 개발)

  • Mim, Byeong-Ro;Kim, Duck-Ki;Jun, Yoo-Hea;Jung, Jun-Hee;Lee, Hwen;Yoo, Su-Ho;Cha, San-Lee;Lee, Dae-Weon;OH, Se-Bu
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 2017.04a
    • /
    • pp.149-149
    • /
    • 2017
  • 본 논문은 생산라인 자동화를 위한 로봇으로 제조업 시장 확대에 가장 큰 걸림돌이 되는 가격 경쟁력 및 인력난 해소를 위해 설계하였으며 다양한 소재에 대응하기 위해 그리퍼를 교체하여 적용이 되도록 하였다. 자동화를 위한 로봇은 소재의 내외경 가공 및 검사까지 모든 공정이 일괄적으로 이루어 져야하며 LCD 모니터에 생산수량 및 불량률 등의 정보를 실시간으로 나타내어 효율적인 생산계획을 수립할 수 있도록 하였다. 생산라인 자동화를 위해 로봇의 설계는 Auto CAD를 이용하였다. 부품의 가공은 CNC에 적용하기 위해 자동공급장치를 설계하였다. 가공이 완료된 후 측정한 값을 LCD모니터를 통하여 작업자가 알아볼 수 있게 나타냈다. 외경 1은 40.405, 외경2는 32.201, 내경 1은 23.346, 내경 2는 34.302로 나타났다. 측정결과 불량 측정을 위해 측정부의 결과 값이 나타나며 불량이 발생하면 그래프를 이용하여 어떤 부위에서 발생했는지를 알 수 있도록 하였다. 또한 결과 값은 자동으로 저장되도록 하였다. 생산라인 자동화를 위해 100EA를 측정한 결과 외경 1은 40.40438, 외경2는 32.20164, 내경 1은 23.34830 내경 2는 34.30033의 평균값을 나타냈다. 측정값의 검증은 하이트게이지로 측정한 결과 0.003 이내의 결과를 나타냈다. 따라서 본 로봇 자동화 시스템을 적용한다면 생산성 향상 및 불량률 감소가 가능하여 인력대체 및 가격경쟁력이 가능하다고 판단된다.

  • PDF

Comparison of Flow Line Layout and Fixed-Position Layout in a Rail Vehicle Assembly Factory (철도차량 의장공장에서 흐름라인방식과 고정위치형 배치방식의 비교)

  • Moon, Dug Hee;Son, Dong Su;Lee, Young Hoon;Shin, Yang Woo
    • Journal of the Korea Society for Simulation
    • /
    • v.27 no.3
    • /
    • pp.117-129
    • /
    • 2018
  • In this paper we will discuss two different layout concepts which can be applied to rail-vehicle assembly factory. The existing system is based on the traditional flow line, and the suggested system is based on the fixed position layout. The main factors which affect on the system performances are the variation of process time, shortage rate of part and the shortage period. Simulation experiments indicate that the fixed position layout is better with respect to the throughput, mean flow time per vehicle and the mean flow time per fleet. Furthermore, the fixed position layout is more robust than the flow line because performance measures are insensitive to the variations of factors.

A Study on Machine Vision System Module based on high speed realtime triggering (초고속 실시간 트리거에 의한 머신 비전 시스템 모듈에 관한 연구)

  • Lee, Myeongsoo;Kim, Dongmin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2017.11a
    • /
    • pp.1118-1119
    • /
    • 2017
  • 머신 비전 시스템은 영상 처리와 영상 분석을 함께 사용하여 공장의 조립라인 등 다양한 분야에서 응용 되고 있는 시스템이다. 하지만 기존의 시스템은 고가의 초고속 카메라와 다양한 센서를 동시에 이용하는 문제로 시스템 구축 및 확장성 등의 불편함을 야기하고 있다. 이에 본 연구에서는 초고속 실시간 트리거를 이용한 저가형 이미지 센서 기반의 머신 비전 시스템을 구성하고자 한다.