• 제목/요약/키워드: 정보계획수립

Search Result 1,593, Processing Time 0.039 seconds

A Study on the Optimum Disaster Mitigation Activity to Establish the Early Counter System on the Industrial Accidents (산업체재난 조기 대응체계 구축을 위한 최적 재해경감활동 방안 연구)

  • Lee, Keun-Jae;Yoon, Myong-O;Lee, Won-Ho
    • Fire Science and Engineering
    • /
    • v.24 no.2
    • /
    • pp.9-20
    • /
    • 2010
  • This study indicates direction on establishment of the operational plan for disaster mitigation and its implementation for maintaining business continuity of the local company of the first step, and seeks plans for maintaining their continuity through the establishment of early counter system constructed for achieving lasting safe at the any disaster. For achieving it, we investigated the standard of disaster management selected by the government called "Incident Preparedness and Operational Continuity Plan" Guideline, and investigated a guideline to be easily applied to domestic companies. And, we also studied on how to build the operational plan of disaster mitigation and apply IT techniques to A corporation. Especially, this study indicates the models of establishment of risk assessment, impact analysis, prevention and mitigation plan, response management plan for the establishment of plan among 5 main steps on "Incident Preparedness and Operational Continuity Management" Guideline. We devised the plan to activate the disaster mitigation activity throughout the country. It shows the skills to be prepared to upgrade the level of disaster response in this study.

Development of a two-phase heuristic method for the enhancement of a production schedule (생산일정계획 성능향상을 위한 2단계 휴리스틱 방법의 개발)

  • 홍윤호;김승권;이준열
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1994.04a
    • /
    • pp.635-645
    • /
    • 1994
  • 생산현장은 생산일정을 실천하는 과정에서 생산일정수립시에 이용하는 정보의 부정확성과 작업장내의 동적특성 때문에 기존에 수립했던 일정을 더 이상 수행하기 어려운 상황에 놓이게 되는 경우가 잦다. 따라서 변화된 방황에 맞게끔 재일정을 신속하게 수립해 주어야 한다. 일정에 동적인 상황을 반영하기 쉽게 하고 일정에 대한 사용자의 이해를 도와서 좋은 일정을 빠른 시간내에 수립하기 위해 생산통제시스템을 사용자 편의의 일정편집기능과 일정수립기능을 제공하는 의사결정 지원시스템으로 설계하였다. 일정편집기능은 규칙기반 시스템으로 구현되었으며 사용자가 편집작업을 수행했을 경우 일저으이 국소적인 변화가 전체에 파급시키는 효과를 추적하여 생산일정의 실행가능성을 유지시켜 준다. 이를 통해 사용자가 일정에 대한 이해와 확신을 가지고 일정을 실천에 옮기게 할 수 있을 뿐만 아니라, 사용자의 의사를 적극 반영할 수 있어서 좀 더 현실적인 일정운영이 가능하다. 한편 일정수립기능을 위해 2단계 일정계획 방법을 고안하였다. 단계 1에서는 우선순위 규칙으로 일정을 수립하고 단계 2에서는 단계 1에서 수립된 일정을 makespan 측면에서 개선시켜 일정을 향상시키는 방법을 취하므로서 우선순위 규칙만을 사용하는 근시안적인 방법보다는 수행도가 좋으면서 타당한 시간내에 일정을 수립할 수 있도록 하였다.

Optimization of call center staffing problem scheduling using machine learning-based daily call count prediction (머신러닝 기반의 일 별 콜 수 예측을 활용한 콜센터 인력 스케줄링 최적화)

  • Kim, Ji-Hyun;Park, Sang-Jun
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2020.11a
    • /
    • pp.830-833
    • /
    • 2020
  • 콜센터에서 인력 스케줄링은 매우 중요하다. 모든 콜센터에서 인건비는 고정비 성격이 강하여 차지하는 비중이 매우 높아 콜센터의 이익을 좌지우지한다. 그렇기 때문에 콜센터의 적정 인력의 고용과 배치는 인건비 뿐만 아니라 콜 성공률 또한 직결되어 있어 콜센터 운영에서 중요한 사안이라고 할 수 있다. 대부분의 콜센터가 현재까지도 관리자의 경험에 의해 인력배치를 수립하는데, 이러한 방법은 과학적이지 않으며 인원수에 영향을 미치는 모든 변수들을 고려할 수 없다. 과거 수학적 모델을 수립하는 것이었다면, 지금은 모델을 학습시키고, 학습된 모델을 기반으로 미래의 고객과 인원수를 예측해야 한다. 본 논문에서는 수리제약식을 통해 다양한 변수들을 고려하고 비선형 정수 계획법과 딥러닝 기반의 예측 값을 이용하여 비선형 정수계획법을 통해 최적의 인력배치 스케줄링을 수립하였다.

Approach For Setting Priorities Of Standardization Work Areas in Major Standardization Bodies (주요 기구의 정보통신 표준화분야 우선순위 결정을 위한 접근방법 분석)

  • Koo, K.C.;Park, K.S.;Sohn, H.
    • Electronics and Telecommunications Trends
    • /
    • v.10 no.3 s.37
    • /
    • pp.101-123
    • /
    • 1995
  • 최근 정보통신 기술 및 제품의 수명주기가 점점 단축됨에 따라 기업들간 컨소시움 형성, 다양한 포럼의 장 등을 통한 사전표준화가 정보통신전반에 걸쳐 광범위하게 추진되고있다. 이는 표준화가 국내외 정보통신시장의 선점 및 첨단기술개발주도권 확보를 위한 효과적이고 실질적인 수단이 되고 있음을 의미한다. 이와 같은 환경변화는 국가 차원의 적실한 표준화 전략계획수립의 필요성을 더욱 크게 하고 있다. 본 고에서는 정보통신표준화 전략계획 수립을 위한 정보통신표준화 대상의 우선순위결정방법을 분석하기 위해, 주요표준화기구들(ITU, ETSI, T1, TTC, TTA)의 표준화 전략 및 과제추진현황 등을 중심으로 조사분석하였다,

A Study of Policy and Agenda Adoption Trends of University Library in Korea (우리나라 대학도서관 정책과 정책과제 채택 추이에 관한 연구)

  • Lee, Jae-Won
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.53 no.3
    • /
    • pp.83-99
    • /
    • 2019
  • This study tried to present rational policy direction of future university libraries through the policy process related to university libraries and the change of policy tasks adopted in the policy making process. The 2009 Development Comprehensive Plan was established with the aim of supporting the collection of information resources at university libraries, and the plan in 2014 was developed with the direction of policies to enhance the role of librarians for competition in university research capabilities. The Promotion Comprehensive Plan for 2019 was aimed at strengthening the role of university libraries in upgrading their research support. Through the research on the policy of the university library by the government, the policy direction of the future university library in Korea was presented, and the plan was to provide an institutionalized platform (labor, physical space, resources, etc.) for the university library to maximize the research productivity of the university.

A Study on the Development of Supporting Tool for Tourism Statistics Process Design (관광통계 프로세스 설계 지원 도구 개발에 관한 연구)

  • 한경진
    • The Journal of the Korea Contents Association
    • /
    • v.4 no.3
    • /
    • pp.1-11
    • /
    • 2004
  • This study alms to perform Business Process Reengineering and to develop tourism statistics information system through the development of tourism statistics process design supporting tool. With this tool, we can manage tourism statistics systematic and integrated. Also it offers a tourism decision making supporting tool. Tourism statistics process design supporting tool consists of information provider, information maker, and information user. This tool can improve bossiness process, and rationalize system architecture. 49 business processes were designed and a database which connected with outside system was designed by this supporting tool. By these means, this tool provide more reasonable and effective decision making tool, when it comes to plan tourism development.

  • PDF

The Design of a Mobile Robot Path Planning using a Clustering method (클러스터링 기법을 이용한 모바일 로봇 경로계획 알고리즘 설계)

  • Kang, Won-Seok;Kim, Jin-Wook;Kim, Young-Duk;An, Jin-Ung;Lee, Dong-Ha
    • Proceedings of the KIEE Conference
    • /
    • 2008.10b
    • /
    • pp.341-342
    • /
    • 2008
  • GA(Genetic Algorithm)는 NP-Complete 도메인이나 NP-Hard 도메인 내의 문제들에 대해서 최적의 해를 찾기 위해서 많이 사용되어 지는 진화 컴퓨팅 방법 중 하나이다. 모바일 로봇 기술 중 경로계획은 NP-Complete 도메인 영역의 문제 중 하나로 이를 해결하기 위해서 Dijkstra 등의 그래프 이론을 이용한 연구가 많이 연구되었고 최근에는 GA등 진화 컴퓨팅 기법을 이용하여 최적의 경로를 찾는 연구가 많이 수행되고 있다. 그러나 모바일 로봇이 처리해야 될 공간 정보 크기가 증가함에 따라 기존 GA의 개체의 크기가 증가되어 게산 복잡도가 높아져 시간 지연등의 문제가 발생할 수 있다. 이는 모바일 로봇의 잠재적 오류로 발생될 수 있다. 공간 정보에는 동적이 장애물들이 예측 불허하게 나타 날 수 있는데 이것은 전역 경로 계획을 수립할 때 또한 반영되어야 된다. 본 논문에서는 k-means 클러스터링 기법을 이용하여 장애물 밀집도 및 거리 정보를 기반으로 공간정보를 k개의 군집 공간으로 재분류하여 이를 기반으로 N*M개의 그리드 개체 집단을 생성하여 최적 경로계획을 수립하는 GA를 제시한다.

  • PDF

2002년 하반기 전자산업 경기전망

  • Korea Electronics Association
    • Journal of Korean Electronics
    • /
    • v.22 no.8
    • /
    • pp.6-11
    • /
    • 2002
  • 본회 전자산업연구소에서는 국내 전자산업 제조업체의 경기전망을 조사/분석하여 기업의 경영계획 수립 및 정부의 정책수립 마련을 위한 기초 자료를 제공하기 위하여 5월 20일부터 6월 20일까지 1개월간에 걸쳐 본회 회원사 및 생산, 수출 비중이 높은 전자제조업체를 대상으로 우편, 이메일에 의한 자계기입방식과 미회수 업체에 대한 전화인터뷰 조사를 병행하여 2002년도 하반기 전자산업 수급전망, 경기전망과 투자계획을 조사하여 내용을 정리하였다.

  • PDF

Periodic Scheduling Problem on Parallel Machines (병렬설비를 위한 주기적 일정계획)

  • Joo, Un Gi
    • Journal of Convergence for Information Technology
    • /
    • v.9 no.12
    • /
    • pp.124-132
    • /
    • 2019
  • Scheduling problems can be classified into offline and online ones. This paper considers an online scheduling problem to minimize makespan on the identical parallel machines. For dynamically arrived jobs with their ready times, we show that the sequencing order according to the ERD (Earliest Ready Date) rule is optimal to minimize makespan. This paper suggests an algorithm by using the MIP(Mixed Integer Programming) formulation periodically to find a good periodic schedule and evaluates the required computational time and resulted makespan of the algorithm. The comparition with an offline scheduling shows our algorithm makes the schedule very fast and the makespan can be reduced as the period time reduction, so we can conclude that our algorithm is useful for scheduling the jobs under online environment even though the number of jobs and machines is large. We expect that the algorithm is invaluable one to find good schedules for the smart factory and online scheduler using the blockchain mechanism.

Energy Management System Design Based on Fast Simulation Using Machine Learning Model (기계학습 모델을 이용한 고속 시뮬레이션 기반의 건물 에너지 관리 시스템 설계)

  • Lee, Eun-joo;Kim, Jeong-min;Ryu, Kwang-ryel
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2016.07a
    • /
    • pp.13-15
    • /
    • 2016
  • 에너지 소비가 큰 건물은 내부 온/습도, 이산화탄소 농도, 미세먼지 농도 등의 일정 공기 질을 유지하면서 에너지 비용을 최소화할 수 있는 제어계획을 수립하는 것이 필요하다. 기존 건물에서 실내 환경의 운영은 설정된 실내 환경 값을 기준을 벗어나면 설비 기기를 제어하는 방식으로 이루어진다. 이는 단 시간에 고에너지를 투입하여 장비를 가동시키므로 에너지 소모가 크며 peak 전력이 높아 에너지 비용이 크다는 문제가 있다. 따라서 온도를 포함한 환경이 변해가는 상황을 예측하고 사전에 에너지 사용 계획을 수립하여 관리 제어를 수행함으로써 예열부하 등의 불필요한 에너지 손실을 절감하려 한다. 이를 위해 실내 환경이 변화하는 것을 예측하고 후보 제어계획으로 제어를 수행할 때 소요되는 에너지가 어느 정도인지 시뮬레이션하여 제어계획의 적합도를 평가한다. 기존 EnergyPlus와 같은 시뮬레이션 도구는 모델이 복잡하여 시뮬레이션에 많은 시간이 필요하기 때문에 환경 변화를 반영하기 위해 주기적으로 재수립되는 수많은 제어계획 데이터를 단시간에 시뮬레이션하기에 부적합하다. 본 논문에서는 빠른 시뮬레이션을 위해 실제 운영 데이터와 에뮬레이션을 통해 획득한 운영 데이터를 기반으로 학습 알고리즘을 이용하여 제어계획 적용 시의 미래 상황을 예측한다.

  • PDF