• Title/Summary/Keyword: 제어기 교체

Search Result 65, Processing Time 0.027 seconds

Two layered Secure Password Generation with Random Number Generator (난수 발생기를 이용한 이중화 구조의 안전한 비밀번호 생성 기법)

  • Seo, Hwa-Jeong;Kim, Ho-Won
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.4
    • /
    • pp.867-875
    • /
    • 2014
  • Rapid development of internet service is enabling internet banking services in anywhere and anytime. However, service access through internet can be exposed to adversary easily. To prevent, current service providers execute authentication process with user's identification and password. However, majority of users use short and simple password and do not periodically change their password. As a result of this, user's password could be exposed to attacker's brute force attack. In this paper, we presented enhanced password system which guarantee higher security even though users do not change their current password. The method uses additional secret information to replace real password periodically without replacement of real password.

Sprinkler System with Universal Solenoid Valve (범용 전자개방밸브를 적용한 스프링클러설비)

  • Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.3
    • /
    • pp.351-357
    • /
    • 2019
  • This research is automatic Wet Pipe Sprinkler System, dry pipe Sprinkler System, preaction Sprinkler system, vacuum Sprinkler system, deluge Sprinkler system, etc., key components of each Sprinkler system, verve valve, valve, etc. This is to simplify the various processes of the manufacturing process into a single process to create an environment in which a single machine can simultaneously produce a standardized product, thereby improving the price competitiveness of the product, reducing the cost of maintaining the product, and making it more adaptable to the new sprinkler system that is developed in the future. Automatic Wet Pipe Sprinkler System, desipe Sprinkler System, preaction sprinkler system, vacuum Sprinkler system, deluge Sprinkler system, both types of existing Sprinkler system, only replace the primary and secondary tubing valves.It has the advantage of being easy to apply to the lower system. Legal and institutional research is needed for the commercialization of the Sprinkler system applying the solenoid valve as a future project.

A Study on the Development of the Single Station Fixed Temperature Detector of Low Power Consumption for Residential Fire Prevention (주택화재 예방을 위한 저소비 전력형 단독경보형 정온식감지기 개발에 관한 연구)

  • Park, Se-Hwa;Cho, Jae-Cheol
    • Fire Science and Engineering
    • /
    • v.24 no.6
    • /
    • pp.61-68
    • /
    • 2010
  • In this paper, a research and development result for the implementation of single station fixed temperature detector for residential fire prevention is described. The detector was developed for the certification in Japanese market because of very low domestic market situation. It is in the situation that there is no other regulation especially for residential detectors in Korea, Japanese case has been reviewed. Investigation of domestic legal circumstances and a comparative study for the test standard owned by KFI (Korea Institute of Fire Industry & Technology) and JFEII (Japan Fire Equipment Inspection Institute) respectively are also indicated. The detector alarms with a buzzer and an indicating LED. In the implementation ultra low power MCU(Micro Controller Unit) is applied to control the sleeping state and the monitoring state properly with low current consumption. To sense the temperature fast response thermistor is adopted in the design of fixed temperature residential detector. Automatic test function and alarm stop function are also considered in the design. The major factors which influence to current consumption are explained for the purpose of design reference. Main electronics circuit parts related to it's characteristics of the detector are described. It is explained that the measured current and experimental result of the battery discharge can be met over 10 years operation.

Structural Performance of Pre-tensioned Half-depth Precast Panels (프리텐션 반두께 바닥판을 갖는 바닥판의 구조성능 평가)

  • Kim, Dong Wook;Shim, Chang Su
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1707-1721
    • /
    • 2014
  • Half-depth panels were developed with the merits of CIP (Cast In Place) decks and precast decks for constructability and fast construction. In this paper, details of half-depth panels with pre-tensioning were suggested. For evaluation of structural performance, five half-depth panel specimens were fabricated and static tests were conducted. The cross-sections of these specimens were composed of pre-tensioned half-depth panels and pre-tensioned two-span half-depth panels. Test parameters were the amount of the prestressing force and the longitudinal reinforcements. Static tests on simply-supported slabs showed that ultimate strength was 1.55 times greater than calculated nominal strength. The flexural strength was only 10 % increased and the influence on crack width control was negligible when the member of tendons was increased twice. For two-span continuous specimens, the ultimate strength increased 1.2 times and 1.38 times respectively as the reinforcement was additionally provided. The verified half-depth panels by this research can be effectively utilized for the fast replacement or construction of bridges.

Statistical Analysis of Operating Efficiency and Failures of a Medical Linear Accelerator for Ten Years (선형가속기의 10년간 가동률과 고장률에 관한 통계분석)

  • Ju Sang Gyu;Huh Seung Jae;Han Youngyih;Seo Jeong Min;Kim Won Kyou;Kim Tae Jong;Shin Eun Hyuk;Park Ju Young;Yeo Inhwan J.;Choi David R.;Ahn Yong Chan;Park Won;Lim Do Hoon
    • Radiation Oncology Journal
    • /
    • v.23 no.3
    • /
    • pp.186-193
    • /
    • 2005
  • Purpose: To improve the management of a medical linear accelerator, the records of operational failures of a Varian CL2l00C over a ten year period were retrospectively analyzed. Materials and Methods: The failures were classified according to the involved functional subunits, with each class rated Into one of three levels depending on the operational conditions. The relationships between the failure rate and working ratio and between the failure rate and outside temperature were investigated. In addition, the average life time of the main part and the operating efficiency over the last 4 years were analyzed. Results: Among the recorded failures (total 587 failures), the most frequent failure was observed in the parts related with the collimation system, including the monitor chamber, which accounted for $20\%$ of all failures. With regard to the operational conditions, 2nd level of failures, which temporally interrupted treatments, were the most frequent. Third level of failures, which interrupted treatment for more than several hours, were mostly caused by the accelerating subunit. The number of failures was increased with number of treatments and operating time. The average life-times of the Klystron and Thyratron became shorter as the working ratio increased, and were 42 and $83\%$ of the expected values, respectively. The operating efficiency was maintained at $95\%$ or higher, but this value slightly decreased. There was no significant correlation between the number of failures and the outside temperature. Conclusion: The maintenance of detailed equipment problems and failures records over a long period of time can provide good knowledge of equipment function as well as the capability of predicting future failure. Wore rigorous equipment maintenance Is required for old medical linear accelerators for the advanced avoidance of serious failure and to improve the qualify of patient treatment.