• Title/Summary/Keyword: 저수지운영율

Search Result 74, Processing Time 0.029 seconds

An Evaluation of the Emptiness Passage Time of the Kuemgang Estuary Reservoir by Two-Step Transition Model (2단계 추이모형에 의한 금강하구호의 공수도달시간의 평가)

  • Lee, Jae-Hyoung;Chung, Mahn
    • Water for future
    • /
    • v.26 no.3
    • /
    • pp.113-124
    • /
    • 1993
  • This study aims at the evaluation of the stationary distribution and the emptiness passage time for the effectiveness of water utility in the Keumgang estuary reservoir by two-step transition model. It was taken discrete Markovian correlated inflows for the joint probability of inflows and storage, and was used binomial distribution for inflows distribution. As the results, it was decreased from 0.952 to 0.904 the emptiness probability of the reservoir stationary distribution during 1952-1980, and from 0.900 to 0.829 during 1981-1989, and the average emptiness passage time was increased from 23 days to 37 days during 1952-1980, and from 29 days to 61 days during 1981-1989 at low state of storage. From this, it is found that the emptiness passage time is varied with the increase of the inflows auto-correlation coefficient in the Keumgang estuary reservoir. Therefore, it is understood that auto-correlation coefficient must be taken into consideration for the evaluation of water utility in a small reservoir at drought time.

  • PDF

Computerized Decision Support System for Real-time Flood Forecasting and Reservoir Control (홍수시(洪水時) 저수지(貯水池) 실시간(實時間) 운영(運營) 의사결정(意思決定) 지원(支援) 시스템)

  • Ko, Seok Ku;Lee, Han Goo;Lee, Hee Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.12 no.1
    • /
    • pp.131-140
    • /
    • 1992
  • For a real-time flood forecasting and reservoir control problem of a multipurpose dam, the online acquisition of hydro-meteorological data and computerized analysis of the acquired data are absolutely necessary for the prompt decision of reservoir discharges which can minimize the possible damages and simultaneously maximize the utilization of the runoff. By introducing a man-machine interface such as condensed color graphics of the analyzed results, it is much easier and faster to transform the information to the decision maker who can decide the reservoir discharge. The newly developed PC-REFCON, which represents the PC based real-time flood forecasting and reservoir control, can easily handle the above problems by adopting a innovative decision support system. The system has three principal components of, a data base subsystem which acquires and manages real-time data, a model subsystem which forecasts the flood runoff and simulates the reservoir operation, and a dialogue subsystem which helps decision maker and system engineers using various graphics and tables with renovative methodologies. The developed PC-REFCON will be utilized from the coming Summer of 1992 for the flood control of all the nine multipurpose reservoirs in Korea.

  • PDF

Water Balance Analysis in the Yeongsan River and Seomjin River Basins Considering the Real Water Use System (실제 물이용체계를 반영한 영산강·섬진강 유역 물수지 분석 연구)

  • Gwon, Yong Hyeon;Kim, Kwang Hoon;Byun, Dong Hyun;Lee, Byong Ju
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.381-381
    • /
    • 2021
  • 영산강 유역은 타수계에 비해 농경지 비율이 높으며, 영산강 하류에는 나주평야 등 논농사를 하고 있어 농업용수 위주의 물이용율이 높다. 또한 4대호(광주호, 장성호, 담양호, 나주호) 이외의 대규모 다목적댐이 없어 수자원 확보에 어려움이 있다. 섬진강 유역은 유역변경으로 대부분 타수계로 물 공급이 이루어져 하천유량 부족, 섬진강 하류 생태계 피해로 물문제가 지속되고 있다. 이러한 물문제를 해결하기 위해 물관리 일원화에 따른 물이용, 수량, 수질 등을 모두 고려한 효율적인 통합 물관리 방안이 제시되고 있다. 통합 물관리를 위해 유역 내 수자원 이용현황과 물 문제해결 등을 고려한 용도별 최적 물이용 계획 및 효율적인 물관리 운영방안이 중요시되고 있다. 이를 위해서는 지역의 여건 및 특수사항을 고려한 장래 물공급량 변화 및 과부족량에 대해 분석하는 것이 필요하다. 이에 본연구에서는 대상지역인 영산강·섬진강 유역 특성 및 물공급체계를 파악하고 이를 반영한 물수지 분석체계를 구축하여 유역 내 수자원 현황을 파악하고자 한다. 본 연구에서는 실제 물이용체계를 반영하고 용수계통에 따라 자기유역 내 또는 타수계에 대해 용도별 수요량에 따른 공급량, 부족량을 산정하여 그 적용성을 평가하고자 한다. 이를위해 1) 하천수는 유수와 저수로 구분하고 유수는 하천 취수시설의 실사용량을 유역단위 수요량으로 추정, 저수는 다목적댐은 계약량, 농업용저수지는 필요공급량을 개별시설의 수요량으로 설정하여 각각의 수원(저수/유수)에 대한 수요량 대비 공급량과 부족량을 분석하였다. 2) 댐과 저수지는 용수공급조정기준에 따라 공급량을 탄력적으로 적용하고 농업용저수지는 가뭄등급에 따라 하천유지용수를 고려하였다. 3) 주암본댐과 섬진강댐은 송정 수위관측지점의 유량 상황에 따라 환경대응용수를 고려하였다. 4) 주안본댐과 주암조절지댐의 연계 운영을 고려하였다. 물수지 분석 결과 검증을 위해 주요 지점의 관측유량과 물수지 분석을 통해 계산된 유량을 비교하여 적용성 분석을 진행한 결과 상관관계가 높게 분석되었다. 본 연구 결과를 바탕으로 영산강·섬진강 유역 내 효율적인 물관리 방안 수립에 활용될 수 있을 것으로 판단된다.

  • PDF

Development of Method of Evaluating the Appropriateness of Low-level outlet (댐 비상방류시설의 적정성 평가 방법 개발)

  • Kim, Ho Jun;Son, Gwang-Ik;Kwon, Hyun-Han
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.357-357
    • /
    • 2019
  • 최근 한반도에서 예측하기 어려운 지진현상 및 가뭄, 폭우 등 이상기후현상이 지속적으로 발생하고 있다. 댐과 같은 수공구조물의 치수능력부족은 구조물의 파손이나 붕괴로 직결되며, 대규모 재산피해와 인명피해를 야기한다. 이에 댐의 안전성 위험요인들로부터 구조적 안전성을 평가하기 위한 방법에 대한 관심이 높아지고 있다. 비상방류시설은 여수로와 함께 저수지의 저류수를 안전하게 배제시킬 수 있는 구조물로서, 댐 비상상황 발생 시 가능한 빠른 시간 내 댐 수위를 낮춰 댐 손상을 최소화 시킨다. 이러한 점에서 비상방류시설의 적정성 평가하기 위한 방법의 도입이 필요할 것으로 판단되며, 본 연구에서는 비상방류시설의 수위강하율을 산정하여 댐 축조재에 따른 적합성을 평가하는 방법을 제시하였다. 필댐의 경우 5가지, 콘크리트, 석괴댐의 경우 3가지 사항에 대한 수위강하율의 적합성을 고려하였으며, 각각의 고려사항에 대한 결과의 점수화를 통해 비상방류시설의 적정성을 평가하였다. 최종적으로 경과연수가 50년 이상된 필댐을 선정하여 비상방류시설 수위강하율의 고려사항에 대한 적합성 평가를 수행하였다. 본 연구방법은 댐의 안정성 개선을 위한 노후화된 댐의 현황 파악 및 비상방류시설의 적정 운영방안을 수립하는데 있어 보다 합리적인 기준을 제시할 수 있을 것으로 판단된다.

  • PDF

A study on estimation of optimal reserves for multi-purpose reservoirs considering climate change (기후변화를 고려한 다목적댐의 적정 예비율 산정 연구)

  • Chae, Heechan;Ji, Jungwon;Yi, Jaeeung
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.spc
    • /
    • pp.1127-1134
    • /
    • 2018
  • According to the Fifth Assessment Report of the Intergovernmental Panel on Climate Change (IPCC), climate change increases the frequency of abnormal weather phenomenon. As the frequency of abnormal weather phenomenon increases, frequency of disasters related to water resources such as floods and droughts also increases. Drought is the main factor that directly affects water supply. Recently, the intensity of drought and the frequency of drought occurrence have increased in Korea. So, there is a need for water resource securing technology for stable water supply. Korean Water Plan mentioned that water reserves concept is necessary for stable water supply. Most multi-purpose reservoirs in Korea have emergency storage in addition to conservation storage used for water supply. However, there is no clear use standard for emergency storage. This study investigated the use of reservoir reserves for stable water supply. In order to consider the climate change impact, the AR5-based hydrological scenario was used as inflow data for the reservoir simulation model. Reservoir simulations were carried out in accordance with the utilization conditions of emergency storage and water supply adjustment standard. The optimal reserves for each multi-purpose reservoirs was estimated using simulation results.

Variation of Inflow Density Currents with Different Flood Magnitude in Daecheong Reservoir (홍수 규모별 대청호에 유입하는 하천 밀도류의 특성 변화)

  • Yoon, Sung-Wan;Chung, Se-Woong;Choi, Jung-Kyu
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.12
    • /
    • pp.1219-1230
    • /
    • 2008
  • Stream inflows induced by flood runoffs have a higher density than the ambient reservoir water because of a lower water temperature and elevated suspended sediment(SS) concentration. As the propagation of density currents that formed by density difference between inflow and ambient water affects reservoir water quality and ecosystem, an understanding of reservoir density current is essential for an optimization of filed monitoring, analysis and forecast of SS and nutrient transport, and their proper management and control. This study was aimed to quantify the characteristics of inflow density current including plunge depth($d_p$) and distance($X_p$), separation depth($d_s$), interflow thickness($h_i$), arrival time to dam($t_a$), reduction ratio(${\beta}$) of SS contained stream inflow for different flood magnitude in Daecheong Reservoir with a validated two-dimensional(2D) numerical model. 10 different flood scenarios corresponding to inflow densimetric Froude number($Fr_i$) range from 0.920 to 9.205 were set up based on the hydrograph obtained from June 13 to July 3, 2004. A fully developed stratification condition was assumed as an initial water temperature profile. Higher $Fr_i$(inertia-to-buoyancy ratio) resulted in a greater $d_p,\;X_p,\;d_s,\;h_i$, and faster propagation of interflow, while the effect of reservoir geometry on these characteristics was significant. The Hebbert equation that estimates $d_p$ assuming steady-state flow condition with triangular cross section substantially over-estimated the $d_p$ because it does not consider the spatial variation of reservoir geometry and water surface changes during flood events. The ${\beta}$ values between inflow and dam sites were decreased as $Fr_i$ increased, but reversed after $Fr_i$>9.0 because of turbulent mixing effect. The results provides a practical and effective prediction measures for reservoir operators to first capture the behavior of turbidity inflow.

Methodology for Estimating Agricultural Water Supply in the Han River Basin (한강수계의 농업용수 공급량 조사방법의 개발)

  • Im, Sang-Jun;Park, Seung-U;Kim, Hyeon-Jun
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.6
    • /
    • pp.765-774
    • /
    • 2000
  • The purpose of this study are to develop a realistic methodology to estimate agricultural water supply for rice paddy fields from reservoirs, pumping stations, intake structures, and tube wells on river basin scale. Agricultural water supply from irrigation reservoirs are estimated using the daily or ten day's storage rate data and DIROMmaily Inigation Reservoir Operation Model) model. Estimation of daily water supply from pumping station are carried out from the annual water use with typical water supply patterns. The daily groundwater withdrawn are investigated from the gross water requirement for rice and the design capacity of tube well. And, the daily intake discharge are estimated the minimum amount from the gross water requirement, stream discharge, and the design capacity. During 1993 to 1997, the annual water supply for irrigation in the Han river basin ranged from 569 to 709 million $\textrm{m}^3/yr$, and the mean was estimated to be 640 million $\textrm{m}^3/yr$.

  • PDF

Evaluation of Agricultural Water Supply Capacity Using MODSIM (MODSIM을 이용한 농업용수 공급능력 평가)

  • Ahn, So-Ra;Kwon, Hyung-Joong;Park, Geun-Ae;Kim, Seong-Joon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.1442-1447
    • /
    • 2009
  • 본 연구에서는 네트워크 물수지 모형인 MODSIM을 이용하여 36개년(1967-2002) 동안의 물수지 분석을 수행하여 농업용수 공급능력을 평가하였다. 금강권역을 21개의 중권역으로 분할하고 농업용 수리시설(저수지, 양수장, 보, 집수암거, 관정)을 고려한 물수지 네트워크를 구성하였다(Fig.1). 농업용 수리시설의 공급량 및 운영 자료도 추가로 고려하였다. 물수지 분석 결과, 과거 가뭄발생 기간에 농업용수 부족량이 다른 기간에 비해 많이 발생함을 확인할 수 있었으며, 대표적인 가뭄 년인 1994, 1995, 2001년의 부족량은 745.8$(10^6m^3)$, 661.1$(10^6m^3)$, 696.8$(10^6m^3)$로 분석되었다. 또한 36개년 동안의 소유역 평균 용수공급능력은 생 공용수의 경우 99.1%, 농업용수의 경우 84.4%로 비교적 낮은 공급능력을 보였으며, 1994, 1995, 2001년의 농업용수 공급능력은 74.8%, 79.2%, 77.9%로 소유역 평균보다 낮은 수준으로 분석되었다. 농업용 수리시설물의 기여도 평가를 수행한 결과 양수장과 보의 기여율은 32.5%, 집수암거와 관정의 기여율은 4.0%로 분석되었으며, 집수암거와 관정은 양수장과 보에 비해서 상당히 적은 기여율을 갖지만 농업가뭄 해소에 어느 정도 도움을 주는 것으로 분석되었다.

  • PDF

Water-saving Effect by Rotational Irrigation Scheduling System (RISS) in the Dongwha Dam (윤환관개모형 (RISS)에 의한 절수효과 분석 (동화 댐 사례))

  • Kim, Tai-Cheol;Moon, Duck-Young;Lee, Jae-Myun;Moon, Jong-Pil
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.2
    • /
    • pp.147-156
    • /
    • 2012
  • 가뭄강도와 지속기간을 고려하여 관개구역을 몇 개의 관개블록으로 나누어 순차적으로 제한하여 급수함으로써 관개용수를 절약하고 관개기간을 연장하여 가뭄을 극복하는 윤환관개모형 (RISS)을 제안한 바 있다. 이 RISS는 작물생육기별 관개저수지 저수율별 급수구역과 제한 급수율을 제시함으로써 가뭄기간에 저수지 운영자가 언제, 얼마나 제한하여 급수할 것인지 제시해주는 모형으로 전북 남원군 동화댐의 물 관리시스템 자동화 프로그램에 2004년 설치하여 운용되도록 하였다. 이 연구에서는 2004년부터 2009년까지 동화 댐 저수위 관측기록과 급수실적을 분석하여 RISS의 절수효과를 평가하고자 하였다. 그러나 실제로는 동화댐의 물 관리시스템 자동화 프로그램이 계획대로 운용되지 않고 있었다. 따라서 이 RISS의 절수효과와 효용성을 입증하여 계획대로 자동화시스템을 유용하게 활용하도록 하기 위해서 급수실적 및 저수위 관측기록과 RISS로 모의 발생한 저수위 결과를 비교 평가하였다. 모의발생 평가결과 가뭄이 극심했던 2007년에는 3.8백만 $m^3$을 절수하여 관개기간을 23일 연장하고 2009년에는 3.3백만 $m^3$을 절수하여 관개기간을 13일 연장하여 가뭄이 극심한 해에는 RISS 모형의 효용성이 크다는 것을 알 수 있었다.

Application of Subsurface Flow Wetland using the Phragmites australis for Water Quality Improvement of the Agricultural Reservoi (농업용 저수지 수질개선을 위한 지하흐름 갈대 인공습지의 적용)

  • Nam, Gui Sook;Pae, Yo Sop;Kim, Hyung Joong;Lee, Sang Joon;Lee, Gwang Sik
    • Journal of Wetlands Research
    • /
    • v.6 no.4
    • /
    • pp.59-69
    • /
    • 2004
  • Constructed wetlands are regarded as an important water treatment system for agricultural water quality improvement and management. The purpose of this study is to evaluate the application of subsurface flow wetland(SFW), using the Pharagmites australis as macrophytes, and to clarify the basic and essential factors to be considered in the construction and management of constructed wetlands. This study was carried out relatively short hydraulic residence time(HRT), 6hr ~ 72hr (3days), using eutrophic reservoir water with relatively low concentrations of influent and large quantity to be treated. The effluent satisfied the criteria of agricultural water quality. Removal efficiencies of Biochemical oxygen demand(BOD), Chemical oxygen demand(COD), Suspended solids(SS) and Chlorophyll a(Chl-a) were high in HRT 24hr, not any more significant increasement of removal efficiencies in HRT 48hr and 72hr. However, removal efficiencies of nitrogen and phosphorus increased as HRT increased, showing the highest efficiency at the 72hr of HRT in nitrogen, and 48hr in phosphorous. The SFW was very effective system for reservoir water quality improvement, and had the advantages of the reduction of purchasing cost to land required, lack of odors, and harmful insects, especially mosquito, the improvement of the scenic beauty and minimal risk of public exposure. Therefore, it was evaluated that the SFW was very available water treatment system for the water quality improvement of agricultural reservoir. However, it was need to consider with application of the SFW in high cost of construction and troublesome of management.

  • PDF