• Title/Summary/Keyword: 재난 임시대피소

Search Result 3, Processing Time 0.021 seconds

A Study on the Characteristics of Disaster Temporary Sheltering in Terms of Sustainable Design -Focused on the Case of the Wenchuan Earthquake in Sichuan Province- (지속가능성 측면에서 재난 임시대피소의 특성 연구 -쓰촨성(四川省) 원촨(汶川) 지진 사례를 중심으로-)

  • Tian, Hui;Yoon, Ji-Young;Wang, Dan
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.5
    • /
    • pp.877-888
    • /
    • 2021
  • This study used three types of temporary shelters, tents, and prefabricated houses provided by the Chinese government for victims after the Wenchuan earthquake in 2008 as case study objects. Through literature review, 12 evaluation items were selected from the social, economic, and environmental elements of the sustainability of residential space design to analyze and evaluate three types of temporary shelters, and derive their respective characteristics and problems. The analysis results show that the temporary centralized settlements and tents had problems such as imperfect infrastructure, poor sanitation, narrow living space, no personal space, and inconvenience in life. Prefabricated houses had problems such as high construction costs, non-environmentally friendly building materials, occupation of arable land, low recycling rate of materials, and environmental pollution by waste. The common problem of the three types of shelters was that the government took the lead in the construction and distribution of shelters, and the disaster victims passively accept government support. Therefore, disaster victims were not actively involved in the construction and management of temporary communities. Secondly, the designs of all three types of temporary shelters did not fully consider the psychological needs of the victims, especially the need for safe and hygienic personal space. Finally, this research proposes improvement plans for the problems in the sustainable design of three temporary shelters and the construction and management of temporary communities.

Measures to Secure the Habitability of Temporary Shelter for Shelter in Place in Nuclear Power Plant Accidents (원전 사고지역에서 실내대피를 위한 임시대피시설의 거주성 확보방안)

  • Jeongdong Kim;Chonghwa Eun
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.3
    • /
    • pp.582-596
    • /
    • 2023
  • Purpose: This study aims to explore the ways to improve the security of temporary shelters in case of nuclear power plant accidents. Method: In this study, we mainly rely on the case studies on previous nuclear power plant accidents-Chernobyl, Fukushima, and Three Mile Island (TMI) cases. Result: The current radiation emergency response plans for nuclear power plant accidents center around the evacuation procedure. As a result, the concept of "shelter in place" has been understood as a means of assisting resident evacuation. However, based on the case studies, we find that encouraging shelter in place, rather than simply emphasizing evacuation, would help minimize unnecessary casualties, especially in case of the accidents rated greater than or equal to INES 5. To facilitate better shelter in place, we recommend utilize apartments as temporary shelters and suggest some possible improvements to ensure those apartments could be equipped with technologies for high radiation protection. Conclusion: To ensure better shelter in place, we recommend using apartments as temporary shelters, and we seek to supplement the function of apartments by using shielding, positive pressure, and sealing technologies.

Development of Guidebook to Support Victim's Life Recovery and Improvement of Domestic Earthquake Damage Recovery through Earthquake Damage Cases in Korea and Japan (국내외 지진피해 사례를 통한 국내 지진피해 복구 상의 개선방안과 피해자 생활복구 지원 가이드북 개발에 관한 연구)

  • Kim, Su-Ran;Kim, Hye-Won
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.1
    • /
    • pp.470-484
    • /
    • 2020
  • An earthquake of magnitude 5.4 occurred on November 15, 2017 in Pohang, which caused the damage to buildings and facilities. The earthquake displaced more than 1,700 people. After the Pohang Earthquake, immediate emergency, such as the damage survey and running of shelters have been executed appropriately. However there have been issues with subsequent restoration measures, such as the provision of temporary housing and delivery of natural disaster allowance. As there was inadequate government advertisement about the natural disaster allowance, victims of the earthquake could not receive tangible help. In Japan on the other hand where earthquakes are frequent, post-earthquake restoration protocols are planned well in advance. For example, Japanese earthquake victims are provided with a guidebook outlining different types of government aids available for them so that they can rapidly access government aid. In this study, we refer to the case of Pohang earthquake to analyse the problems in the national earthquake restoration plans and propose how they can be improved by comparing it to Japanese post-earthquake case and a Korean equivalent should be developed, to aid Korean earthquake victims to return to their every life as soon as possible.