• Title/Summary/Keyword: 정부지급금 산출

Search Result 3, Processing Time 0.023 seconds

A Study on Developing the Calculation System of Disbursement for Government on the BTL Projects (BTL사업을 위한 정부지급금 산출 시스템 개발 연구)

  • Lee, Chun-Kyong;Cho, Bong-Ho;Jung, Young-Han;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.93-101
    • /
    • 2009
  • BTL projects, which has been 3 years since it was carried out in 2008, trigged the controversy on the adequacy in the calculation of disbursement for Government due to such problems as low earning rate and the burden of service level compared with the project suggestion. Thus, the purpose of this study is to offer a suggestion on the calculation system for the purpose of the standardized - expense appropriation by item and database including the antecedent study on the finance model and the feasibility in BTL projects. The system is composed of 4 steps - project management, basic database, an analysis on expense by item and the result, and an analysis on sensitivity, and it is possible to carry out a comparative analysis on single and multi alternatives by variable change along with the ground on expense calculation.

A Study on Risk Sharing of PPI Project Demand Risk (민간투자사업 수요위험 분담 방식에 관한 연구)

  • Shin, Sung-Hwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.102-109
    • /
    • 2012
  • One of key success factors in PPI(Public Private Investment) is the structure of risk sharing between the public and the private, and the determination mechanism of fair return to private participants relative to the risk that private participants undertake. In Korea, two basic types of PPI exist. One is BTO and the other is BTL. In BTO, most risks are taken by the private whereas the opposite is the case in BTL. No intermediate form exists. As a result, BTO type projects had difficulty in attracting private participants because of the excessive risks. In this study, one intermediate form is studied where demand risk is shared between the public and the private. In the setting where the public authority takes all the project revenues and then pays ladder type payments to private participants depending upon the level of project revenues, appropriate level of fixed payments is endogenously derived using the real option pricing model. From the fixed payments, expected investment returns are calculated based upon a certain distributional assumption. The results of this study is expected to help introducing diverse forms of PPI in Korea.

A Study on Model Establishment of the Validity Evaluation for BTL Project Expenses Using an Analytic Hierarchy Process (계층분석법(AHP)을 이용한 BTL사업비 타당성 평가모형정립에 관한 연구)

  • Lee, Chun-Kyong;Jung, Young-Han;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.905-908
    • /
    • 2008
  • The BTL project, 4 years since its operation, has benchmarked the PFI Project in Japan and has been introduced. Given the evaluation step to select a preferred bidder, in a technological factor, the basic plans are corrected and complemented, whereas in a price factor, the low price bidding system is being enforced. There is concern that how to select preferred bidders and how to operate project costs during operation and management period may be problematic. Thus, in this study, using the Analytic Hierarchy Process, the method of deciding the pribrity to select preferred bidders in an early stage of the project and the evaluation model to evaluate the validity of BTL project expenses in process of project enforcement are established. Targeting the group. composed of experts who have experiences in the BTL project. Then, the levelling of evaluation factors and grouping have been carried out as following: LCC analysis and disbursement for government including two more detailed factors.