• Title/Summary/Keyword: 재해위험성

Search Result 683, Processing Time 0.028 seconds

A Study on Risk Transference Processes of Natural Hazard - Focus on the human adjustment according socio-economic structure - (자연재해의 위험성 전이 과정에 대한 연구 - 사회.경제적 구조에 따른 인간의 적응양식을 중심으로 -)

  • Park, Eui-Joon
    • Journal of the Korean association of regional geographers
    • /
    • v.8 no.2
    • /
    • pp.247-255
    • /
    • 2002
  • In recent decades, the characteristics of natural hazard has been changed and the global cost of natural disasters has increased substantially. There are several trends in society and nature that suggest this pattern may continue, with more frequent mega-disasters occurring in the future. In particular, risk perception that is at odds with the "real" risk underlies the process of risk transference increases long-term vulnerability. Therefore investigating the correct risk transference and adjustments according to regional socio-economic structure can mitigate and reduce environmental, so called man-made hazard.

  • PDF

The study of Heavy Rain Warning Information considering Threshold Rainfall and disaster risk (영향한계강우량과 재해위험성을 고려한 호우특보 기준에 관한 연구)

  • Hyeon Ji Lee;Dong Ho Kang;Yong In Song;Byung Sik Kim
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.188-188
    • /
    • 2023
  • 지구온난화, ENSO 등 전지구적인 기후변화 현상으로 위험기상 발생이 증가하고 있다. 한반도는 삼면이 바다에 접하였기 때문에 매우 불안정한 대기로 저기압이 빈번히 통과하는 특징을 가지며, 우리나라는 매년 이상기후로 인한 기상재해로 인명 및 재산 피해가 증가하는 추세를 보이고 있다. 최근 10년간 가장 많이 발생한 피해액 기준 대형 자연재난은 호우로 총 49회 발생하였다. 호우는 다른 기상재해에 비해 발생 시간이 짧고, 공간 규모가 작을 뿐만 아니라 시공간적으로 변동성이 매우 크기 때문에 발생 시 많은 인명 및 재산 피해를 유발한다. 기상청은 호우 외 9가지 기상현상으로 인해 중대 재해 발생이 예상되는 경우 주의를 환기하거나 경고를 예보하는 특보를 발표한다. 현재 사용 중인 호우특보 기준은 기후변화와 위험기상 발생 패턴 변화에 따른 호우 피해와 강우량의 상관성을 고려해 3시간 강우량 개념으로 강우강도, 12시간 강우량 개념으로 누적강우량을 파악할 수 있게 개선한 결과이다. 그러나 지역 특성을 반영하지 아니하고, 하나의 특보 기준 값을 전 지자체에 적용하기 때문에 국지성 집중호우의 지역별 특성을 세세히 반영하지 못하는 등 한계를 보인다. 이와 반대로 영국의 경우 기상특보 기준에 기상현상이 미치는 영향을 포함하였으며, 일본의 경우 우리나라 시군구 개념인 시정촌별로 기상특보 기준을 다르게 설정하여 운영 중이다. 지역 특성을 반영한 해외 기상특보 사례와 달리 우리나라 기상특보는 지역별 위험 및 사회·경제적 취약성을 고려하지 않아 특보 기준 값이 획일화되어 있음을 확인했다. 이에 본 연구는 기상특보 중 호우특보로 연구 범위를 한정하고, 위험기상의 획일적 의사결정 시스템을 보완하기 위해 영향한계강우량과 재해위험성을 고려한 호우특보 기준을 연구하여 제안하고자 한다.

  • PDF

Risk Assessment for Disaster Reduction in Small-Scale Construction Sites (소규모 건축현장 재해감소를 위한 위험성평가 방안)

  • Choi, Hyun-Jun
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.2
    • /
    • pp.395-404
    • /
    • 2022
  • Purpose: Small-scale construction sites have insufficient systematic safety management activities, and due to the characteristics of the construction site, the production structure is complex due to external environmental factors, and the risk of construction equipment is very high. We would like to propose a checklist method among practical risk assessment techniques that can derive risk factors for disaster prevention at small construction sites and reduce disasters. Method: Risk factors were derived by analyzing literature research and disaster cases, and detailed work for a checklist of risk assessment suitable for small-scale construction sites was classified based on risk factor items. Result: Hazard factors were divided into 6 major categories, and 29 detailed types of work were classified based on actual work types, and 80 detailed works were classified accordingly. Conclusion: By arranging risk factors suitable for small-scale construction sites according to the classification system, the lack of expertise in the construction site can be supplemented, and risk factors can be derived more easily and disaster reduction can be expected through establishment of safety measures.

위험기계의 안전

  • 이병곤
    • Journal of the KSME
    • /
    • v.44 no.9
    • /
    • pp.62-66
    • /
    • 2004
  • 기계에 의한 재해는 구조적인 결함에 의한 재해, 작업 중에 발생하는 재해, 가공 중에 재료나 반제품의 운반, 이동시 일어나는 재해, 작업환경으로 인한 재해 등에 대한 안전을 총칭하며, 이러한 기계설비의 안전을 기하려면 그 기계의 구조 및 특성과 작업방법을 숙지하고 그 위험성을 면밀히 검토하여야 한다.(중략)

  • PDF

A Study on The Estimate of Risk Index by job classification for Apartment Construction (아파트공사의 직종별 위험도 산정에 관한 연구)

  • Kim, Dong-Ryeong;Gang, Gyeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.11a
    • /
    • pp.9-23
    • /
    • 2013
  • 건설공사는 인력의존도가 가장 높으며 타 산업에 대비하여 자동화가 매우 낮고 외기에 노출된 작업 환경으로 추락 등의 중대재해 위험이 가장 높은 산업이다. e-나라지표에 의하면 2006년부터 2012년까지 전체 산업의 약 21.9%를 차지하는 건설 근로자가 생산 활동에 종사하고 있으며, 이직 및 인력의 이동이 매우 잦은 특성을 갖고 있다. 2006년~2012년까지의 재해발생 통계에 따르면 전체적으로 타 산업은 매년 다소간의 증감은 있으나 재해가 감소하는 추세이지만, 건설공사의 경우는 지속적으로 증가하고 있다. 특히, 사고성 사망재해의 경우는 7년간 전체 산업에서 발생하는 사고성 사망재해의 평균 40.9%를 건설업이 차지하고 있어 가장 높아 매우 심각한 수준이다. 또한 건설현장과 건설회사의 안전보건경영의 운영방법 및 제도가 매우 단순하고 정성적인 수준으로 타 산업에 비하여 안전경영의 정량화에 대한 노력이 매우 미약하다. 과거 재해사례 및 통계를 분석하여 앞으로의 재해 위험 요소를 제거하거나 안전한 상태로 형성하여야 하나, 발표되는 재해사례나 통계를 구호 또는 슬로건으로 전파, 교육하는 수준에 머물고 있다. 본 연구에서는 아파트공사를 대상으로 2006년~2011년의 과거 재해통계(8,687건)를 분석하여 데이터베이스화하고, 실제 공사한 아파트공사 샘플현장의 자료(89,375명)를 데이터베이스화하여 현 실정에 부합한 정량적 직종별 위험도를 산정하는 연구를 진행하였다. 따라서 아파트공사의 직종별 위험도를 정량적인 데이터로 산출하고, 과학적인 방법으로 현장 위험수준을 실시간 모니터링 함으로써 건설현장의 주된 생산력인 근로자의 생명과 건강을 보호할 수 있는 효과적인 재해예방이 이루어 질 것으로 기대된다.

  • PDF

Analysis of Operation System Establishment Cases for Efficient use of Risk Assessment at Construction Sites - H Focusing on Construction Company Cases (건설현장의 위험성평가 효율적 활용을 위한 운영 시스템 구축사례 분석 - H 건설사 사례중심으로)

  • Jae-Bung Lee
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.4
    • /
    • pp.828-838
    • /
    • 2022
  • Purpose: Through the establishment of a computerized system of risk assessment, the purpose is to analyze the case of whether the co-workers who are subject to the risk assessment at the construction site can easily fill it out and expect disaster reduction through efficient risk assessment activities. Method: By providing the risk factors and safety measures for the work by selecting the type of work, the risk estimation and the establishment of countermeasures can be made, and a system has been established to enable practical disaster prevention activities by presenting disaster cases for the work. Result: Through the analysis of the change in the scaled disaster rate for the years following the on-site application after the establishment of the risk assessment computer system of H Construction Company, it was confirmed that the scaled disaster rate of the domestic construction industry increased, while the conversion disaster rate of H Construction Company decreased. Conclusion: Through the computational systemization of risk assessments, workers in the field can easily access the risk assessment, evaluate the risk factors of the process and establish risk prevention measures, and it has been analyzed that there is an impact on the reduction of the disaster rate during the operational analysis period.

A Study on Integrated Assessment of Baekdu Mountain Volcanic Aisaster risk Based on GIS (GIS기법을 이용한 백두산 화산재해 종합평가 연구)

  • Xiao-Jiao, Ni;Choi, Yun Soo;Ying, Nan
    • Spatial Information Research
    • /
    • v.22 no.4
    • /
    • pp.77-87
    • /
    • 2014
  • Recently there are many disasters caused by volcanic activities such as the eruptions in Tungurahua, Ecuador(2014) and $Eyjafjallaj\ddot{o}kull$, Iceland(2010). Therefore, it is required to prepare countermeasures for the disasters. This study analyzes the Baekdu Mountain area, where is the risky area because it is active volcano, based on the observed data and scientific methods in order to assess a risk, produce a hazard map and analyze a degree of risk caused by the volcano. Firstly, it is reviewed for the research about the Baekdu mountain volcanic eruption in 1215(${\pm}15$ years) done by Liu Ruoxin. And the factors causing volcanic disaster, environmental effects, and vulnerability of Baekdu Mountain are assessed by the dataset, which includes the earthquake monitoring data, the volcanic deformation monitoring data, the volcanic fluid geochemical monitoring data, and the socio-economic statistics data. A hazard, especially caused by a volcano, distribution map for the Baekdu Mountain Area is produced by using the assessment results, and the map is used to establish the disaster risk index system which has the four phases. The first and second phases are very high risky area when the Baekdu Mountain erupts, and the third and fourth phases are less dangerous area. The map shows that the center of mountain has the first phase and the farther area from the center has the lower phase. Also, the western of Baekdu Mountain is more vulnerable to get the risk than the eastern when the factors causing volcanic disasters are equally applied. It seems to be caused by the lower stability of the environment and the higher vulnerability.

Empirical Study of Smart Safety Management System to Increase Construction Disaster Prevention Effect - Centered on Construction Machinery (건설재해 예방 증대를 위한 스마트 안전관리 시스템 실증연구 - 건설기계 중심)

  • Choi, Seung-Yong
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.157-158
    • /
    • 2023
  • 본 연구는 건설기계에 의한 협착 및 충돌재해의 예방을 위해 사용하고 있는 스마트 안전관리 시스템 중 건설기계 근접 방지시스템의 재해예방 효과를 분석하여 그 안전성을 실증하고자 하였다. 건설기계 중 재해다발 및 위험성이 높은 굴삭기를 대상으로 스마트 안전관리 시스템의 유무에 따라 근로자(1,000명 기준)의 행동 변화를 라이다 센스 장비를 활용하여 분석하였다. 근로자-건설기계와 최단 이격거리, 위험구역 내 근로자의 체류시간, 위험구역 주변 근로자의 이동 경로 및 체류시간에 따른 근로자의 분포도 등 근로자의 행동 패턴을 분석한 결과스마트 안전관리 시스템을 설치한 건설기계가 미설치한 건설기계보다 근로자와의 이격거리 확보와 위험구역내 체류시간을 단축한 결과를 도출하였다. 이는 스마트 안전관리 시스템이 건설기계와 관련한 협착 및 충돌 등에 의한 재해로부터 근로자의 안전성을 확보한 결과라 분석되었다.

  • PDF

Produce complex disaster maps centered on local roads through overlay of disaster maps (유역 개념을 이용한 지방도 중심의 복합재해지도 제작)

  • Jo, Hang Il;Jun, Kye Won;Kim, Young Hwan
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.239-239
    • /
    • 2021
  • 최근 기후변화로 인해 국지성 집중호우와 태풍의 발생빈도가 증가하고 있다. 특히 우리나라 국토는 전체면적 중 산지면적이 63%에 해당하여 산지에서 발생하는 산사태와 토석류에 취약한 실정이다. 이러한 피해를 사전에 예방·대비하기 위해 국내·외에서는 재해지도를 제작하여 관리하고 있지만 대부분의 재해지도는 격자형식으로 제작되어 있어 실무자들이 활용하기에는 다소 어려움이 있다. 따라서 본 연구에서는 산지재해에 취약한 강원도 강릉시 지방도를 대상으로 산림청에서 개발한 산사태위험지도와 토석류 위험지도를 중첩하여 복합재해지도를 제작하였다. 먼저 산사태위험지도에 유역의 개념을 도로에 적용하고서 지방도로를 200m 간격으로 분할하여 도로 중심으로 유역을 제작하였으며, 해당 유역에 산사태위험면적과 토석류위험면적 값을 이용하여 도로의 등급을 1등급(매우 위험) ~ 5등급(매우 안전)으로 분류하였다. 또한 복합재해지도 결과의 검증을 위해 SINMAP모형을 이용하여 오차율을 비교분석한 결과 15% 이내인 것으로로 나타났다. 본 연구는 복합재해에 대비 할 수 있는 유역의 개념을 적용한 재해지도를 제작하며 도로관리자의 숙련도에 상관없이 재해지도를 쉽게 이해하고 활용 할 수 있을 것으로 판단된다.

  • PDF

Selection of an Optimal Algorithm for Prevention of Industrial Accidents (산업재해 예방을 위한 최적 알고리즘 선정)

  • Leem, Young-Moon;Hwang, Young-Seob
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.11a
    • /
    • pp.328-331
    • /
    • 2005
  • 산업재해 통계분석의 커다란 목적은 각 산업별로 주 위험요인을 도출하고 이에 따른 안전교육의 실시 또는 안전장치 등을 보완함으로써 산업재해를 줄이거나 예방하는데 있다고 볼 수 있다. 그러나 일반 제조업이나 건설업 등에서는 아직까지도 정량적 위험성 평가 기법이 개발되어 있지 않은 실정이다. 따라서 효율적인 위험성 평가 기법의 개발이 필요하다. 본 연구에서는 데이터마이닝 기법을 이용한 산업재해 예방을 위한 최적 알고리즘 선정 방법을 제시한다.

  • PDF