A Method of Applying Work Relationships for a Linear Scheduling Model (선형 공정계획 모델의 작업 관계성 적용 방법)

  • Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.4
    • /
    • pp.31-39
    • /
    • 2010
  • As the linear scheduling method has been used since the Empire State Building linear schedule in 1929, it is being applied in various fields, such as construction and manufacturing. When addressing concurrent critical paths occurring in a linear construction schedule, empirical researches have stressed resource management, which should be applied for optimizing workflow, ensuring flexible work productivity and continuous resource allocation. However, work relationships have been usually overlooked in making the linear schedule from an existing network schedule. Therefore, this research analyzes the previous researches related to the linear scheduling model, and then proposes a method that can be applied for adopting the relationships of a network schedule to the linear schedule. To this end, this research considers the work relationships occurring in changing a network schedule into a linear schedule, and then confirms the activities movement phenomenon of linear schedule due to workspace change, such as physical floors change. As a result, this research can be used as a basic research in order to develop a system generating a linear schedule from a network schedule.

Estimation of Project Duration by Probabilistic Linkage Evaluation Technique (PLET) (확률적 연결관계 평가기법(PLET)에 의한 사업공기 추정)

  • Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.44-52
    • /
    • 2014
  • Generally, the most difficult works at scheduling are to estimate the duration of activities and linkages between them because the possibility that the duration and linkages could be exposed to the uncertainties is so high. When estimating a project duration, therefore, the probabilistic estimation of the duration as well as the probabilistic estimation of the linkages between activities should be considered concurrently. The PERT that is one of the most popular techniques applied for the probabilistic estimation of a project duration can not consider the uncertainties of the linkages because it only estimates the probabilistic duration limited to 'FS0' relationship. The purpose of this study is to propose the new method "PLET" for stochastically estimating the project duration based on the probabilistic estimation of the BDM's relationships, and also provide more wide and various probabilsitic information about the project duration by it.

Intelligent Workbench for Korean Concept-Net Construction (한국어 개념망 구축을 위한 지능형 워크벤치)

  • Hur Jeong;Choi Mi-Ran;Jang Myung-Gil
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2005.07b
    • /
    • pp.472-474
    • /
    • 2005
  • 개념망은 상당히 도메인에 의존적인 언어자원에 해당한다. 따라서, 도메인이 다른 분야에 적용하고자 한다면, 많은 수정이 요구된다. 그러나 개념망의 편집은 언어 이해 능력이 뛰어난 언어학자들 조차도 상당히 많은 시간이 요구되는 작업이다. 대부분의 시간소요는 개념망의 전체적인 계층구조를 스캐닝하는 작업과 특정 노드를 검색하는 작업에 의한 것이다. 기 구축된 개념망을 분석하면 계층관계에 있는 어휘들간의 일관된 규칙을 발견할 수 있다. 이 논문에서는 어휘들의 뜻풀이와 상위어간의 관계성, 복합명사와 상위어간의 관계성을 통계적으로 분석하였다 분석된 결과를 기반으로 확률모델을 이용하여 상위어 추천 기능을 구현하였다. 상위어 추천 기능의 시간 절감 효과를 실험하기 위해 실험자 2인을 대상으로 개념망 구축에 소요되는 시간을 측정하였다. 상위어 추천 기능이 있는 지능형 워크벤치를 이용할 경우 개념망 작업 시간은 약 $65\%$정도로 단축되는 것을 확인할 수 있었다. 본 지능형 워크벤치는 다양한 도메인에서 요구되는 개념망 구축의 시간 비용 절감에 크게 기절할 것으로 기대된다.

  • PDF

A Study on the Effect of Internal and External Control on the Relational Aggression's Perception of the Elderly in Care Facilities (내·외 통제성이 시설거주 노인의 관계적 공격성 인식에 미치는 영향에 관한 연구)

  • Kim, Hee-Jung;Cho, Moo-Sin;Kim, Dong-Hyun
    • The Journal of Korean society of community based occupational therapy
    • /
    • v.11 no.1
    • /
    • pp.1-10
    • /
    • 2021
  • Objective : This study is to know how the internal and external control of the elderly in care facilities affect the relational aggression's perception. Methods : I analyzed the internal and external control and the relational aggression's perception through a survey of the elderly in care facilities. For data collection, 148 of 165 questionnaires, excluding 17 questionnaires with missing questionnaire and middle-level abandonment, were used for the final analysis. Independent variables were the internal and external control, dependent variables were the relational aggression of negative and bullying behaviors, and controlled variables were general sociological characteristics of the elderly. Results : The results were as follows: First, there was a significant difference internal and external control depending on the length of a care facility. Second, there were significant differences in the recognition of relational aggression depending on the level of education, the period of admission, the presence of spouses, and the level of economy. Third, there was a significant difference in comparison of relational aggression perceptions according to internal and external control. Fourth, internal and external control affected the recognition of relational aggression. Conclusion : According to the demographic characteristics, there was a difference in the internal and external control and relational aggression perception of the elderly living in the facilities, and the internal and external control affected the level of relational aggression perception of the elderly in the facilities.

Probabilistic Project Duration Estimation by Combination of PERT and PLET in High-Risk Project (고위험 사업에서 PERT와 PLET기법 결합에 의한 확률적 사업공기 추정)

  • Kim, Seon-Gyoo;Kim, Junyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.71-80
    • /
    • 2016
  • PERT(Project Evaluation and Review Technique) is typical method in order to probabilistically establish the schedule plan for large scale complex project or mega project. PERT technique is impossible to estimate relationship of each activity probabilistically when there are overlapping relationships because it is limited to Finish-to-Start(FS) relationship. In order to overcome this kind of limitation of PERT technique, PLET(Probabilistic Linkage Evaluation Technique) has been suggested to probabilistically estimate project duration for various overlapping relationships for each activity. However, estimating project duration by PLET technique only considers uncertainty of relationship between activities and not activity time, thus it is not the perfect duration estimating method. The main objective of this research is to propose the integration model of PERT and PLET and verify its probabilistic validity. By verifying application of time calculation method of integration model in practical case, this research will suggest probabilistic project duration estimating method in schedule plan of high-risk construction industry.

Method of Transforming PDM Overlapping Relationships to BDM Overlapping Relationships in CPM Schedule (CPM 공정계획의 PDM 중복관계를 BDM 중복관계로 전환시키는 방법)

  • Kim, Seon-Gyoo;Yoo, Jae-Woo;Ko, Dae-Gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.144-152
    • /
    • 2012
  • The reason why most scheduling softwares currently using at construction projects adopt PDM (Precedence Diagramming Method) is that it can express an overlapping relationship between activities. However, the overlapping relationships in PDM are represented only by combinations of four overlapping types that connect the start and finish points of two activities, therefore, PDM cannot express efficiently the relationships between any middle points of two activities if they should be represented. This research proposes the method of transforming the four overlapping types of PDM to the overlapping relationships of BDM(Beeline Diagramming Method), new networking technique, that can connect the inter-relationships at any middle points of two activities as well as express multiple overlapping relationships. The proposed method will help not only to improve an efficiency of scheduling but also to upgrade the scheduling technique because BDM technique has a lot of unique advantages in scheduling.

The Relationship between Sensory Processing Feature, Leisure Participation Type, Perception of Occupational Participation and Quality of Life for University Students' Life Care (대학생의 라이프케어를 위한 감각처리특성과 여가참여유형, 작업참여인식 및 삶의 질과의 관련성)

  • Park, Young-Ju
    • Journal of Korea Entertainment Industry Association
    • /
    • v.13 no.6
    • /
    • pp.203-210
    • /
    • 2019
  • The purpose of this study was to investigate the correlation between sensory processing feature, leisure participation type, perception of occupational participation, and quality of life (QoL) for life care in university students. The survey was conducted from February 2019 to March for 169 university students. The author used the Adolescent / Adult Sensory Profiles (AASP) for sensory processing, and used the leisure activity questionnaire to find out the type of leisure participation, and used the Occupational Self Assessment (OSA) for perception of occupational participation, and the Satisfaction With Life Scale (SWLS) for QoL. Pearson correlation analysis was used for the relationship between sensory processing feature, leisure participation type, perception of occupational participation, and QoL. Among the sensory processing feature, there was a positive correlation between low registration and sports. And there was a positive correlation between sensory seeking and sports, social activities, tourism. There was a negative correlation between perception of occupational participation and low registration, sensory sensitivity, sensory avoiding. Hobbies, appreciativeness and social activities showed a significant positive correlation with perception of occupational participation. And also there was a positive correlation between perception of occupational participation and QoL (p <.05, p <.01). Sensory processing feature correlated with leisure participation type, occupational participation perception, and QoL. Future research should develop evaluation tool for leisure activities, occupational participation and QoL based on sensory processing.

전자서명법 제정추진

  • Korean Associaton of Information & Telecommunication
    • 정보화사회
    • /
    • s.123
    • /
    • pp.70-71
    • /
    • 1998
  • 정보통신부는 정보화의 진전에 따라 증가하고 있는 전자문서 및 인터넷 전자상거래의 안정성.신뢰성 확보를 위하여 전자서명법(안)을 마련. 그동안 산.학.연등 관계전문가로 작업반을 구성, 7차에 걸친 작업회의를 통해 마련된 이 법(안)은 98년 정기국회 제출 목표로 5월부터 관계부처 및 PC통신을 이용한 전자공청회 등 여론수렴에 들어갔다. 그러나 구체적인 입법시기는 UN국제상거래법위원회의 전자서명 통일규격 제정작업 등 해외동향을 고려햐여 신중히 추진해 나갈 계획이다.

  • PDF

Prediction model of whole-body postural discomfort for automobile assembly tasks (자동차 조립 작업에서의 전신 자세 불편도 예측 모델)

  • 이인석;정민근;기도형;김상호
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.792-796
    • /
    • 2002
  • 관찰적 작업자세 평가기법은 각 관절의 자세를 관찰 기록하여 자세 부하를 평가하는 실용적인 인간공학적 작업평가 기법이다. 본 연구에서는 각 관절의 불편도 지수와 전신의 자세 부하의 관계성을 모형화하고, 전신의 작업자세 부하를 평가하는 방법론을 제시하였다. 자동차 조립공정의 대표적인 작업자세들을 대상으로 하여 정적인 자세의 심물리학적 부하를 전신에 대하여 평가하였다 전신의 불편도는 비중립 자세를 취하고 있는 각 관절의 조합에 의해 영향을 받는다. 특히, 자동차 조립공정에서는 어깨 높이 이상의 작업을 대상으로 하는 경우에 어깨, 목, 허리, 손목 등에서 비중립 자세를 동시에 취하여 전신의 불편도가 큰 것으로 나타났다. 평가된 전신의 불편도와 각 자세의 관절별 불편도 지수의 관계를 다중선형회귀모형으로 모형화하는 것이 타당한 것으로 나타났다. 모형에서 전신 불편도에 가장 큰 영향을 미치는 관절은 어깨이며, 손목의 영향이 가장 적은 것으로 나타났다. 이 모형을 통해 작업자세 부하를 정량적으로 평가하는 것이 가능할 것으로 기대된다.

  • PDF

EFFICIENT DEADLOCK DETECTION POLICY BASED ON THE RESOURCE SHARE PLACES IN PETRI NETS (자원 공유 플레이스의 관계행렬을 이용한 효율적인 교착상태 확인 정책)

  • Kim, Jong-Woog;Cha, Jeong-Won;Lee, Jong-Kun
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2008.06b
    • /
    • pp.24-29
    • /
    • 2008
  • 여러 개의 작업이 동시에 작동 할 때 서로 다른 작업에서 특정한 로봇이나 장치를 사용하기 위하여 상대방의 작업이 끝나기를 기다리는 상태를 교착상태라 하며 생산공정에서는 효율성과 경제성 제고에 가장 중요한 문제 중 하나다. 지금까지 이러한 교착상태 확인은 도달성(reachability)기법이나 서브넷(Subnet)으로 분리하여 분석하는 기법 등이 가장 많이 사용 되었으나, 분석에 필요한 시간과 노력, 복잡성과 효율성에 있어서 효과적이지 못한 단점을 가지고 있다. 본 연구는 페트리넷(Petri Net)에서 모든 플레이스(Place) 간의 관계를 나타내는 추이(Transitive)행렬을 이용하여 교착상태가 나타날 가능성이 있는 자원공유 플레이스(Place)를 분석하여 교착상태를 검증하는 정책을 제시한다. 이를 위하여 교착상태를 확인할 수 있는 자원공유 플레이스의 관계를 정의하고, FMS(Flexible Manufacturing System) 모델을 이용하여 제안한 알고리즘의 성과를 검증한다.

  • PDF