• Title/Summary/Keyword: 정격

Search Result 699, Processing Time 0.028 seconds

Stress Analysis of the Blade Joint for a Small Wind Turbine (소형풍력터빈 블레이드 체결부의 응력해석)

  • Kim, Deok-Su;Jung, Won-Young;Jung, Jin-Tai
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.36 no.1
    • /
    • pp.117-124
    • /
    • 2012
  • In this paper, an analysis of the joint that transmits power from the blades to the generator is performed using the FEM (finite element method). The mode shapes and natural frequencies were extracted using experimental modal analysis in order to establish the FEM model. Then, the model was verified by comparing the mode shapes and natural frequencies to those obtained from the ANSYS modal analysis. Dynamic stress analysis was performed at the rated and limited wind speeds considering the wind load and gravity.

Development of a Small 6-axis Force/Moment Sensor for Robot′s Finger (로봇 손가락용 소형 6축 힘/모멘트센서 개발)

  • 김갑순
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.21 no.3
    • /
    • pp.51-58
    • /
    • 2004
  • This paper describes the development of a small 6-axis force/moment sensor for robot's finger, which measures farces Fx, Fy, Fz, and moments Mx, My, Mz simultaneously. In order to safely grasp an unknown object using the robot's gripper, and accurately perceive the position of it in the gripper, it should measure the force in the gripping direction, the force in the gravity direction and the moments each direction, and perform the force control using the measured forces and moments. Also, it should detect the moments Mx (x-direction moment), My and Mz to accurately perceive the position of the object in the grippers. Thus, the robot's gripper should be composed of 6-axis force/moment sensor that can measure forces Fx, Fy, Fz, and moments Mx, My, Mz simultaneously. In this paper, the small 6-axis force/moment sensor for measuring forces Fx, Fy, Fz, and moments Mx, My, Mz simultaneously was newly modeled using several parallel-plate beams, designed, and fabricated. The characteristic test for the developed sensor was performed, and the result shows that intereference errors of the developed sensor are less than 4.23%. Thus, the developed small 6-axis force/moment sensor may be used a robot's gripper.

Experimental Study on Heat Transfer and Pressure Drop of Heat Exchangers for Cooling Fan Coil Unit (냉방용 팬코일 유닛 열교환기의 열전달 및 압력강하 특성 실험연구)

  • Kwon, Young-Chul;Ko, Kuk-Won;Kwon, Jeong-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.3
    • /
    • pp.599-604
    • /
    • 2008
  • An experimental study has been performed to investigate the air-side capacity and pressure drop of the fin-tube heat exchanger for a fan coil unit under a cooling condition. The experimental data of five kinds of slit fin-tube heat exchangers were measured using an air-enthalpy calorimeter and a constant temperature water bath. Cooling capacities at the air and water rating flow rates were larger at the lower inlet water temperature. With increasing the water flow rate, the cooling capacity increased at the constant rate. Under the lower inlet water temperature, since the condensate was generated more on the fin-tube surface, the air-side pressure drop of the heat exchanger was larger.

Status of the Factory Acceptance Test for ITER AC/DC Converter Transformers (ITER 초전도자석 전원장치용 변압기의 제작 및 시험 현황)

  • Choi, J.;Suh, J.H.;Oh, J.S.;Shin, H.K.
    • Proceedings of the KIPE Conference
    • /
    • 2016.11a
    • /
    • pp.190-191
    • /
    • 2016
  • 국제 핵융합실험로인 ITER 장치의 초전도자석 전원장치용 CCU/L(Correction Coil Upper/Lower), CCS(Correction Coil Side) 그리고 VS1($1^{st}$ Vertical Stabilization) 형식 등 각 변압기 초도품의 제작을 완료하고 공장시험(FAT, Factory Acceptance Test)을 실시하였다. 이 변압기들은 각 형식별로 2대에서 6대를 제작하지만 각 형식별 초도품 1대에 대해서는 Type Test를 실시하고 나머지 후속물량에 대해서는 Routine Test로 공장시험을 실시하도록 계획되어 있다. 따라서 이 초도품 변압기들에 대해서는 Type Test로 공장시험으로 실시하였고, 그 대표적인 시험항목으로는 단락시험, %임피던스 시험, 뇌임펄스 시험, 정격전류 온도상승시험, 상용주파수 내전압시험 등이 있다. 이들 중 CCU/L, CCS 각 형식의 초도품에 대해서는 2015년도 공장시험을 실시하여 요건에 부합됨을 확인하였고, 본 논문에서는 VS1 컨버터 변압기 초도품에 대하여 Type Test로 실시한 공장시험 내용과 그 결과를 보여준다.

  • PDF

An Estimation of power capacity for electric motor scooter (전동스쿠터의 필요 동력 용량 계산)

  • Kim, Moonhwan
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2009.10a
    • /
    • pp.847-849
    • /
    • 2009
  • Usually, after the decisions of the performance and range in the commercial vehicle, it is designed the ratings of the electric and mechanical elements for the vehicles. In this paper, the given performance and driving conditions, which are the maximum velocity, mileage, total weight of the normal gasoline scooter, battery type and size, and so on, are analysed for the design of the electric scooter. The maximum rotational speed and needed torque values of the electric motor which is substituted for the gasoline engine are calculated. These values can help to calculate the rating of the electric motor. In the calculation to obtain the torque and speed values, battery discharge and the running resistances are considered. We can decide the electric motor current value from the torque and speed values. The electric motor current values, which are significant parameter to decide the motor type and dimensions and characteristics of the electric motor, are decided by numerical simulation by the above conditions.

  • PDF

Turbopump+Gas generator Open-loop coupled test (터보펌프+가스발생기 개회로 연계시험)

  • Kim, Seung-Han;Nam, Chang-Ho;Kim, Cheul-Woong;Moon, Yoon-Wan;Seol, Woo-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2008.11a
    • /
    • pp.125-128
    • /
    • 2008
  • As a interstage of the 30tonf level LOx/kerosene liquid rocket engine development, turbopump-gas generator open-loop coupled tests are performed. Test schematic and test results of open-loop coupled tests are presented. In engine system operation environment simulating combustion chamber by flow control orifice, chill-down procedure, startup characteristics, nominal operability of turbopump+gas generator open-loop coupled Test Plant are confirmed The results of open-loop coupled test were used for the preparation on turbopump+gas generator closed-loop test.

  • PDF

Turbopump+Gas generator Closed-loop coupled test (터보펌프+가스발생기 폐회로 연계시험)

  • Kim, Seung-Han;Nam, Chang-Ho;Kim, Cheul-Woong;Moon, Yoon-Wan;Seol, Woo-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2008.11a
    • /
    • pp.129-132
    • /
    • 2008
  • For the development of the 30tonf level LOx/kerosene liquid rocket engine, turbopump-gas generator closed-loop coupled tests are performed. To simulate engine operation conditions, combustion chamber was substituted by flow control orifices. In simulated engine system operation environment, chill-down procedure, startup characteristics, nominal operability of turbopump+gas generator coupled Test Plant are confirmed. Turbopump and gas generator are confirmed to operate well in simulated engine environment. The control system for regulating power and mixture ratio of Test Plant are also successfully confirmed.

  • PDF

Wake Losses and Repositioning of Wind Turbines at Wind Farm (풍력발전단지의 후류손실 및 터빈 재배치에 관한 연구)

  • Park, Kun-Sung;Ryu, Ki-Wahn;Kim, Hyun-Goo
    • Journal of the Korean Solar Energy Society
    • /
    • v.35 no.3
    • /
    • pp.17-25
    • /
    • 2015
  • The main objective of this study is to predict the wind power generation at the wind farm using various wake models. Modeling of wind farm is a prerequisite for prediction of annual energy production at the wind farm. In this study, we modeled 20 MW class Seongsan wind farm which has 10 wind turbines located at the eastern part of Jeju Island. WindSim based on the computational fluid dynamics was adopted for the estimation of power generation. The power curve and thrust coefficient with meteorology file were prepared for wind farm modelling. The meteorology file was produced based on the measured data of the Korea Wind Atlas provided by Korea Institute of Energy Research. Three types of wake models such as Jensen, Larsen, and Ishihara et al. wake models were applied to investigate the wake effects. From the result, Jensen and Ishihara wake models show nearly the same value of power generation whereas the Larsen wake model shows the largest value. New positions of wind turbines are proposed to reduce the wake loss, and to increase the annual energy production of the wind farm.

The Steady-State Characteristic Analysis of 2MW PMSG based Direct-Drive Offshore Wind Turbine (2MW급 해상용 영구자석 직접 구동형 풍력 발전기의 정상상태 특성 해석)

  • Shin, Pyungho;Choi, Jungchul;Yoo, Chul;Kim, Daejin;Kyong, Namho;Ko, Heesang
    • Journal of the Korean Solar Energy Society
    • /
    • v.35 no.3
    • /
    • pp.9-16
    • /
    • 2015
  • In order to support various studies for assessment of onshore and offshore wind turbine system including foundations, the land-based version of 2MW PMSG direct drive wind turbine has been analyzed using HAWC2 that account for the coupled dynamics of the wind inflow, elasticity, and controls of the turbine. this work presents the steady-state response of the system and natural frequency of the first thirteen structure turbine modes as a function of wind speed. Rotor, generator speeds, pitch angle, power production, thrust force, deflections of tower and blade are compared for one case below and one case above the rated wind speed.

Combination Therapy with Gwakhyangjeonggisangamibang and Sojangjeonggyeok for the Treatment of Verruca Plana (곽향정기산가미방(藿香正氣散加味方) 투여 및 소장정격(小腸正格) 시술을 이용한 편평사마귀의 치료 효과)

  • Yun, Jeong-Min;Shin, Sang-Ho;Yoon, Hwa-Jung;Ko, Woo-Shin
    • The Journal of Korean Medicine Ophthalmology and Otolaryngology and Dermatology
    • /
    • v.23 no.1
    • /
    • pp.169-181
    • /
    • 2010
  • Objective : The purpose of this study was to investigate the effects of Combination therapy with Gwakhyangjeonggisangamibang and Sojangjeonggyeok on patients with verucca plana. Methods : Sixty-five patients(male 19, female 46) with verruca plana were treated with Gwakhyangjeonggisangamibang and Sojangjeonggyeok for at least 3 months. After treatment, a clearance rate was divided into 4 scales such as; complete clearance / partial clearance-good / partial clearance-poor / no change. Statistical analysis was performed by using Independent-sample t-test. Results : Mean age of patients was 30.3 and mean period of disease duration was 64.6 months. Fifty-eight patients(73.8%) showed complete clearance, nine(13.8%) partial clearance-good, and eight(12.3%) partial clearance-poor. Complete clearance group(CC group) was statistically younger than failure group and disease duration of CC group was shorter than failure group. Although treatment period of failure group was statistically longer than CC group and dosage(貼) of herbal medicine of failure group was more than CC group, failure group showed partial clearance. Conclusion : This data demonstrates that combination therapy with Gwakhyangjeonggisangamibang and Sojangjeonggyeok could be an effective and safe treatment for the verucca plana.