• Title/Summary/Keyword: 작업지연요소

Search Result 75, Processing Time 0.026 seconds

Development of Relocation Method for Construction Materials using FP-Growth (FP-Growth 기법을 활용한 건자재 재고 재배치 기법 개발)

  • Lee, Hyo-Jun;Kim, Jae-Won;Shin, Kwang Sup
    • The Journal of Bigdata
    • /
    • v.2 no.1
    • /
    • pp.49-58
    • /
    • 2017
  • The inventory location is the mos important factor which decide the efficiency of picking orders. According to the inventory location, it is possible to optimize the route for picking order, and then it makes us to expect the cost reduction and efficiency improvement. However, it is practical situation to make decisions where to keep the products based on manager's intuition and experience, not based on the systematical or analytical approach. In this research, with the practical order data of cropper product and layout for the storage yard, the association rules have found, and then the new methodology has been devised to make the decision where to keep the inventory. By utilizing the practical order data for a year, it has been proved that the proposed approach can reduce the total distance of the all routes for picking order and solve the problem of delayed delivery.

  • PDF

Performance Evaluation of PDP System Using Realtime Network Monitoring (실시간 네트워크 모니터링을 적용한 PDP 시스템의 성능 평가)

  • Song, Eun-Ha;Jeong, Jae-Hong;Jeong, Young-Sik
    • The KIPS Transactions:PartA
    • /
    • v.11A no.3
    • /
    • pp.181-188
    • /
    • 2004
  • PDF(Parallel/Distributed Processing) is an internet-based parallel/distributed processing system that utilizes resources from hosts on the internet in idle state to perform large scale application through parallel processing, thus decreasing the total execution time. In this paper. do propose an adaptive method to be changed network environment at any time using realtime monitoring of host. It is found from experiments that parallel/distributed processing has better performance than its without monitoring as an adaptive strategy, which copy with task delay factor by overload and fault of network, be applicable to the cockpits of task allocation algorithm in PDP.

Human Resource Allocation Method using Similarity between Software Project Experience and WBS Activity (S/W 프로젝트 수행 경험과 WBS Activity의 유사도 측청을 통한 인력 할당 기법)

  • Kwon, Jinyong;Lee, Euijong;Baik, Doo-Kwon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2015.04a
    • /
    • pp.530-533
    • /
    • 2015
  • 기존의 조사에 따르면 현재 소프트웨어 개발 프로젝트의 실패율은 높은 편이다. 미국의 The Standish Group의 보고서에 따르면 소프트웨어 프로젝트의 성공률은 약 32%로 낮음을 볼 수 있다. 소프트웨어 프로젝트 성공에 영향을 주는 요소 중 하나는 인력배치이다. 이는 소프트웨어 개발 프로젝트의 참여 인력 구성에 따라 생산성, 비용 및 개발기간이 달라지게 되기 때문이다. 즉 인력 구성에 따라 프로젝트 성공률에 많은 영향을 주게 될 수 있다. 프로젝트 인력할당은 WBS(Work Breakdown Structure)에 따라 PM(Project Manager) 또는 부서장이 할당하게 되는데, 이들은 프로젝트 구성원들의 상세한 정보까지 파악이 어렵기 때문에 인력구성의 어려움이 존재한다. 과거에 수행했던 개발 프로젝트에서 유사성이 높은 작업을 했음에도 불구하고 전혀 경험이 없는 작업에 할당되면 상대적으로 업무 지식습득에 어려움을 겪고 시간 지연에 따른 비용이 추가적으로 발생하게 된다. 이러한 문제를 해결하고자 본 연구는 소프트웨어 개발 프로젝트 구성원의 상세한 정보들과 소프트웨어 개발 업무와의 유사도 측정을 통해 인력을 업무에 할당하는 기법을 제안한다. 이를 위하여 제안한 기법을 프로토타입으로 구현한 후 현업에서 실제 개발되는 프로젝트에 적용하여 제안 기법의 우수함을 평가한다.

다중프로세서 컴퓨터시스템을 위한 버스중재 프로토콜의 성능 분석 및 비교

  • 김병량
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1992.10a
    • /
    • pp.2-2
    • /
    • 1992
  • 최근 여러 분야에서 컴퓨터의 용도가 확산되고 더 높은 computing power에 대한 요구가 증가함에 따라, 컴퓨터의 성능을 향상시키기 위하여 프로세서의 고속화와 함께 시스템 구조의 개선을 위한 많은 연구가 진행되고 있다. 한 시스템내에 여러 개의 CPU들이 존재하는 다중프로세서 시스템(multiprocessor system) 구조를 가진 슈퍼미니급 중형 컴퓨터들은 상호연결망으로서 버스(bus) 방식을 많이 채택하고 있다. 버스 구조는 하드웨어가 간단하여 구현이 용이하지만, 여러 개의 시스템 지원들(프로세서들, 기억장치 모듈들 및 입출력 모듈들)이 버스를 공유하기 때문에 경합으로 인한 지연 시간이 발생하게 된다. 이러한 지연 시간으로 인한 성능 저하를 개선하는 방법으로는 버스 수의 증가와 최적 통제 프로토콜의 설계가 있다. 본 연구에서는 여러 개의 버스를 가진 다중프로세서 시스템에서 4가지 대표적인 버스 중재 프로토콜들에 대해 성능을 분석, 비교하여 최적 프로토콜을 제시하고자 한다. 이러한 대규모 하드웨어에 의하여 구현되는 시스템에서 주요 설계 요소들에 따른 시스템 성능 분석과 비교는 설계 단계에서 필수적인 과정이다. 그러나 하드웨어를 만들어서 분석하는 방법은 시간과 비용이 많이 소요되기 때문에 소프트웨어 시뮬레이션 방법이 널리 사용되고 있다. 본 연구팀에서는 시뮬레이션 전용언어인 SLAM II를 이용하여 다중프로세서 시스템의 시뮬레이터를 개발하고, 버스중재 프로토콜(bus arbitration protocol)을 용이하게 변경할 수 있도록 하여 각각의 성능을 비교하였다. 이 연구에서 비교된 프로토콜들은 고정-우선순위 방식(fixed-priority scheme), FIFO(first-in first-out) 방식, 라운드-로빈 방식(round-robin scheme), 및 회전-우선순위 방식(rotating-priority scheme) 등이다. 실험은 시스템의 주요 요소들인 프로세서와 기억장치 모듈 및 버스의 수들을 변경시킴으로써 다양한 시스템 환경에 대한 분석을 시도하였다. 작업 부하가 되는 기하장치 액세스 요구간 시간가격(inter-memory access request time interval)은 필요에 따라서 고정값 또는 확률 분포함수를 사용하였다. 특히, 실행될 프로그램의 특성에 따라 각 프로토콜의 성능이 다르게 나타날 수 있음을 검증하였으며, 기억장치의 지역성(memory locality)에 대한 프로토콜들의 성능도 비교하였다.

  • PDF

A Study on e-SCM Framework in Small and Medium Enterprises with Agent (에이전트를 이용한 중소기업의 e-SCM 프레임워크에 관한 연구)

  • Kim, Yeong-Hun;Im, Sang-Hwan;Eom, Wan-Seop
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.237-240
    • /
    • 2004
  • 공급망관리(SCM:Supply Chain Management)는 자신의 비즈니스를 개선하고자 노력하는 대부분의 기업들에게 있어서 핵심 목표가 되고 있다. 공급망최적화(SCO:Supply Chain Optimization)는 이러한 개선 노력의 중심 목표로서 등장했으며, 보다 높은 수준의 고객 만족을 제공하기 위해, 공급망 구성원들이 최상의 업무 수행 사례를 공유하여 공급망 상호작용의 최저 원가와 최고 효율 시스템을 개발하기 위한 조직화 된 노력을 의미한다. 이러한 공급망에서 성과를 내기 위해서는 각 구성 요소들 사이의 조정과 협력이 필요하다. 그러나 기업내부와 기업외부의 환경의 동적인 면으로 인해 이러한 조정에 어려움이 있다. 예를 들면 공급업체로부터 원자재 도착시간의 지연, 생산 설비의 고장, 작업자의 질병, 고객의 주문에 대한 취소 및 변경을 계획의 변화를 유발시킨다. 몇 가지의 경우에는 지엽적으로 다루어 질 수 있지만 대부분의 경우는 공급망의 여러 기능들 사이에서 다루어져야만 한다. 이에 따라 본 연구에서는 중소기업의 각 프로세스를 최적화시키기 위해 에이전트를 이용한 e-SCM 프레임워크를 구축하고, 시뮬레이션 기법을 통해 그에 따른 성과를 제시한다.

  • PDF

KISS Korea Computer Congress 2007 (이동 에이전트의 적응적 이주 경로 기법 설계)

  • Kim, Kwang-Jong;Ko, Hyun;Lee, Yon-Sik
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2007.06d
    • /
    • pp.483-488
    • /
    • 2007
  • 이동 에이전트는 에이전트 코드 자체가 서버로 이동하여 주어진 작업을 수행한다. 이 때 이동 에이전트의 노드 이주 방법은 분산 시스템의 전체 성능에 큰 영향을 줄 수 있는 요소가 된다. 따라서 본 논문에서는 네이밍 에이전트의 메타데이터를 이용한 이동 에이전트의 적응적 이주 경로 기법을 제안한다. 제안 기법에서 노드 이주의 선택은 참조된 메타데이터의 정보에 의존하며 이주 정보의 신뢰성은 멀티 에이전트의 각 에이전트 시스템들의 상호 협력 및 메타데이터 갱신 방법에 의해 결정된다. 이를 위해 적중 문건 수, 적중률, 노드 처리 및 네트워크 지연 시간 등의 정보로 메타데이터를 설계하고 이를 이용하는 각 에이전트의 상호 관계와 적중 문건의 수에 따라 이동 에이전트 노드 이주를 결정하기 위한 메타데이터의 생성, 이용 및 갱신하는 방법을 기술하며, 순회 노드 수 결정 방법과 우선순위에 따른 이주 경로에 대한 방법을 제시한다.

  • PDF

Reusing XML Objects in Context-Aware Workflow Model for Improving the Development of Service Scenario (서비스 시나리오 개발 프로세스를 개선시키기 위한 상황인지 워크플로우 모델에서 XML 객체의 재사용)

  • Yoo, Yeon Seung;Mun, Jong Hyeok;Kim, Do Hyung;Choi, Jong Sun;Choi, Jae Young
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.9 no.6
    • /
    • pp.121-130
    • /
    • 2020
  • In order to provide customized services according to a specific user or environment, various service scenarios should be developed based on context-aware workflow model. As the context-aware workflow model is constructed using limited context information and service information in the service domain, overlapping elements can occur in many service scenarios. The repetitive work process that results from these overlapping elements delays the development process of the service scenario. Therefore, the elements of the context-aware workflow model must be reused to solve the unnecessary work processes of service scenario development. In this paper, we propose a reuse method XML Object in context-aware workflow model to improve the process of service scenario development. The proposed method documents and manages the independent XML Object of the context-aware workflow model and reuses it by invoking the unit document in the service scenario development process. It can also be applied to new service scenarios by changing the attribute values of reusable elements. Experiments show example that the development process of the service scenario is simplified by reusing the elements of the context-aware workflow model.

The Phenomenology of Quitting: Effects from Repetition and Cognitive Effort (중단의 현상학: 반복과 인지적 노력의 효과)

  • Lynn, Margaret T.;Riddle, Travis A.;Morsella, Ezequiel
    • Korean Journal of Cognitive Science
    • /
    • v.23 no.1
    • /
    • pp.25-46
    • /
    • 2012
  • When performing a monotonous task, one often experiences an urge to quit. This urge may vary depending on how long one has performed the task (a temporal factor) and on which particular component of the task one is carrying out (an event-based factor). Using the Stroop task and a working memory task, we examined changes in the urge to quit as a function of basic temporal (repetition) and event-based (cognitive conflict) factors. Consistent with the law of least work and recent theorizing, for the memory task, urges to quit were greater following difficult trials; for the Stroop task, urges to quit were greater following incongruent than congruent trials, but only during early/novice phases of performance, when responding is inefficient. This is a demonstration of an avoidance response toward cognitive conflict. Regarding temporal sources of quitting, urges to quit were greater for late task stages than early stages. These basic findings may illuminate the nature of the more 'hot' motivational struggles involving the delay of gratification.

  • PDF

Continuous improvement plan of manufacturing process through real-time data acquisition (실시간 정보획득을 통한 제조공정의 지속적인 개선 방안 연구)

  • Jo, Sung-Ho;Chang, Tai-Woo;Shin, Ki-Tae;Na, Hong-Bum;Park, Jin-Woo
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.14 no.4
    • /
    • pp.75-90
    • /
    • 2009
  • Improvement of productivity and efficient process management need to define the problem of the previous work. If it takes long time to gather necessary information, it becomes difficult to continuously manage processes to satisfy customers' needs and to enhance business efficiency. This paper proposes methods and a context awareness system for decision making to solve problems originated in management of manufacturing process through real-time information acquisition. We implement the context awareness by suggesting decision logics that automatically classify works with acquired information. And we also implement a system for case study which makes workers recognize problems and notifies instructions to them. Consistency between real object and stored data and continuous process monitoring with this system could find inefficient resources or delayed works, resolve them and improve processes efficiency.

Implementation of Sonar Bearing Accuracy Measurement Equipment with Parallax Error and Time Delay Error Correction (관측위치오차와 시간지연오차를 보정하는 소나방위정확도 측정 장비 구현)

  • Kim, Sung-Duk;Kim, Do-Young;Park, Gyu-Tae;Shin, Kee-Cheol
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.20 no.4
    • /
    • pp.245-251
    • /
    • 2019
  • Sonar bearing accuracy is the correspondence between the target orientation predicted by sonar and actual target orientation, and is obtained from measurements. However, when measuring sonar bearing accuracy, many errors are included in the results because they are made at sea, where complex and diverse environmental factors are applied. In particular, parallax error caused by the difference between the position of the GPS receiver and the sonar sensor, and the time delay error generated between the speed of underwater sound waves and the speed of electromagnetic waves in the air have a great influence on the accuracy. Correcting these parallax errors and time delay errors without an automated tool is a laborious task. Therefore, in this study, we propose a sonar bearing accuracy measurement equipment with parallax error and time delay error correction. The tests were carried out through simulation data and real data. As a result of the test it was confirmed that the parallax error and time delay error were systematically corrected so that 51.7% for simulation data and more than 18.5% for real data. The proposed method is expected to improve the efficiency and accuracy of sonar system detection performance verification in the future.