• Title/Summary/Keyword: 장대터널설계

Search Result 53, Processing Time 0.022 seconds

A Case Study on the Construction of Large Cross Section Tunnel for Underground Ventilation System (지하환기소 대단면 터널 시공 사례 연구)

  • Noh, Seung Hwan;Choi, Sung Wook;Noh, Sang Lim
    • Tunnel and Underground Space
    • /
    • v.27 no.4
    • /
    • pp.195-204
    • /
    • 2017
  • This case study introduces the construction of large cross section tunnel for underground ventilation system in Sillim-Bongcheon Tunnel Project. In order to grant the safety and efficiency in connecting the ventilation shaft (7.8 m of width, and 6.6 m of height) to a tunnel for axial fan facility (20.8 m of width, and 12.3 m of height), gradual enlargement of tunnel cross section was employed between those and temporary support method was determined based on Q system. In addition, some original designs were revised during construction stage to improve the efficiency of excavation in large cross section tunnel. The advance length was optimized and top heading of the tunnel was excavated without partition in accordance with ground condition and numerical stability analysis results. It is believed that some experiences and considerations in this case study will be useful for the future design and construction in similar large cross section tunnel such as large underground ventilation system or road tunnel with four lanes.

A study on the occurrence of cracks in the tunnel pavement in the soil under use (토사구간 공용중 터널 포장부 균열 발생에 관한 연구)

  • Kim, Nag-Young;Lee, Kang-Hyun;Cho, Nam-Hun;You, Kwang-Ho;Baek, Seung-Chol
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.5
    • /
    • pp.749-760
    • /
    • 2017
  • Recently, the proportion of tunnel structures in roads and railways has increased rapidly. Along with this trend, the rate of occurrence of cracks and dropouts in concrete lining of tunnel structures is increasing. Generally, maintenance of such concrete lining is normalized and managed as the core of maintenance work in tunnel maintenance. However, the maintenance of the tunnel pavement is important in securing driver in the tunnel. In the design of tunnels, the underground condition of the tunnel is designed to be in good rock condition, so there have not been many cases of cracks in the tunnel pavement in the past. Recently, the construction of tunnel structures has been rapidly increased, and the length of the tunnels has become longer.Tunnel pavement installed in these ground conditions is increasing the occurrence of cracks in the pavement due to decrease of bearing capacity of the pavement after a long time. In this study, FWD and GPR were conducted to analyze the types of cracks and the reduction of bearing capacity in the tunnel.

Investigation of the surface treatment method for silent pavement in tunnels (터널 내 주행소음 저감을 위한 포장표면처리공법에 관한 조사연구)

  • Park, Tae-Soon;Ko, Seok-Beam
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.4
    • /
    • pp.371-388
    • /
    • 2003
  • The tunnels that longer than 2km which have been recently constructed have serious noise problems resulting from the friction of vehicle wheels and pavement. In special, concrete pavement inside tunnels with a closed characteristic increases discomfort due to the traffic noise and the dust of pavement pollutes the air in tunnels. Therefore, it is urgent that we find out ways to cope with. This study purported to reduce noise inside tunnels covers the investigation of various pavement surface treatment methods adapted in developed countries, the analysis of the effect in noise reduction and construction methods and cases. The surface treatment method for silent pavement in tunnels reduced noise to 5dB (A)~10dB (A). Aggregate treatment method is evaluated the most appropriate method in that, related with other surface treatment method, it reduces noise and improves skid resistance. It is necessary for us to introduce equipments and design and rearrange of specification for the development of the silent pavement method in Korea.

  • PDF

Evaluation of Drain Capacity in Tunnel Drainage System using Drainboard (바닥배수판을 이용한 터널 배수시스템의 통수능 평가)

  • Bae, Gyu-Jin;Lee, Gyu-Phil;Lee, Sung-Won;Shin, Hyu-Soung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.1
    • /
    • pp.13-20
    • /
    • 2006
  • This study proposes a new concept of a tunnel central drainage system by using a drain board to make a breakthrough on difficulties in the installation of conventional drainage system and draw-down of its drain capacity especially in long tunnels. A fundamental study has been performed for evaluation of the drain capacity of the planar drainage system adopted in this study. In fact, the system proposed makes possible to omit the side, transverse as well as central drainage pipes required in the conventional system, even if its drain capacity and any guideline for design are not available to date. In this circumstance, it is carried out to investigate the correlation between drain capacities and, shapes and posit ions of the columns of the drain board in terms of a variety of water inflows through hydrological model tests. It is shown from the tests that a drain capacity is highly influenced by the shape and the distance between the columns of a drain board in flowing direction, and a round rectangular shape of the columns leads to the highest capacity of drainage. And also, the shorter distance between the columns in flowing direction, the higher drain capacity would be achieved.

  • PDF

An analysis study for reasonable installation of tunnel fire safety facility (터널 방재설비의 합리적 설치를 위한 분석적 연구)

  • Park, Jin-Ouk;Yoo, Yong-Ho;Park, Byoung-Jik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.243-248
    • /
    • 2015
  • Domestic road and railroad construction have been increasingly growing and for reasons of mitigating traffic congestion, urban plan and refurbishment project, deeper and longer tunnels have been built. The event of fire is the most fatal accident in a tunnel, and it can be very disastrous with a high possibility. In this study, QRA (Quantitative Risk Analysis) which is one of quantitative risk analysis approaches was applied to tunnel fire safety design and the evaluation of QRA cases and the cost comparison of QRA methods were carried out. In addition analysis of risk reduction effect of tunnel fire safety system was conducted using AHP (Analytic Hierarchy Process) and the priority of major factors that could mitigate the risk in tunnel fire was presented. As a result, significant cost reduction effect could be obtained by incorporating QRA and it is expected to design fire safety system rationally. The priority of fire safety system based on risk mitigation effect by fire safety system considering the cost is in order of water pipe, emergency lighting, evacuation passage and smoke control system.

Case study on design and construction for cross-connection tunnel using large steel pipe thrust method in soil twin shield tunnels underneath airport (공항하부 토사 병설 쉴드터널에서 대구경 강관추진에 의한 횡갱 설계/시공사례 연구)

  • Ahn, Chang-Yoon;Park, Duhee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.5
    • /
    • pp.325-337
    • /
    • 2021
  • On the road and rail tunnels, the evacuation pathway and facilities such as smoke-control and fire suppression system are essential in tunnel fire. In the long twin tunnels, the cross-connection tunnel is usually designed to evacuate from the tunnel where the fire broke out to the other tunnel. In twin shield tunnels, the segment lining has to be demolished to construct the cross-connection tunnel. Considering the modern shield TBM is mostly the closed chamber type, the exposure of underground soil induced by removal of steel segment lining is the most danger construction step in the shield tunnel construction. This case study introduces the excavation method using the thrust of large steel pipe and reviews the measured data after the construction. The large steel pipe thrust method for the cross-connection tunnel can stabilize the excavated face with the two mechanisms. Firstly, the soil in front of excavated face is cylindrically pre-supported by the large steel pipe. Secondly, the excavated face is supported by the plugging effect caused by the soil pressed into the steel pipe. It was reviewed that the large steel pipe thrust method in the cross-connection tunnel is enough to secure the construct ability and stability in soil from the measurement results about the deformation and stress of steel pipe.

A Study on the Reasonable Application Method of Steel Fiber Reinforced Shotcrete in NATM Tunnel (NATM 터널에서 합리적인 강섬유보강 숏크리트 적용방안에 관한 연구)

  • Seok, Chongken;Ahn, Taebong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.9
    • /
    • pp.19-28
    • /
    • 2014
  • Recently, the proportion of long tunnel has increased for efficient use of land due to limited land area, driving convenience and high speed. RMR and Q-System of empirical methods has been mainly used for tunnel support design in domestic. Although shotcrete is the key to NATM tunnel, the related studies are insufficient. So, steel fiber reinforced shotcrete is applied to II~V grade rocks on domestic and foreign applications. And same amount of shotcrete is equally applied to tunnel roof and wall regardless of the applied rock load. Shotcrete is applied excessively rather than the original proposed value of RMR and Q-System. Thus, this study is to reevaluate the application part of plain shotcrete and steel fiber reinforced shotcrete of tunnel in Daebo granite, and to propose the reasonable application method of steel fiber reinforced shotcrete. Field test and numerical back analysis using measurements were performed to verify stability. According to results, if RMR values are the upper class in the III grade, it can be designed in accordance with upper grade. In addition, if rock condition is good as a mountain tunnel in Daebo granite, it can be applied for plain shotcrete to III grade rocks because there is also no stability problems. And although steel fiber reinforced shotcrete is applied only crown of the tunnel in IV grade rocks, it is possible to secure stability for falling rock by key-block.

Conflict analysis and countermeasures due to construction of very-deep tunnels in urban area (도심지 대심도 터널건설에 따른 갈등분석 및 대책)

  • Moon, Joon-Shik;Jeon, Kichan;Kim, Young Geun;Moon, Hoonki
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.6
    • /
    • pp.371-384
    • /
    • 2021
  • Underground space, especially very-deep tunnel development in urban area, is a good alternative to solve the problem of insufficient ground space, and the need for underground space development is steadily increasing. However, due to the complex and time-consuming nature of design and construction, public conflicts related to the deep tunnel project are getting aggravating and more complex. In addition, since the public budget is mainly invested, when civil complaints arise, they often respond passively, resulting in amplification of conflicts or prolonging the deadlock in many cases. In this study, by analyzing the progress of major conflicts related to the construction of very-deep tunnels in urban area, the causes of conflicts, factors prolonging conflicts, and solutions are reviewed. Through a survey targeting ordinary citizens and tunnel experts, thoughts about the deep tunnel construction and major conflict factors were analyzed, and suggestions for minimizing conflicts were presented. The results of this study can be used to prepare alternatives such as various public involvement measures and improvement of project procedures to form a civic consensus on the construction of very-deep tunnels, and to prepare measures to improve prejudice against very-deep tunnels.

Construction Planning and Design of a Long Tunnel (장대 터널의 계획과 설계)

  • 장석부;윤영훈;김용일;김진한
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.117-124
    • /
    • 2000
  • This paper presents the construction planning and the detail design of a 16.2 km long railroad tunnel in a mountainous area. Major design conditions for railroad are the single track, loop-typed alinement, and a maximum grade of 24.5$\textperthousand$. A underground station(double track) with a length of 1.1km is located in the middle of the line for train cross-passing. Tunnel is excavated in highly complex geological conditions including faulted areas, abandoned mine works areas, and various rock types such as sandstone, shale, limestone, and coal seam partly. Drilling and blasting method was adopted because it is more flexible than TBM(Tunnel Boring Machine) as a result of risk assessment for geological conditions in this area. Two working adits were planned to adjust the construction schedule and can be used for ventilation and maintenance in operation phase. New material and concept were introduced to the tunnel drain design. They are expected to improve tunnel drain condition and capability. Rational tunnel support design was tried to consider the various tunnel size and purpose and to use the geological investigation results.

  • PDF

대형 사회기반시설물의 스마트 건전성 평가기술

  • 윤정방;이진학;김정태
    • Journal of the KSME
    • /
    • v.44 no.6
    • /
    • pp.59-67
    • /
    • 2004
  • 최근 교량 및 발전구조물, 고층빌딩과 같은 대형 사회기반시설물의 유지관리를 위한 스마트 계측 및 모니터링 기술에 관한 관심과 연구개발 및 적용사례가 증가하고 있다. 특히 국내에서는 과거 '한강의 기적'이라 일컬어지는 초고속 경제성장과정에서 교량, 터널, 항만, 공항, 발전소, 댐 등 대형 사회기반시설물의 건설이 급증하였으나, 설계 당시에 고려되지 못하였던 각종 하중 조건과 환경 요인으로 인해 구조 건전성(structural integrity)의 저하가 일어나고 있다. 또한 최근 도서생활권의 향상 및 물류비용의 개선, 고속전철사업 등으로 인한 장대 교량의 건설, 효율적 국토이용을 위한 초고층빌딩의 건설, 석유자원의 고갈에 대비한 다양한 형태의 발전구조물의 건설 등이 증가하고 있으며, 이들 사회기반시설물의 유지관리를 위한 스마트 계측 및 모니터링 시스템이 더욱 중요해지고 있다. (중략)

  • PDF