• Title/Summary/Keyword: 정비효과성감시 프로그램

Search Result 4, Processing Time 0.016 seconds

Development of Maintenance Effectiveness Monitoring Program for APR1400 Safety Related Systems (APR1400 안전관련계통 정비효과감시 프로그램 개발)

  • Yeom, Dong Un;Hyun, Jin Woo;Song, Tae Young
    • Journal of Energy Engineering
    • /
    • v.23 no.2
    • /
    • pp.191-198
    • /
    • 2014
  • Korea Hydro & Nuclear Power Co. (KHNP) has developed and implemented the maintenance effectiveness monitoring (MR) programs for the operating nuclear power plants. MR programs are developed by reflecting design characteristics of the operating nuclear power plants to monitor the plant performance for improving the safety and reliability. Recently, KHNP has developed the MR program for APR1400 safety related systems to establish the advanced maintenance system and will verify the suitability of the MR program through evaluating initial performance. Consequently, it is expected that the safety of the new plant will be improved by developing and implementing the MR program.

Development of Maintenance Effectiveness Monitoring Program based on Design Characteristics for New Nuclear Power Plant (신규원전의 설계특성 기반 정비효과성감시 프로그램 개발)

  • Yeom, Dong-Un;Hyun, Jin-Woo;Song, Tae-Young
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.8 no.1
    • /
    • pp.25-32
    • /
    • 2012
  • Korea Hydro & Nuclear Power Co. (KHNP) has developed and implemented the maintenance effectiveness monitoring (MR) programs for the operating nuclear power plants. The MR program is developed by reflecting design characteristics of the operating nuclear power plants to monitor the plant performance for improving the safety and reliability. Recently, KHNP has built a new nuclear power plant, and developed the MR program to establish the advanced maintenance system by reflecting unique design characteristics based on the OPR1000 standard model. So, the MR program developed in this study has another characteristics in comparison with the OPR1000 standard model, and we will verify the suitability of the MR program through evaluating initial performance of the plant. The safety and reliability of the new plant will be improved by developing and implementing the MR program.

Study of Performance Criteria Methodology for Maintenance Effectiveness Monitoring Program for Nuclear Power Plants (원전 정비효과성감시 프로그램의 성능기준설정 방법론 개선)

  • Song, Tae-Young;Yeom, Dong-Un;Hyun, Jin-Woo
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.8 no.2
    • /
    • pp.26-32
    • /
    • 2012
  • The systems of the nuclear power plant are designed based on the User Requirement Document, and Korea Hydro & Nuclear Power Co. (KHNP) implements preventive maintenance activities to keep the specific design function of the system consistently. To monitor the preventive maintenance effectiveness, KHNP has also developed maintenance effectiveness monitoring (MR) program based on NUMARC 93-01 since 2003, and has implemented the program in all operating plants. Recently, KHNP has upgraded MR programs by reflecting implementing experiences ; reestablishing the performance monitoring level, improving analysis for standby function and performance criteria for passive components, reestablishing the availability performance criteria and the performance criteria for the same type of components. These upgraded MR programs will contribute to enhance safety and improve equipment reliability through monitoring maintenance effectiveness.

Development of Engineering Program for APR1400 Feedwater Supplying System (APR1400 급수공급계통 엔지니어링 프로그램 개발)

  • Yeom, Dong Un;Ju, Tae Young;Hyun, Jin Woo
    • Journal of Energy Engineering
    • /
    • v.26 no.2
    • /
    • pp.12-22
    • /
    • 2017
  • Korea Hydro & Nuclear Power Co. (KHNP) has implemented engineering programs for operating nuclear power plants. Engineering programs are maintenance rule (MR), functional importance determination (FID), single point vulnerability (SPV) and functional equipment group (FEG). Recently, KHNP has developed engineering programs for APR1400 feedwater supplying system to establish the advanced engineering system and will verify the suitability of engineering programs through implementing in new nuclear power plant. Consequently, it is expected that the reliability of APR1400 feedwater supplying system will be improved by implementing engineering programs.