• Title/Summary/Keyword: 정보화 설계시공

Search Result 41, Processing Time 0.024 seconds

A Research on how to turn informationization Database of construction materials to practical use (건설 자재정보 DataBase의 실용화 방안 연구)

  • Kwon, Oh-Yong;Han, Chung-Han;Lee, Hwa-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.747-750
    • /
    • 2007
  • Information of construction material is served through internet to user but it is poor to use information of construction material because of lack of information which is accumulated and insufficience of standardization. So informationization of civil materials are closely connected with works and then it is promoted to be used through works like design, construction etc. Informationization for management of information of construction material which reflects questionnaires about opinion of workers presents promotion by stage considering first, continuous renewal of information of construction material and increase in quantity, second classification system and standardization of terms in order to share and connect information of construction material third, developing inquiry method of material information needed in construction stage fourth, connecting material information DB and application through design and construction.

  • PDF

현상설계경기 - 중랑구립도서관

  • Korea Institute of Registered Architects
    • Korean Architects
    • /
    • no.9 s.329
    • /
    • pp.110-111
    • /
    • 1996
  • 지난 8월 13일 중랑구립도서관의 현상설계 당선작이 발표되었다. 총 15개 건축사사무소가 작품을 제출한 이번 설계경기는 (주)듀엘인터내셔널건축(오용석,김진권)안이 당선작으로 선정되었으며, 민가건축(김석순)과 서울, 진우, 시공, 필건축(정규식)안이 각각 가작으로 선정되었다. 정보화, 자치화 시대를 맞이하여 지역주민을 위한 각종 자료의 열람 및 정보를 제공하여 주민의 평생교육의 장으로 활용하고 문화공간의 역할과 기능을 다할 수 있는 도서관을 건립한다는 목표로 실시된 이번 현상설계는 연면적이 1,000평이며, 예정공사비는 36억6천만원이 소요될 예정이다. 당선된 (주)듀엘인터내셔널 건축사사무소에게는 기본 및 실시설계권이 부여되며(설계비 : 177,610천원)이 도서관은 오는 98년 완공 예정이다.

  • PDF

Prediction of Ground-Condition Ahead of the Tunnel Face by Using 3-Dimensional Absolute Displacements (3차원 절대내공변위를 이용한 터널 막장전방의 지반면화 예측기법)

  • Lee, In-Mo;Gang, Gi-Don;Park, Gwang-Jun
    • Geotechnical Engineering
    • /
    • v.14 no.4
    • /
    • pp.17-32
    • /
    • 1998
  • has been much progress in theories and construction techniques to secure the stability of the underground structures. Recently, several studios have shown that it is possible to predict the existence of discontinuities ahead of a tunnel face by analyzing 3-dimensional absolute displacements measured during tunnel excavation. This paper concentrated on the development of a methodology to predict the existence and location of the discontinuities, or the void space(abandoned mine) , by performing 3-dimensional FEM analysis and considering the stress relocation caused by arching effect during excavation. Also, this study tried to verify deformation for choosing the most suitable support system. The results of this study might provide a way of safer and economical tunnel construction by utilizing the in-situ monitoring data.

  • PDF

Improvement Direction for Construction CALS System considering Environmental Management (환경관리를 고려한 건설CALS시스템의 개선방향)

  • Jung, In-Su;Kim, Jin-Uk;Lee, Chan-Sik
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2008.06b
    • /
    • pp.469-472
    • /
    • 2008
  • 건설부문의 정보화를 위해 국토해양부는 건설CALS(Continuous Acquisition & Life-cycle Support)사업을 추진하고 있다. 건설CALS란 건설사업의 설계, 시공, 유지관리 등 전 과정의 생산정보를 발주자, 관련업체 등이 전산망을 통하여 교환 공유하기 위한 정보화 전략이다. 건설CALS사업은 시스템 개발 부문과 건설정보 표준화 부문으로 구분할 수 있는데, 개발된 시스템으로는 건설사업관리시스템(건설사용, 발주기관용), 시설물유지관리시스템, 건설인허가시스템, 용지보상시스템, 건설CALS포탈시스템 등이 있다. 건설CALS시스템에는 건설사업의 공정관리, 원가관리, 안전관리 등의 많은 기능이 있음에도 불구하고 최근 그 중요성이 부각되고 있는 환경관리 기능은 없는 실정이다. 본 논문에서는 건설CALS시스템의 현황을 분석하고 환경관리가 가능한 체크리스트와 매뉴얼을 개발하여 시스템으로 구현하기 위한 방향을 제시하고자 한다.

  • PDF

Development of 3D Parametric Models for Modular Bridge Substructures (모듈러 교량 하부구조를 위한 3차원 변수모델의 개발)

  • Kim, Dong-Wook;Chung, Dong-Ki;Shim, Chang-Su
    • Journal of KIBIM
    • /
    • v.2 no.2
    • /
    • pp.37-45
    • /
    • 2012
  • Modular bridge construction enabling better productivity of design and construction by standardized members and robotic construction becomes an important issue in construction industry. Modular structures needs accurate information delivery between design, fabrication and construction processes. BIM (Building Information Modeling) based parametric modeling was proposed for the modular bridge substructure. Considering ranges of parameters of the modular bridge, fixed value, variables and relations were defined and these parametric models were applied to design, analysis and fabrication. Experience from development of new structures can be embedded in the 3D models, and the models provide efficient and precise knowledge delivery.

An Exploratory Study on Conceptual Framework for Project-based Supply Chain Management : Focusing on Plant Engineering Firms (프로젝트형 SCM의 개념적 틀에 관한 탐색적 연구 : 플랜트 엔지니어링 기업을 중심으로)

  • Kim, Tae Ung
    • Journal of Digital Convergence
    • /
    • v.16 no.12
    • /
    • pp.123-135
    • /
    • 2018
  • The objective of this paper is to investigate the issues related to the supply chain management in plant engineering industry, and propose the framework to improve the project efficiency. The preliminary case study shows that EPC's fragmented nature, lack of coordination and information sharing, and lack of proper risk and change management contribute to project delay and cost overrun. To examine the level of informatization and information sharing in supply chain, survey responses from the suppliers and subcontractors have been collected. The statistical results show that information sharing, early involvement in design process and awareness in SCM have influenced the level of collaboration, but supplier assessment and informatization have no impact on the collaboration. A conceptual model is proposed in order to facilitate the integration of design, procurement and construction functions. Implications from the study are also provided.

Total Management System for Earth Retaining Structures Using Observational Method (지반굴착 흙막이공의 정보화시공 종합관리 시스템)

  • 오정환;조철현;김기웅;백영식
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.2
    • /
    • pp.51-64
    • /
    • 2002
  • Observational results of ground movement during the construction were very different from those predicted during the analysis of design step because of the uncertainty of the numerical analysis modelling, the soil parameter, and the condition of a construction field, etc., however accurately numerical analysis method was applied for prediction of ground movement per the excavation step. Therefore, the management system through the construction field measurement should be achieved for grasping the situation during the excavation. Until now, the measurement system restricted by 'Absolute Value Management system'analyzing only the stability of present step has been executed. So, it was difficult to expect the prediction of ground movement fur the next excavation step. In this situation, this study developed 'The Management system TOMAS-EXCAV'consisted of 'Absolute value management system'analyzing the stability of present step and 'Prediction management system'expecting the ground movement of next excavation step and analyzing the stability of next excavation step by 'Back Analysis'. TOMAS-EXCAV could be applied to all the uncertainty of earth retaining structures analysis by connecting 'Forward analysis program'and 'Back analysis program'and optimizing the main design variables using SQP-MMFD optimization method through measurement results. The applicability of TOMAS-EXCAV was confirmed by back analysis selecting two earth retains construction fields.

A Case Study on Information Strategy Plan of the Web Based on Project Management Information System for Construction Company (전사 웹기반 사업관리시스템 구축을 위한 정보화전략계획에 관한 사례연구)

  • Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.2D
    • /
    • pp.259-267
    • /
    • 2008
  • Nowadays PMIS (Project Management Information System) based on web is widely applied to communication, collaboration and community in construction jobsite for various organization such as subcontractors, general contractor, engineering company, supervisors and client. However, individual PMIS in jobsite is prone to be troublesome issue for integration and exchange of information regarding project management in corporate and may result in conflict of data application. The main reason should be lack of information strategy plan such as company master plan for information. This research shows a critical success factor that a big construction company of Korea establishes procedure and method for information strategy plan. In addition, It is to suggest how to be implemented PMIS architecture and execute business process innovation in corporate level. This research expects contribution that many construction companies reduce mistakes to be implemented management information system and to optimize system in corporate level.

Implementaion of a Web-based syllabus framing System (웹 기반 지도안 작성 시스템의 설계 및 구현)

  • Ji, Hyun-Sung;Han, Hyun-Goo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2005.05a
    • /
    • pp.117-120
    • /
    • 2005
  • 21세기는 정보화 사회로서 정보와 지식이 사회를 움직이는 원동력이며 국가 경쟁력의 기반이 되고 있다. 정부에서는 정보 통신 기술(ICT) 교육 지침을 정하여 2001학년도부터 초등학교, 중학교, 그리고 고등학교에서 정보 소양 교육과 각 교과별 교수 학습에 ICT기술을 10%이상 활용하도록 권장하고 있다. 따라서 일선학교에서는 이러한 정보 사회의 교육환경 변화와 요구에 부응하여 ICT활용 교육을 위한 교수 학습 지도안을 여러 가지 방법으로 작성하고 있으나 현재까지 web을 통한 학습지도안 작성은 매우 미흡한 상황이다. 이에 본 연구에서는 ICT활용 학습지도안을 시공간의 제약 없이 작성, 수정, 검색, 그리고 활용이 가능한 학습지도안 작성시스템을 web을 기반으로 설계하여 학습지도안의 공유 및 재활용 등을 용이하게 함으로써 지도안 작성시간을 대폭 줄일 수 있도록 하였다. 또한 학습지도안과 수업자료를 데이터베이스에 저장하여 데이터의 효율적인 관리와 검색이 가능하게 하였으며, 수업활동 종료 후 형성평가 문제의 출제 및 평가 결과가 계속 누적되어 앞으로의 개인별, 수준별 학습활동에 참고자료로 활용될 수 있도록 하였다. 학습자도 시공간의 제약 없이 학습지도안 검색이 가능하므로 학습자의 예습 복습을 용이하도록 하였다.

  • PDF

Research about sharing of compensation data between owner and contractor for construction CALS improvement (건설CALS 완성도 제고를 위한 다양한 이해당사자간 보상자료 공유방안 연구)

  • Seo, Myoung-Bae;Kim, Nam-Gon
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2010.06b
    • /
    • pp.144-147
    • /
    • 2010
  • 국토해양부에서는 건설산업의 투명성을 제고하고 생산성을 향상시키기 위해 1990년대 후반부터 건설사업정보화(CALS : Continuous Acquisition and Life-cycle Support) 사업을 진행중에 있다. CALS는 제조업의 모든 상품, 즉 주요장비 또는 다양한 상품 등을 획득하기 위한 설계, 생산과정, 또는 보급, 조달 및 이를 운영하는 운용지원과정을 연결시키고, 이들 과정에서 사용되는 각종 정보를 표준이라는 공통 창구를 통해 디지털화하여 컴퓨터상으로 정보를 통합하여 자동화시키는 개념이다. 이는 컴퓨터 네트워크를 이용해 상호 교환이 이루어지는 자동화되고 통합된 환경으로 변환시키는 정부와 기업간의 경영전략이라고 볼 수 있다. 이러한 개념에서 확장된 건설CALS는 건설공사 전 과정, 즉 기획, 설계, 조달, 시공, 유지보수 등의 과정에서 발생하는 각종 정보를 다양한 이해당사자가 교환하고 공유하기 위한 개념으로 출발하였으며, 현재 이를 지원하기 위한 5개의 단위시스템을 개발하여 운영중에 있다. 이중 용지보상시스템은 건설공사의 업무중에 시공단계에서 이루어지는 보상업무를 지원하는 시스템이다. 보상업무는 건설사업 과정 중에서 민원인과 직접대면하는 일이 많고, 액수도 클 뿐만 아니라 개인의 소유권과 밀접한 관계가 있기 때문에 분쟁의 소지가 매우 많다. 이에 본 논문에서는 보상업무 수행시 다양한 이해당사간의 각종 보상자료 교환체계 확립을 통한 업무 선진화방안 제시를 통해 업무의 투명성을 최대화하고 민원을 최소화하여, 보상업무 담당자에게는 업무의 효율성을 제고하고 민원인들에게는 국가행정에 대한 신뢰도를 높일 수 있는 보상업무 선진화 방안을 제시하고자 한다.

  • PDF